Annex 8 — 선박에서의 오염방지에 관한 규칙

287033 · 2026-07-01

■ Rules on the Prevention of Pollution from Ships [Appendix 8] <Amended June 30, 2021> Technical Standards for Oil Pollution Prevention Equipment (Related to Article 15, Paragraph 2) 1. Oil leak prevention device a. The oil leak prevention device drains the oil from the oil tray and the oil collected in the oil tray into the drain tank or fuel tank. It must be equipped with the necessary manpower for sending to the START. B. The grease tray must meet the following criteria. 1) Material: Must be metal 2) Structure: In the case where the vessel is inclined 10 degrees longitudinally or 22.5 degrees transversely It will also be something where the oil does not overflow or fly away. 3) Installation Location: Oil Tank · Oil Level Gauge · Oil Pump · Filter · Boiler Firebox · Oil Purifier · Injection Valve Valves or cocks of test devices, main engines, auxiliary engines, oil-carrying pipe systems, etc. Install under devices where there is a risk of oil leakage. 2. Bilgewater Storage Tank a. Bilge water storage tanks shall be equipped with the following facilities. 1) Bailwater storage tank 2) Device for determining the location of the wastewater surface 3) Bilge pump (a pump that transfers bilge water to storage tanks and receiving facilities) a. The capacity of the bilge holding tank shall be as determined by the following formula It must be greater than or equal to the START value (the I/V value for vessels without propulsion systems shall be 4.8). C: Capacity of bilge water storage tank (㎥) I: The following value (nautical miles) according to the vessel's navigation area, route, etc. However, the maximum value of I to 16V. 1) Vessels operating on regular routes Sailing distance from the relevant route to a port capable of accommodating bilge water Longest distance during START 2) A vessel with an irregular route The straight-line distance of the longest part of the vessel's navigation area (a single port Round-trip distance when navigating around the center) V: Speed ​​of the vessel during sea trials (knots) q: 0.00044 × Gross tonnage of the vessel 3. Oil filter a. The oil filtration device is a filtration device and a pump (as a device for transferring bilge water to an oil-water separator) It must have performance suitable for the capacity of the oil-water separator)ㆍFilter and drain Must be equipped with a device. B. The filtration device shall meet the following criteria. 1) The oil filtration device is capable of separating the oil concentration of the discharge liquid to 15 parts per million or less will have performance Even when tilted 22.5 degrees in any direction from the horizontal plane, its performance is not impaired. 을 것 3) During the navigation of a vessel, its performance is not impaired due to swaying, vibration, etc. of the hull thing to do 4) It shall be a structure that facilitates inspection and cleaning and prevents the leakage of bilge water . In addition to the standards specified in subparagraph (b), the filtration device shall have the treatment capacity according to the following table must. ┏━━━━━━━━━━━┯━━━━━━━━━━┓ ┃Gross tonnage of the vessel(G) │Hourly processing capacity (㎥) ┃ ┠───────────┼──────────┨ ┃G<1,000 │0.00044G ┃ ┃1000?G<40000 │0.4+0.00004G ┃ ┃G?40,000 │2 ┃ ┗━━━━━━━━━━━┷━━━━━━━━━━┛ 4. Meteorite Dregs Tank a. The capacity of the oily residue tank shall comply with the following standards. 1) Vessels that do not carry ballast water in fuel oil tanks V1(Minimum capacity of meteorite residue tank)=K1CD(㎥) K1: For vessels using cleaned heavy fuel oil for main engines, 0.01(1990 Vessels built after December 31 (0.015), diesel fuel or cleaning are not required For vessels using heavy fuel oil, 0.005 C: Daily Fuel Consumption (㎥) D: Maximum sailing period (days) between ports where meteoroidal debris can be discharged onto land (30 days if the duration of the voyage cannot be determined) 2) Vessel loading ballast water into fuel oil tanks V2(Minimum capacity of meteorite residue tank)=V1+K2B(㎥) K2: 0.01 for heavy fuel tanks, 0.005 for diesel fuel tanks B: Capacity of ballast water tanks that can also be used for the transport of fuel oil (㎥) 3) A vessel equipped with incineration facilities pursuant to Article 46, Paragraph 2 of the Act Minimum capacity for vessels with a gross tonnage of 400 tons or more and less than 4,000 tons: 1 m³ (December 31, 1990 are the larger of 1㎥ and 0.5V1) Minimum capacity for vessels with a gross tonnage of 4,000 tons or more: 2 m³ (built after December 31, 1990 The vessel that has been started is the larger of 2㎥ and 0.5V1) b. Complies with the following standards to facilitate the discharge of oily residue into the receiving facility and internal cleaning. must be. 1) To facilitate cleaning operations, so that all parts inside the tank are accessible A sufficient number of manholes must be provided. For oily residue tanks of ships refining and using heavy fuel oil, appropriate heating equipment Equipped with other suitable devices capable of facilitating the discharge of oily residue or grease, ya must. The oily residue tank has a dedicated pump for discharging the contents of the tank to the receiving facility Install a pump, provided that the characteristics of the liquid substance being pumped, the size and location of the tank, and the total discharge amount It must have an appropriate format and capacity considering the time required. The oily residue tank is connected to the bilge water system, bilge water storage tank, or oil-water separator. shall not. However, this shall not apply in any of the following cases. 1) Manually operated automatic shut-off valve or to an equivalent level, the sediment water of the oily sludge tank When installing a device for discharge 2) Connect the oily sludge discharge pipe and the bilge water pipe to the common pipe leading to the standard discharge connector permitted, the transfer of oily residue to the bilge water pipeline through the common pipe is If not Planetary sludge tanks shall not be directly connected overboard except for standard discharge connections. 되다. 5. Discharge pipe device a. The discharge pipe system transfers bilge water or oily residue from the storage tank to the receiving facility It must be equipped with a pipe device capable of performing [unclear] and a standard discharge connection. However, the structure and [unclear] of the vessel concerned [unclear] Considering the amount and viscosity of the generated sludge, etc., the Minister of Oceans and Fisheries recognizes that there is no hindrance is performed, a standard discharge connection port may not be provided. B. The standard discharge connector shall conform to the following criteria. 1) It shall be a material of steel or equivalent properties 2) having sufficient strength for an operating pressure of 6 kilograms per square centimeter [6 kg/㎠] th 3) Must meet specifications equivalent to the following ┏━━━━━━━━━━━━━┯━━━━━━━━━━━━━━━━┓ ┃Item │Specification ┃ ┠─────────────┼────────────────┨ ┃OuterDiameter │215㎜ ┃ ┠─────────────┼────────────────┨ ┃InnerDiameter │Suitable diameter for connecting pipes ┃ ┠─────────────┼────────────────┨ ┃Diameter of a bolt circle │183㎜ ┃ ┠─────────────┼────────────────┨ ┃Flange groove width │22㎜ ┃ ┠─────────────┼────────────────┨ ┃Flange thickness │20㎜ ┃ ┠─────────────┼────────────────┨ ┃Diameter and Quantity of Bolts and Nuts │each with a diameter of 20 mm and a suitable length ┃ ┃ │'s ┃ ┗━━━━━━━━━━━━━┷━━━━━━━━━━━━━━━━┛ 6. Bilgewater Concentration Alarm Device a. The bilge water concentration alarm device shall meet the following criteria. 1) Able to issue a visible and audible alarm when any of the following conditions apply th a) When the oil concentration of the discharge liquid exceeds 0.0015% [15 ppm] b) When there is a malfunction in the oil content measuring function ) When a failure occurs 2) The error occurring when measuring the oil concentration of the discharge liquid is within 0.0005%[5ppm] th 3) Measure the oil concentration within 20 seconds after the discharge liquid begins to pass through the device and can be instructed 4) It shall be a structure capable of appropriately calibrating the device and adjusting the measurement sensitivity 5) It shall have the function to measure the concentration of effluent containing a large amount of oil 6) Even when tilted 22.5 degrees in any direction from the horizontal plane, its performance is not impaired 을 것 7) Performance is impaired due to hull shaking, vibration, etc. occurring during navigation thing that will not be based B. Bilge water concentration of vessels navigating exclusively in special international waters and vessels with a gross tonnage of 10,000 tons or more The alarm device [activates] when the oil concentration of the discharged liquid exceeds 0.0015% [15 ppm]. It must be equipped with a device capable of automatically stopping START. . The bilge water concentration alarm device must be within 5 years after calibration or at the shorter of the interval determined by the manufacturer It must be calibrated at intervals by the manufacturer or a person authorized by the manufacturer. In this case, Instead of performing calibration, it can be replaced with a calibrated bilge water concentration alarm. 7. Ballast Water Discharge Pipe System a. The ballast water discharge system shall comply with the following standards. 1) There shall be a discharge port for discharging into the ocean and receiving facilities. However, ballast water... Vessels that discharge only into facilities shall not install discharge ports for discharge into the ocean can be. 2) Ballast There shall be a device for stopping the discharge of water. However, the monitoring location and the discharge well between a place with a support device This shall not apply to lines. The outlet to the ocean is above the waterline with maximum ballast water loaded. and connected to the side of the vessel. However, in the case of discharging ballast water, do not. 4) Manifolds for discharge to the receiving facilities shall be installed on both sides of the ship on the exposed deck b. Ballast water arrangement for oil tankers required to install separate ballast water tanks or crude oil scrubbing facilities The outlet device shall comply with the following standards in addition to the standards under Item (a). 1) Receiving facilities and cargo holds or mixture tanks for oil remaining in cargo oil pumps and pipes A device capable of transferring via START shall be installed 2) The device of 1) shall include a small-diameter tube conforming to the following criteria a) to be connected to the outside of the vessel's manifold valve b) The cross-sectional area of ​​the small-diameter pipe shall be within 10% of the cross-sectional area of ​​the main cargo discharge pipe. However, 1982 that already have a main cargo discharge pipe section This shall not apply in cases where small-diameter pipes within 25% of the area are installed. 8. Oil Discharge Monitoring and Control Device a. The oil discharge monitoring and control device comprises an oil concentration meter, flow meter, speed meter, monitoring and recording device, and automatic discharge Equipped with a dispatch stop device (limited to oil tankers with a deadweight tonnage of 4,000 tons or more) and an operating device A statement must be kept on file. B. The oil concentration meter shall comply with the following standards. 1) The error occurring when measuring the oil concentration of the discharged liquid is the Within the greater of 20% or 0.001% [10ppm] 2) Can automatically input alarms regarding the measured oil concentration into the monitoring recording device th 3) Measure the oil concentration within 20 seconds after the discharge liquid begins to pass through the device It must be a structure capable of being directed 4) It shall be a structure capable of appropriately calibrating the device and adjusting the measurement sensitivity 5) It shall be a structure capable of measuring the concentration of effluent containing a large amount of oil 6) Must comply with the standards set forth in Subparagraph 3, Item (b), 3) and 4). . The flow meter shall comply with the following standards. 1) Manufactured of a material having corrosion resistance to seawater and oil 2) The measurement error of the instantaneous discharge flow rate throughout the entire discharge process shall be within 15% 3) Information regarding the measured flow rate shall be automatically entered into the monitoring and recording device. However, in the case of oil tankers with a deadweight tonnage of less than 4,000 tons, manual input is possible . 4) Must comply with the standards set forth in Subparagraph 3, Item (b), 3) and 4). . The speed meter shall comply with the following standards. 1) Speed ​​represented numerically must be able to be displayed down to the 0.1 knot unit When displaying speed on a scale, mark the scale at least every 0.5 knots and 10 marks must have clearly written a number for each 3) That which can indicate reverse speed must be able to indicate the direction of travel of the vessel The speed display must be easy to read. Speed ​​can be measured with an error within the greater of 5% or 0.5 knots. th 6) Information regarding the measured speed shall be automatically entered into the monitoring and recording device. However, for oil tankers with a deadweight tonnage of less than 4,000 tons, it can be entered manually. 7) Must comply with the standards set forth in Subparagraph 3, Item (b), 3) and 4). E. The monitoring recording device shall comply with the following standards. 1) Information regarding the following emissions is continuously recorded by a counting recorder, and the recorder The clause will be able to be preserved for 3 years a) Instantaneous discharge concentration of oil and discharge rate of oily mixture b) Instantaneous discharge rate of oil and total discharge amount of oil per nautical mile d) Discharge time and date ra) Ship's speed e) Operating status of the emission monitoring device 2) Be able to emit a visible and audible alarm in the following cases a) When the instantaneous discharge rate of oil exceeds 30 liters per nautical mile (a) When the total discharge of oil fractions exceeds 1/30,000 of the total volume of cargo oil (1979 For vessels delivered before December 31, in the case of oil tankers, 1 in 15,000 When exceeding) d) If the oil concentration meter, flow meter, or speed meter malfunctions or other failures occur When it occurs 3) Operate simultaneously with the start of discharge 4) Must comply with the standards set forth in Subparagraph 3, Item (b), 3) and 4). B. In cases where the automatic discharge stop device is required to issue an alarm in accordance with the provisions of Subparagraph 2), discharge . 9. Ballast Water Concentration Monitoring Device a. The ballast water concentration monitoring device shall be equipped with an oil concentration meter and a monitoring recording device. B. The oil concentration meter shall comply with the following standards. 1) The error occurring when measuring the oil concentration of the discharge liquid shall be within 5 parts per million 2) Must comply with the standards set forth in subparagraphs 2) through 6) of Item 8(b) . The monitoring recording device must comply with the following standards. 1) Be able to emit a visible and audible alarm when corresponding to 1 below a) When the oil concentration exceeds 0.0015% [15 ppm] b) When there is a malfunction in the oil content measuring function ) When a failure occurs 2) Continuously record oil concentration and discharge time, and operate simultaneously with the start of discharge th 3) Must comply with the standards set forth in Subparagraph 3, Item (b), 3) and 4). 10. Mixing tank device a. The mixture tank device must be equipped with a mixture tank, a mixture transfer device, and a water-oil boundary detector. . B. The mixing tank shall comply with the following standards. 1) The capacity of the tank (or the total capacity if there are two or more mixing tanks) is the total cargo It shall be at least 3% of the cargo volume. However, the Minister of Oceans and Fisheries, considering the cleaning method It may be reduced if it is recognized that there is no hindrance. 2) The mixture transferred to the mixing tank is not excessively mixed and oil-water separation is well It will be a structure that can be formed . The mixture transfer device is a device that transfers cargo hold washing water, oily ballast water, etc., to the mixture tank As a START, considering the structure of the vessel, etc., appropriately equip the necessary pipe fittings, pumps, etc. must be dancing. d. The flow-water boundary detector shall comply with the following criteria. 1) For any type of oil, with an error margin of within 25 mm, mixture tanks or cargo The position of the water-flow boundary of the window can be measured quickly A mixture tank or cargo hold equipped with a fixed water-oil boundary detector is a cargo hold , the impact generated by cleaning is sufficient It will have withstandable strength 3) Possess sufficient corrosion resistance against seawater, oil, and inert gases 4) Must comply with the standards set forth in Subparagraph 3, Item (b), 3) and 4). 11. Separated Ballast Water Tank A. A separate ballast tank is a separate ballast tank that, when installed on an oil tanker, only in the said separate ballast tank... It must be installed in compliance with the following standards while loaded. However, the vessel's For oil tankers with a length of less than 150m, which the Minister of Oceans and Fisheries deems appropriate , it is not so. 1) The form draft at the midpoint of the ship's length (referring to the vertical distance from the upper surface of the keel to the waterline ) is greater than or equal to the value calculated according to the following formula 0.02L+2.0(m) L: Ship length(m) 2) The stern inclination shall be 15/1000 of the length of the vessel or less The propeller will be able to be completely submerged in water. a. Delivered on or after June 1, 1982, with a deadweight tonnage of 20,000 tons transporting only crude oil Installed on oil tankers and oil tankers with a deadweight tonnage of 30,000 tons or more that transport only refined oil. Separated ballast water tanks must comply with the following placement requirements in addition to the standards under subparagraph (a). . ∑PAc+∑PAs?J[Lt(B+2D)] PAc: Location other than the ballast water tank or oil tank (side perpendicular to the linear centerline The area (㎡) projected onto the side plating of the ship (limited to those with a defined width of 2m or more) PAs: A place other than a ballast water tank or oil tank (the minimum depth is B/15 or 2m) B: Ship's width(m) D: Ship's shape depth(m) Lt: Length between the front and rear ends of the cargo hold area (m) J: The value calculated according to the following formula or 3/10, whichever is greater DW: Deadweight Tonnage 12. Clear Ballast Water Tank a. It shall have a capacity suitable for the requirements of the separated ballast water tank b. It shall be connected to a ballast water concentration monitoring device installed for monitoring the discharge of ballast water. . The Clear Ballast Water Tank Operation Guidelines explaining the system and operation method of the Clear Ballast Water Tank will be equipped 13. Cargo Changwon Oil Washing Facility a. The cargo tank oil scrubbing facility comprises a scrubber, a scrubber pump, scrubbing piping, and a stripping device. must be equipped and an operation manual must be kept on hand. B. The cleaning machine shall comply with the following standards. 1) Possess sufficient corrosion resistance against seawater, oil, and inert gases Fixedly installed in each cargo hold and capable of sufficiently withstanding the loads generated during operation will be installed The operating status should be verifiable from the outside of the cargo hold. 4) Each can be isolated by a stop valve installed in the cleaning piping 5) Shut-off of the cleaning supply piping in preparation for removing the cleaning unit installed on the deck It shall be equipped with devices necessary for closing the START and cargo hold openings. 6) In cases where the drive unit of the cleaning machine is separate and independent, the drive unit is said to be the cleaning machine and moving be equipped with a sufficient number of drive units so as not to be used 7) Characteristics of the scrubber according to nozzle diameter, operating pressure, motion method, and motion cycle are [related to] the [related to] the [related to] the It shall be suitable for water window cleaning The number and location of washers installed in each cargo hold shall comply with the following criteria. Only, vessels delivered prior to December 31, 1979, with complexes inside specific cargo holds In cases where structural members are installed and it is difficult to apply to each cargo hold individually, the entire cargo hold . a) Due to the structural materials inside the cargo hold, the cleaning oil sprayed from the cleaner reaches directly is the area of ​​the bottom surface of the cargo hold and the top surface of the structural material It must be within 10% of the total combined horizontal area. b) Due to structural materials inside the cargo hold, the cleaning oil sprayed from the cleaner reaches directly The vertical rectangular area that is not [unclear] is 15% of the total vertical area including the upper wall area of ​​the cargo hold. It will be within The scrubber pump can sufficiently supply cleaning crude oil when the scrubbers are operated simultaneously. must be. d. Cleaning piping shall comply with the following standards. 1) Securely fixed to the hull with sufficient strength to withstand operating pressure willbe 2) Install an overpressure protection device connected to the suction pipe of the scrubber pump in the scrubbing fluid supply pipe thing to do 3) In cases where a seawater valve is connected for cleaning the cleaning piping, the connection part with the seawater pipe can be blocked with a blocking plate, etc. 4) The oil remaining inside the pipe can be easily removed E. The stripping device shall comply with the following criteria. 1) It shall be designed so that no crude oil or crude oil residue remains at the bottom of the cargo hold 2) Performance capable of sucking in 1.25 times the total amount of cleaning fluid maximum sprayed from the scrubber will be 3) sucking up oil remaining in cargo oil pumps and piping and transferring it to the cargo hold and land can be 4) There shall be equipment for monitoring operational performance B. Cargo hold crude oil washing facilities shall be one year after the vessel first engaged in crude oil transportation or three times Until the later of the points in time when the crude oil transport voyage was completed, from the Head of the Regional Maritime Affairs and Fisheries Office The validity of the equipment requirements from subparagraphs (b) through (e) must be verified. 14. Incineration Equipment a. Incineration facilities must be equipped with an incinerator or an liquefaction device. B. The incinerator shall comply with the following standards. 1) Materials, Structure, and Installation of Incinerators a) Materials used for major parts shall have fire resistance and corrosion resistance. b) Allows for easy inspection and maintenance d) It shall be sufficiently able to withstand hull swinging and vibration d) Parts with high heat or a risk of fire shall be equipped with appropriate heat insulation measures e) Before ignition, ventilate the inside of the incinerator sufficiently to discharge any remaining gas. there will be f) Drain, etc. shall not flow down from the bottom of the incinerator Inc.) The incinerator must be one that does not leak combustion gases, and the discharged combustion gases shall not be re-inhaled into the vessel a) The input port of an incinerator for solid waste must be free from the risk of flame backflow. Except for the START unit, double doors shall be installed. ) For self-igniting incineration equipment, fuel shall be supplied after the ignition device is activated 차) In cases where waste oil, waste, and fuel are automatically supplied, their supply can be adjusted will be K) The smoke passage of the incinerator shall not be connected to the exhaust pipe of the internal combustion engine, and 2 The smoke passages of incinerators above are connected to each other or connected to the connecting passage of a boiler , combustion gas shall not flow back into a stopped incinerator or boiler T) Installed on a sturdy base with sufficient space for inspection, repair, and operation will be 2) Safety Devices and Alarm Devices a) When the incinerator exceeds the limited temperature or the flame is lost, the waste oil or the supply of waste and fuel will be stopped b) A hearing and visible alarm device shall be activated in the following cases (1) When the power to the alarm device is cut off (2) When the cooling device is stopped (limited to having a cooling device) (3) When waste oil, waste or fuel is supplied by pressure spraying, the spraying of these When the pressure is lowered respectively (4) When the blower for combustion stops due to failure (5) When the incinerator exceeds the limited temperature or the flame is lost 3) Measuring device and calibration instrument a) having sufficient durability and not being affected by motion, vibration, and moisture of the hull The following measuring device shall be present in each incinerator. (1) 1 temperature measuring device (2) One pressure gauge each for displaying the spray pressure of waste oil, waste or fuel (3) Flow meter (limited to incineration of hazardous liquid substances) (4) Device capable of continuously measuring carbon monoxide, carbon dioxide and oxygen concentrations (Limited to incineration of organochlorine compounds) b) to the incineration of organochlorine compounds and waste pursuant to Article 2, subparagraph 1 of the Waste Management Act In cases where the incinerator used is installed in a closed location, the gas emitted from the incinerator A gas detector shall be installed in a suitable location so that gas can be quickly detected. 4) Ventilation and other devices a) If an incinerator is installed in a closed space, a suitable ventilation system for that space There will be a START value b) The pipe sucking the substance from the waste oil or liquid waste tank is the tank wall To be connected to a valve or cock attached to START c) The valve of b) or the installation location shall be operable even outside of the said location The emulsification apparatus shall comply with the following standards. 1) Materials, Structure, and Installation of Emulsifier a) Materials used for major parts shall have fire resistance and corrosion resistance. b) Allows for easy inspection and maintenance d) It shall be sufficiently able to withstand hull swinging and vibration d) The contents of the oily residue mixing tank can be treated into a uniform and combustible mixture there will be e) Capable of effectively removing hard solids from oily residue b) Possess emulsification capability appropriate to the capacity of the combustion device Company) The supply or cessation of waste oil is automatically [manual] depending on the ignition and extinguishing of the combustion device willbeexecuted 2) Measuring device Having sufficient durability and not being affected by motion, vibration, moisture, etc. of the hull shall have the following measuring device in each emulsifying device a) One pressure gauge each for displaying pressure before and after emulsification treatment b) A temperature measuring device capable of measuring the temperature of an oily residue mixing tank and an emulsification device 1 each 3) Oily Sediment Mixing Tank and Piping a) The pipe sucking oily residue from the oily residue mixing tank is attached to the wall of the said tank To be connected to a fitted valve or cock b) The oily residue mixing tank shall have the following connecting pipes or devices (1) Fuel oil supply connection pipe (2) Air pipe with a cross-sectional area of ​​1.25 times or more than the injection pipe (3) A sufficiently sized overflow pipe (4) Appropriate drain discharge device (5) A mixing device capable of effectively mixing contents (6) Liquid level indicator ) The piping contains the contents of the oily residue mixing tank and the contents of other fuel oil tanks, etc. This can prevent mutual backflow d) The piping shall be of a structure that prevents the accumulation of oily residue e) The piping is connected to a device for incinerating oily residue and is not connected outside the vessel. Nihal geot