Annex 9 — 선박에서의 오염방지에 관한 규칙

287033 · 2026-07-01

■ Rules on the Prevention of Pollution from Ships [Appendix 9] <Amended Sep. 11, 2019> Target vessels and timing required to be equipped with damage stability hull structures, etc. (Related to Article 15, Paragraph 3, Subparagraph 1) 1. Damage Restoring Hull Structure Oil tankers with a gross tonnage of 150 tons or more that were delivered after June 1, 1982 are [attached] 14. However, 1989 Oil tankers whose keels were laid before June 30 of the year and which are engaged exclusively in domestic voyages are Exclude. 2. Cargo tank capable of preventing large oil spills Oil tankers for which construction contracts were concluded between January 1, 1974, and December 31, 1975 (construction In the case where a contract was not concluded, those for which the keel was installed after June 30, 1974) and vessels delivered after June 1, 1982 are a large quantity of oil tankers pursuant to Item 1 of Annex 12 It must be equipped with a cargo tank structured to prevent oil leakage. However, in 1989 6 Oil tankers whose keels were laid before the 30th of the month and which are engaged exclusively in domestic navigation are excluded. . 4. Double bottom structure of the pump room Oil tankers with a deadweight tonnage of 5,000 tons or more constructed on or after January 1, 2007 are subject to Attached Table 12 The pump room shall be equipped with a double bottom structure in accordance with subparagraph 2. 5. Accidental oil outflow performance prevention structure Oil tankers delivered on or after January 1, 2010, oil spill prevention pursuant to Subparagraph 3 of Annex 12 must have a geological structure. 6. Structure of Sea Chest Valves and Onboard Isolation Valves Oil tankers delivered on or after January 1, 2010, with cargo-related equipment in the sea chest Oil tankers with a gross tonnage of 150 tons or more connected in a specific manner shall have sea chest valves and onboard isolation valves , and in this case, during loading, transport, or unloading of cargo, the body To ensure that the two devices are not directly connected between the START valve and the onboard isolation valve piping, a blind Devices such as a START plate (Blind Patch) must be installed.