■ Enforcement Decree of the Special Act on the Creation of Yongsan Park [Attached Table 2]
Standards for Yongsan Park Occupancy Permit (Related to Article 20, Paragraph 2)
1. General Standards for Occupancy Permits
a. The objects of occupation shall be arranged so as not to impair the landscape and park functions of Yongsan Park,
must.
b. Occupying facilities, excluding temporary structures and structures, in cases where it is unavoidable for the purpose of occupation
Otherwise, it must be installed underground.
The structure of the object of occupation installed on the ground prevents tipping over or collapsing, etc.
It shall be ensured that there is no hindrance to the preservation of park facilities and the use of the park.
must be recorded.
a. The structure of the object of occupation installed underground shall be sturdy and durable for a long time
It must not impede the preservation of park facilities and other occupied objects, and the use of the park.
.
E. The act of occupation shall not impair the landscape of Yongsan Park, the preservation of park facilities, or the use of the park.
shall ensure that no harm occurs due to the act of occupation
must be.
f. It shall not violate relevant laws and regulations, such as the "Building Act."
G. The period of the occupancy permit for Yongsan Park shall be within 3 years.
A. A person who has obtained a permit to occupy Yongsan Park [receives] an extension of the occupancy period after the period has ended.
In the case of intending to extend the period, you must submit a request to the Yongsan Park Management Office 30 days prior to the expiration of the period.
must apply. In this case, the Yongsan Park Management Authority [regarding] interference with the management and operation of Yongsan Park
The period of occupancy may be extended to the extent that there is no START.
J. In cases where the Yongsan Park Management Authority has granted a permit for the occupancy of Yongsan Park, [the Authority] [regarding] the fulfillment of the contents of the permit
Supervise, and if necessary, have the permit holder conduct a boundary survey before construction.
can request.
2. Detailed Standards for Occupancy Permits
A. Installation of utility poles, power lines, substations, and telecommunications facilities
1) Electric wires shall be installed underground unless unavoidable.
2) Substations shall be installed underground, and the uppermost part of the facility shall be 3 meters from the ground
터 이상 되도록 할 것
Telecommunications facilities shall be installed underground, and the telecommunications conduit at the top of the facility
Ensure the end is at least 1.5 meters above the ground.
B. Installation of water pipes, sewer pipes, gas pipes, and utility tunnels
1) Water pipes, sewer pipes, gas pipes, and common conduits shall be installed underground, and the main line
The uppermost part of the facility shall be at least 1.5 meters above the ground. However, the weight
Main line of a sewer pipe installed underground in a place with a high risk of water pressure
shall ensure that the uppermost part of the facility is at least 3 meters above the ground
Matters concerning the safety of gas pipelines shall be in accordance with the provisions of the "City Gas Business Act"
을 것
. Installation of roads and railways: Roads and railways must be installed underground, and underground
The facility to be installed shall have its uppermost part at least 3.0 meters above the ground.
thing
d. When the managing authority of Yongsan Park recognizes that it is necessary for the management and operation of Yongsan Park
Installation of a temporary structure: The duration shall be 3 months or less
E. Short-term temporary structures or single-unit structures installed for sports, assemblies, exhibitions, fairs, or performances
Installation of temporary works
1) The term of existence shall be within one year
2) The purpose of the permit must be for the development of culture, arts, education, science, etc.