■ Enforcement Decree of the Mountain Area Management Act [Table 7] <Amended June 16, 2026>
Methods and Standards for Economic Evaluation of Quarrying (Related to Article 34, Paragraph 3)
1. Methods and Contents of Quarrying Economic Feasibility Assessment
A. Methods and Contents of Geological Survey
(1) Investigation Method
Geological surveys are conducted using methods such as outcrop surveys, electrical resistivity surveys, and ultrasound.
Sahanda.
(2) Investigation Content
(A) Types of Rocks and Their Developmental Distribution and Characteristics
(b) Outcrops and weathered alteration zones of rock bodies subject to excavation and extraction of stone materials
Developmental stage of the belt)
(C) Geological Structure and Fracture Development Characteristics
(d) Other matters necessary for geological survey
B. Methods and Contents of Drilling Exploration
(1) Drilling method
The boreholes for drilling exploration are in accordance with the Korean Industrial Standards pursuant to the "Industrial Standardization Act" (hereinafter referred to as "Korean
Using a diamond core bit for drilling, etc., in accordance with the industrial standard (hereinafter referred to as the "Industrial Standard"), underground
Drilling is performed using the excavation (digging) method, and the recovered core must be at least 5 cm in size.
(2) Drilling Details
A person who intends to obtain a permit for the extraction of earth and stone (limited to stone materials) shall, for each earth and stone extraction area, the following
Drilling must be carried out in accordance with the number of boreholes and total drilling depth of .
Only, drill according to the following number of boreholes and total drilling depth to evaluate the economic feasibility of quarrying
If the relevant soil and rock extraction area is reduced in accordance with the law or other laws after completion
can skip additional drilling.
┏━━━━━━━━━━━┯━━━━━━━━━┯━━━━━━━━━━━━━━━━┓
┃Soil and rock extraction area │Drilling count │Total Drilling Depth ┃
┠───────────┼─────────┼────────────────┨
┃10,000㎡ or more, less than 20,000㎡ │3 items or more │Over 150m ┃
┠───────────┼─────────┼────────────────┨
┃20,000㎡ or more, less than 30,000㎡ │5 or more │Over 300m ┃
┠───────────┼─────────┼────────────────┨
┃30,000㎡ or more, less than 100,000㎡│6 or more │350m or more ┃
┠───────────┼─────────┼────────────────┨
┃100,000㎡ or more │100,000㎡ in 6 openings │350m in 100,000㎡ ┃
┃ │Exceeding │Excessive soil and rock extraction area ┃
┃ │Soil and rock extraction area │At least 50m for every 30,000㎡ ┃
┃ │Every 30,000㎡ Minimum │Additionally summed depth ┃
┃ │Add 1 each │or more ┃
┃ │More than the summed count │ ┃
┗━━━━━━━━━━━┷━━━━━━━━━┷━━━━━━━━━━━━━━━━┛
(3) Previously, stone was excavated and extracted after obtaining a permit for the extraction of earth and stone (limited to stone)
In cases where stone is to be excavated or extracted adjacent to a permitted area where the earth and stone extraction permit was granted,
The previous earth and stone extraction permit adjacent to the project site for which a permit (limited to stone materials) is sought
(Limited to stone materials) Not exceeding the area where bedrock is exposed and the type of rock
In cases where the types and stone qualities, etc. are recognized as identical, a permit for soil and stone extraction (limited to stone materials
Drilling exploration for the economic feasibility assessment of quarrying may be omitted.
(4) Previously, the results of the quarrying economic feasibility assessment were submitted to obtain a permit for the extraction of earth and stone (limited to stone materials
Designating a quarrying complex (including changes to the designation) including the area that received the
In such cases, the results of the drilling exploration for the relevant quarrying economic feasibility assessment may be utilized.
. Methods and contents of reserve and stone quality analysis
(1) Analysis Method
Regarding architectural stone or craft stone, pursuant to Article 12 of the Industrial Standardization Act
Calculation Standards for Stone Resource Reserves of the Korean Industrial Standard (KS E 2003), Stone for Crushed Aggregate
, the limestone of the Korean Industrial Standard pursuant to Article 12 of the Industrial Standardization Act
Calculation standards for length (KS E 2801) shall apply.
(2) Analysis Content
(A) Engineering Properties of Rocks
(Na) Recoverable Reserves
D. Methods and Contents of Economic Analysis and Evaluation
(1) Analysis and Evaluation Method
It is based on methods such as benefit/cost analysis or internal rate of return (IRR) analysis.
(2) Analysis·Evaluation Content
(A) Analysis of Production Costs and Production Costs
(B) Economic Analysis
(C) Economic Evaluation
2. Criteria for Economic Evaluation of Quarrying
A. Engineering Property Standards of Rocks
(1) For construction or crafts
┏━━━━━━━━━━━━━┯━━━━━━━━━┯━━━━━━━━━━━━━━┓
┃Specific Gravity │absorption rate │Compressive Strength ┃
┠─────────────┼─────────┼──────────────┨
┃2 or more │5% or less │500kg/㎠ or more ┃
┗━━━━━━━━━━━━━┷━━━━━━━━━┷━━━━━━━━━━━━━━┛
(2) For clavicular bone
┏━━━━━┯━━━━━━┯━━━━━━━━━┯━━━━━━━━━━━━━━━┓
┃specific gravity │absorption rate │Wear Rate │Sodium sulfate test ┃
┃ │ │ │Loss Weight Ratio (Stability) ┃
┠─────┼──────┼─────────┼───────────────┨
┃2.45 or higher │3% or less │40% or less │12% or less ┃
┗━━━━━┷━━━━━━┷━━━━━━━━━┷━━━━━━━━━━━━━━━┛
B. Based on recoverable reserves
(1) Construction stone: 84,000 cubic meters or more
(2) Stone for crafts: 7,400 cubic meters or more (in the case of black stone, 200 cubic meters or less
Award)
(3) Stone for crushed aggregate: 320,000 cubic meters or more
. Economic Analysis and Evaluation Criteria
(1) Benefit/Cost Ratio : 1 or more
(2) Internal Rate of Return (IRR): Social Discount Rate or higher
3. Contents of the Quarrying Economic Feasibility Assessment Report
A. Project Overview (including development methods such as quarrying methods)
B. Field Survey
(1) Topographic Survey
(2) Geological Survey
. Stone quality and reserves
(1) Engineering properties of rocks
(2) Recoverable reserves
(3) Other related materials (reserves and production areas, borehole location/direction and borehole cross-section
line, including the reference plane for excavation and extraction of stone)
d. Economic Analysis
(1) Production Cost and Production Cost Analysis
(2) Economic Analysis
(3) Economic Evaluation Results
E. Other matters relevant to the economic feasibility of quarrying
Remarks
1. In cases where an economic analysis is conducted pursuant to Subparagraph 1(d), Subparagraph 2(c), and Subparagraph 3(d), that
The analysis period shall be the sampling period pursuant to Article 25, Paragraph 3 of the Act.
2. Definition of Terms
a. "Architectural stone" refers to interior or exterior building materials, stair or road facility materials, etc.
refers to the stone material being constructed.
a. "Craft stone" refers to stone that is processed into carvings, gravestones, orchid stones, etc.
.
"Stone for crushed aggregate" refers to stone processed into gravel or aggregate.