Annex 4 — 철도의 건설 및 철도시설 유지관리에 관한 법률 시행령

262339 · 2024-05-17

■ Enforcement Decree of the Act on the Construction of Railways and Maintenance of Railway Facilities [Appendix 4] <Amended Dec. 19, 2023> Timing of Performance Evaluation and Criteria for Performance Grades (Related to Article 31, Paragraphs 1 and 5) Timing of performance evaluation a. The first performance evaluation shall be conducted on the date of confirmation of completion pursuant to Article 16 of the Act (Completion , it refers to the date permission was obtained 5 It shall be carried out within one year from the date the year begins. a. The timing for conducting performance evaluations shall be every 5 years based on the date the previous performance evaluation was completed. implements. . Implementation of performance evaluation during construction for the expansion, renovation, or repair of railway facilities In cases where the time has arrived, the date on which the construction is completed (confirmation of completion pursuant to Article 16 of the Act In the case of the START subject, the date of completion confirmation, and in the case of a permit for use prior to completion, refers to the date the use permit was granted. Based on 1 year (hereinafter the same in this table) . . In the case of replacing railway facilities, the performance evaluation of the relevant railway facilities is for the replacement It may be implemented within one year from the date that marks five years from the date the construction was completed . E. In cases where the time for conducting a performance evaluation arrives during construction for the replacement of railway facilities In this case, in consultation with the Minister of Land, Infrastructure and Transport, 5 years from the date of completion of the construction It may be implemented within one year from the date of START. B. Performance evaluation pursuant to Article 40 of the Special Act on Safety and Maintenance of Facilities If START has been conducted, it shall be deemed that a performance evaluation has been conducted, and the timing thereof shall be adjusted. can do. Company. If the business plan is changed pursuant to Article 12 of the "Railway Business Act" or the "Railway Industry Development Agency Pursuant to Article 34 of this Act, specific routes and stations have been abolished, and the use of railway facilities is... In cases where it is specified, the performance evaluation must be completed prior to the date the use of the relevant railway facility resumes. can be implemented. 2. Performance Grade Criteria a. Performance Grade The performance grade is determined by comprehensively considering the evaluation of each detailed item in Subparagraph B, and the [former] [former] [former] of the following table [former] . ┌──┬────┬──────────────────────────────────┐ │Grade│EvaluationContent│Performance Level │ ├──┼────┼──────────────────────────────────┤ │A │Excellent │There are no external defects or damage, and the likelihood of reduced durability is low. │ │ │ │...and a performance level capable of accommodating changes in external environmental conditions, etc. │ ├──┼────┼──────────────────────────────────┤ │B │Good │Minor defects or reduced durability in some members and parts │ │ │ │A possibility has been discovered, and whether to proceed considering external environmental conditions, etc. │ │ │ │and a decision on maintenance │ ├──┼────┼──────────────────────────────────┤ │C │ordinary │There is a possibility of defects or reduced durability in a wide range of components and parts. │ │ │ │Although some issues regarding functionality or convenience of use have been discovered, │ │ │ │Simple maintenance or that does not impede the safety of the overall railway facilities │ │ │ │Performance level requiring reinforcement and improvement │ ├──┼────┼──────────────────────────────────┤ │D │Insufficient │Because performance does not meet standards, the continued use of railway facilities │ │ │ │Performance requiring urgent repair, reinforcement, or improvement to a difficult level │ │ │ │level │ ├──┼────┼──────────────────────────────────┤ │E │Defective │due to serious defects or reduced durability, the safety of railway facilities │ │ │ │Use immediately at risk or to the point of failure to function │ │ │ │Performance level requiring suspension and reinforcement or reconstruction │ └──┴────┴──────────────────────────────────┘ B. Evaluation by Detailed Item 1) Safety Assessment: Degree of apparent defects at the time of investigation and the [unclear text] applied to railway facilities Damage, collapse, or functional failure that may occur in railway facilities due to heavy loads, etc. The performance of railway facilities capable of withstanding shall be evaluated according to the following criteria. ┌──┬────┬──────────────────────────────────┐ │Grade│EvaluationContent│Performance Level │ ├──┼────┼──────────────────────────────────┤ │A │Excellent │Performance level free from risk of external defects, damage, or collapse │ ├──┼────┼──────────────────────────────────┤ │B │Good │Minor defects were discovered in some components/parts, and the progression of the defect... │ │ │ │must continuously observe whether maintenance is required and decide whether to perform │ │ │ │Performance Level │ ├──┼────┼──────────────────────────────────┤ │C │Normal │Although defects were found in a wide range of components and parts, the overall iron │ │ │ │There is no impediment to the safety of urban facilities, and simple repairs or reinforcements │ │ │ │Required performance level │ ├──┼────┼──────────────────────────────────┤ │D │Insufficient │Urgent repair and reinforcement are required for serious defects, and some │ │ │ │Performance level requiring usage restrictions │ ├──┼────┼──────────────────────────────────┤ │E │Faulty │Due to serious defects, there is a risk to the safety of railway facilities, that is, │ │ │ │Prohibit the use of each and require reinforcement or replacement. │ └──┴────┴──────────────────────────────────┘ 2) Durability Evaluation: Material properties according to the elapsed service period of railway facilities and external environmental conditions The performance of railway facilities resisting damage that may occur due to changes in properties is as follows END criteria. ┌──┬────┬──────────────────────────────────┐ │Grade│EvaluationContent│Performance Level │ ├──┼────┼──────────────────────────────────┤ │A │Excellent │A low likelihood of reduced durability due to external environmental conditions │ │ │ │Performance Level │ ├──┼────┼──────────────────────────────────┤ │B │Good │A possibility of reduced durability was discovered in some components and parts │ │ │ │The decision regarding maintenance must be made by considering conditions such as the external environment. │ │ │ │is a performance level │ ├──┼────┼──────────────────────────────────┤ │C │ordinary │Potential for reduced durability in a wide range of components and parts has been discovered │ │ │ │It had progressed to a level requiring attention or simple repairs were necessary. │ │ │ │Yoonhan performance level │ ├──┼────┼──────────────────────────────────┤ │D │Insufficient │Durability is declining in a wide range of components and parts, so urgent │ │ │ │Performance level requiring maintenance or replacement │ ├──┼────┼──────────────────────────────────┤ │E │Fault │Durability is severely declining in a wide range of components and parts, │ │ │ │Performance level requiring immediate prohibition of use and maintenance or replacement │ └──┴────┴──────────────────────────────────┘ Usability Evaluation: Considering the expected demand for railway facilities, must be secured during the usage period Satisfying user convenience and the purpose of use based on design standards at the time of planning The performance of railway facilities for this purpose shall be evaluated according to the following criteria. ┌──┬────┬──────────────────────────────────┐ │Grade│EvaluationContent│Performance Level │ ├──┼────┼──────────────────────────────────┤ │A │Excellent │Satisfying current demand, etc., and accepting future demand and changes in external conditions, etc. │ │ │ │Available performance levels │ ├──┼────┼──────────────────────────────────┤ │B │Good │While satisfying current demand, etc., regarding future demand and changes in external conditions, etc. │ │ │ │Performance level requiring close observation and attention │ ├──┼────┼──────────────────────────────────┤ │C │Normal │Function performance or usage in response to future demand and changes in external conditions │ │ │ │Performance level requiring improvement due to some issues with convenience │ ├──┼────┼──────────────────────────────────┤ │D │Insufficient │Most functions fall short of the required functions or operation and │ │ │ │In extensive areas where usability is of serious concern │ │ │ │Performance level requiring improvement in START │ ├──┼────┼──────────────────────────────────┤ │E │Fault │Improvement or modification as performance of function or convenience of use cannot be expected │ │ │ │Required │ └──┴────┴──────────────────────────────────┘