■ Enforcement Decree of the Environmental Impact Assessment Act [Appendix 4] <Amended Oct. 1, 2025>
Types, Scope, and Timing of Consultation Requests for Projects Subject to Small-Scale Environmental Impact Assessment (Articles 59 and 61, Paragraph 2
related)
┌───────┬───────────────────────────┬──────────┐
│Category │Types and Scale of Projects Subject to Small-Scale Environmental Impact Assessment │Request for Consultation Timing │
├───────┼───────────────────────────┼──────────┤
│ │ │ │
│ │ │ │
│1. 「National Territory's │a. Article 6, Paragraph 1 of the "Act on Planning and Utilization of National Land" │Business Permit/Authorization │
│Plan and this │, the project plan area is 60,000 │·Approval·License·Decision │
│Regarding for START │square meters (10,000 square meters in the case of green areas) or more │or designation, etc. (hereinafter │
│Law」 Approx. │Any of the following businesses │In this table "Approval, etc." │
│For Region │ Article 12 of the Act on the Installation and Use of Sports Facilities │) former │
│ │Sports facilities implemented in accordance with the business plan under the START clause │ │
│ │'s Installation Project │ │
│ │ 2) Aggregate extraction pursuant to Article 21-2 of the "Aggregate Extraction Act" │ │
│ │Project to extract aggregates from the planned site │ │
│ │ 3) pursuant to Article 19, Paragraph 2, Subparagraph 1 of the “Fishing Village and Fishing Port Act” │ │
│ │Development project implemented in accordance with the Basic Plan for Fishing Port Facilities │ │
│ │ Article 2 of the "Act on Planning and Utilization of National Land" │ │
│ │Installation, maintenance, or improvement of infrastructure pursuant to Subparagraph D of Item 4 │ │
│ │Projects implemented in accordance with the plan regarding START │ │
│ │ Article 2 of the "Act on Planning and Utilization of National Land" │ │
│ │Project implemented in accordance with District Unit Plan No. 5 │ │
│ │ │ │
│ │b. Article 6, subparagraph 2 of the "Act on Planning and Utilization of National Land" │Prior to approval of business, etc. │
│ │, the project plan area is the following area │ │
│ │Things that are more than │ │
│ │ Conservation Management Area: 5,000 square meters │ │
│ │ 2) Production Management Area: 7,500 square meters │ │
│ │ Planned Management Area: 10,000 square meters │ │
│ │ │ │
│ │. Article 6, Subparagraph 3 of the "Act on Planning and Utilization of National Land" │Prior to approval of the project, etc. │
│ │, if the project plan area is less than 7,500 square meters │ │
│ │or more than │ │
│ │ │ │
│ │ra. Article 6, subparagraph 4 of the "Act on Planning and Utilization of National Land" │Prior to approval of the project, etc. │
│ │, if the project plan area is 5,000 │ │
│ │Those larger than square meters │ │
│ │ │ │
│ │ │ │
├───────┼───────────────────────────┼──────────┤
│ │ │ │
│ │ │ │
│2. 「Development Restriction │Special Measures Concerning the Designation and Management of Development Restriction Zones │Prior to approval of the project, etc. │
│Designation of zone │In the case of a development restriction zone pursuant to Article 3 of the Act, the business plan │ │
│and management │Those with an area of 5,000 square meters or more │ │
│Special Act concerning START │ │ │
│Treatment Method」 Application │ │ │
│Region │ │ │
│ │ │ │
│ │ │ │
├───────┼───────────────────────────┼──────────┤
│ │ │ │
│ │ │ │
│3. 「Jayeonhwan │a. Pursuant to Article 2, subparagraph 12 and Article 12 of the "Natural Environment Conservation Act" │Prior to approval of business, etc. │
│Alarm Warfare」 │Ecological and Landscape Conservation Area (City/Province pursuant to Article 23 of the same Act) │ │
│및 「Wild │In the case of (including ecological and landscape conservation areas), the project plan surface │ │
│Biological Protection │The area is greater than or equal to the following │ │
│and management │ 1) Core Ecological and Landscape Conservation Area: 5,000 square meters │ │
│Law concerning │ 2) Ecological and Landscape Buffer Conservation Zone: 7,500 square meters │ │
│Rate」 Application │ Ecological and Landscape Transition Conservation Area: 10,000 square meters │ │
│Region │ │ │
│ │ │ │
│ │b. pursuant to Article 2, subparagraph 13 and Article 22 of the "Natural Environment Conservation Act" │Prior to approval of the project, etc. │
│ │In the case of nature reserve areas, the project plan area is 5,000 square meters │ │
│ │Things that are more than │ │
│ │ │ │
│ │. In accordance with Article 27 of the "Act on the Protection and Management of Wildlife" │Prior to approval of the project, etc. │
│ │Special protected areas for wildlife and pursuant to Article 33 of the same Act │ │
│ │In the case of wildlife protection areas, the project plan area is 5,000 │ │
│ │Things larger than square meters │ │
│ │ │ │
│ │ │ │
├───────┼───────────────────────────┼──────────┤
│4. 「Mountain Area Management │a. Public interest pursuant to Article 4, Paragraph 1, Subparagraph 1, Item b of the Mountain Area Management Act │Prior to approval of the project, etc. │
│Application of the START method │In the case of the Yongsan site, the project plan area is 10,000 square meters or more │ │
│Region │thing_in_ │ │
│ │ │ │
│ │b. Public interest pursuant to Article 4, Paragraph 1, Subparagraph 1, Item b of the Mountain Area Management Act │Prior to approval of the project, etc. │
│ │In the case of mountainous areas other than Yongsan-ji, the project plan area is 30,000 │ │
│ │Those larger than square meters │ │
│ │ │ │
│ │ │ │
├───────┼───────────────────────────┼──────────┤
│5. 「Nature Park │a. Park nature pursuant to Article 18, Paragraph 1, Subparagraph 1 of the "Natural Parks Act" │Prior to approval of business, etc. │
│Application of the START method │In the case of conservation zones, if the project plan area is 5,000 square meters or less │ │
│Region │thing that is a prize │ │
│ │ │ │
│ │b. Article 18, Paragraph 1, Subparagraphs 2 and 3 of the Natural Parks Act or │Prior to approval of the project, etc. │
│ │Park natural environment district, park village district, or under Subparagraph 6 │ │
│ │In the case of the Park Cultural Heritage District, the project plan area is 7,500 │ │
│ │Things larger than square meters │ │
│ │ │ │
│ │ │ │
├───────┼───────────────────────────┼──────────┤
│ │ │ │
│ │ │ │
│6. 「Wetland Conservation │a. of wetland protection areas pursuant to Article 8, Paragraph 1 of the "Wetland Conservation Act" │Prior to approval of the project, etc. │
│Application of the START method │In the case where the project plan area is 5,000 square meters or more │ │
│Region │ │ │
│ │or wetland surrounding management areas pursuant to Article 8, Paragraph 1 of the "Wetlands Conservation Act" │Prior to approval of the project, etc. │
│ │, the project plan area is 7,500 square meters or more │ │
│ │ │ │
│ │. Of the wetland improvement area pursuant to Article 8, Paragraph 2 of the "Wetland Conservation Act" │Prior to approval of the project, etc. │
│ │In the case where the project plan area is 7,500 square meters or more │ │
│ │ │ │
│ │ │ │
├───────┼───────────────────────────┼──────────┤
│ │ │ │
│ │ │ │
│7. 「Capital │a. A wide-area water supply system installed pursuant to Article 3, Subparagraph 7 of the Water Supply Act │Prior to approval of the project, etc. │
│method”, 「Ha │The boundary surface of the lake (based on the planned flood level) │ │
│Cheonbeop”, │(of the upstream of Paldang Dam │ │
│「Small Stream Maintenance │In the case of the South Han River and the North Han River, Article 38 of the Framework Act on Environment Policy │ │
│method” and “ji │As Zone I of the Special Measures Area designated pursuant to Article 1, the "Han River │ │
│Sewerage Method」 Red │Act on Water Quality Improvement of Water Sources in Water Systems and Support for Residents, etc. │ │
│For Region │Subject to designation as a waterfront area pursuant to Article 4, Paragraph 1, Subparagraph 1 │ │
│ │), the business plan │ │
│ │The planned area is 7,500 square meters (Article 2, Subparagraph 3 of the Housing Act │ │
│ │, those of 5,000 square meters or more │ │
│ │ │ │
│ │b. In the case of a river area pursuant to Article 2, Subparagraph 2 of the River Act, │Prior to approval of the project, etc. │
│ │Those with a planned business area of 10,000 square meters or more │ │
│ │ │ │
│ │ │ │
│ │ │ │
│ │. Of the small stream area pursuant to Article 2, Subparagraph 2 of the "Small Stream Improvement Act" │Prior to approval of the project, etc. │
│ │In the case where the project plan area is 7,500 square meters or more │ │
│ │ │ │
│ │. Pursuant to Article 8, Paragraph 1 of the “Small Stream Improvement Act,” the managing authority │「Small Stream Improvement Act」 │
│ │Establish a small stream maintenance implementation plan and small stream maintenance project │pursuant to Article 8, paragraph 3, │
│ │, the project plan area is less than 7,500 square meters │The management agency is local environment │
│ │or more than │In consultation with the head of the office │
│ │ │is when │
│ │ │ │
│ │E. Of groundwater conservation zones pursuant to Article 2, Subparagraph 3 of the Groundwater Act │Prior to approval of the project, etc. │
│ │In the case where the project plan area is 5,000 square meters or more │ │
│ │ │ │
│ │ │ │
├───────┼───────────────────────────┼──────────┤
│8. 「Choji │Application for Permission to Establish Pastureland Pursuant to Article 5, Paragraph 1 of the Pastureland Act │Prior to approval of the project, etc. │
│Application of the "Law" │, the project plan area is 30,000 square meters or more │ │
│STATION │ │ │
│ │ │ │
│ │ │ │
├───────┼───────────────────────────┼──────────┤
│ │ │ │
│ │ │ │
│9. Other items │ The area of the business plan pursuant to the provisions of Nos. 1 through 8 │Prior to approval of the project, etc. │
│StartBusiness │At least 60 percent of the minimum area subject to small-scale environmental impact assessment │ │
│ │Among development projects, regional disparities due to environmental pollution, damage to the natural environment, etc. │ │
│ │As a project where there is a risk of destruction of power generation and the living environment, the city │ │
│ │Projects determined by ordinances of provinces, cities, counties, or districts, and related administrative matters │ │
│ │The head of the agency in advance [regarding] the City/Province or City/County/District Environmental Policy Committee │ │
│ │Based on the opinion of the committee, it is necessary to conduct a small-scale environmental impact assessment │ │
│ │Approved business │ │
│ │ │ │
│ │ │ │
└───────┴───────────────────────────┴──────────┘
Remarks
1. Delete <2014.11.11.>
2. If the subjects of small-scale environmental impact assessment according to the table above overlap, they shall not be reviewed redundantly.
and a single development project among Nos. 1 through 3 and Nos. 5 through 8 of the above table
If applicable in duplicate, Item 1 shall not apply, and Items 2, 3, and 5 onwards
Among No. 8, the scale with the smaller target project area shall be applied.
3. Projects falling under any of the following subparagraphs are subject to a small-scale environmental impact assessment
It shall be deemed a START business. In this case, the consultation period shall be the main business to be deemed or the small-scale environmental impact assessment.
It shall be prior to obtaining approval, etc. for the target project.
a. A business deemed to have received approval, etc. under other laws, as specified in the table above
Projects subject to environmental impact assessment on scale
a. Projects for which other laws stipulate that a small-scale environmental impact assessment be conducted pursuant to this Act
4. Notwithstanding the table above, a project falling under any of the following items is subject to a small-scale environmental impact assessment
excludes this from the target.
a. Among the forestry projects under Article 2, Subparagraph 3 of the "Act on the Creation and Management of Forest Resources," the city of the same Act
Article 2, Paragraph 2, Subparagraphs 1, 1-2, 1-3, 2, and 4 through 6 of the Enforcement Decree
Business in accordance with the START regulations
b. Erosion control projects pursuant to Article 2, Subparagraph 2 of the Erosion Control Act
. Projects for the improvement and conservation of soil pursuant to Article 21 of the "Agricultural Land Act" and Article 2 of the "Agricultural Land Act"
Project for farmland improvement pursuant to Subparagraph 6-2
d. Agricultural production infrastructure improvement project pursuant to Article 2, Subparagraph 5, Item b of the "Rural Development Act" [in water
is excluded]
e. On a road pursuant to Article 10 of the Road Act or Article 4 of the Rural Road Improvement Act, the following
A project to install a facility corresponding to one of the following
1) Common utility tunnel pursuant to Article 2, Subparagraph 9 of the Act on Planning and Utilization of National Land
Facilities pursuant to the latter part of Article 62, Paragraph 2 of the "Road Act" and Article 61, Paragraph 2 of the "Enforcement Decree of the Road Act"
Facilities according to the START clause
Wastewater treatment pursuant to Article 2, Subparagraph 7 of the "Act on the Promotion and Support of Water Reuse"
Water reuse facilities (applicable only to supply pipelines) or thermal wastewater reuse pursuant to Subparagraph 7-2 of the same Article
Facilities for START (applicable only to supply pipelines)
4) Sewer pipes pursuant to Article 2, Subparagraph 6 of the "Sewerage Act" or private
Sewage Treatment Facility (Pipelines Only)
B. A business for extracting land aggregates pursuant to Article 2, Paragraph 1, Subparagraph 6 of the Enforcement Decree of the Aggregate Extraction Act
Co. Pursuant to Article 3, Subparagraph 6 of the "Regulations on Standards for Bearing Costs, etc. for Natural Disaster Relief and Recovery"
T Tomb Restoration Project
A. Planned management pursuant to Article 36, Paragraph 1, Subparagraph 2, Item C of the "Act on Planning and Utilization of National Land"
Region[Pursuant to Item 18 of Annex 1 of the Enforcement Decree of the Act on the Establishment and Management of Spatial Information, etc.
[Applicable only to cases classified as bare land on the land cover map] where the project plan area is 3
Any of the following businesses with an area of less than 10,000 square meters
1) Warehouse Installation Project, Including Outdoor Storage Areas, Storage Areas, etc.
2) Installation project for sports facilities such as playgrounds and gymnasiums
3) Parking Facility Installation Project
4) Solar power generation facility installation project (on idle land created by the implementation of other projects, simply
Applicable only where possible through the installation of workpieces)
. In a waterfront area designated pursuant to Article 44, Paragraph 1 of the River Act, pursuant to Article 33 of the same Act
A project being implemented that does not include the following facilities. However, the "Aggregate Extraction Act"
Excluding aggregate extraction pursuant to Article 22 and river construction pursuant to Article 2, subparagraph 5 of the River Act
.
Air pollutant emission facilities pursuant to Article 2, Subparagraph 11 of the Air Environment Preservation Act
Wastewater discharge facility pursuant to Article 2, Item 10 of the Water Environment Preservation Act
Noise and vibration emission facilities pursuant to Article 2, Subparagraph 3 of the "Noise and Vibration Control Act"
Facilities subject to soil contamination management pursuant to Article 2, Subparagraph 3 of the Soil Environment Conservation Act
차. New afforestation pursuant to Article 2, Subparagraph 2 of the "Act on the Maintenance and Enhancement of Carbon Sinks," and the same Article
Reforestation pursuant to Subparagraph 3 and vegetation restoration project pursuant to Subparagraph 5 of the same Article
5. Among the regions in Item 1 of the above table, in agricultural and forestry areas and managed areas, Article 2, Item 4 of the “Rural Development Act”
, the scale subject to the small-scale environmental impact assessment is climate energy
The Minister of Environment may separately determine and announce it.
6. Regarding the designation of areas where factory construction is permitted pursuant to Subparagraph 2, Item (b) 1) of Annex 2, Strategic Environmental Impact
In cases where an assessment has been conducted, individual factories established in that area are excluded from the small-scale environmental impact assessment.
Except.
7. Among the regions under Item 1 (excluding Subparagraph (a)) of the above table, the "Act on the Management and Utilization of Livestock Manure"
The total area of livestock manure discharge facilities and treatment facilities pursuant to Article 2, subparagraphs 3 and 8 is 5,000
square meters, it is included in the scope of small-scale environmental impact assessment, and Item 1 of the above table
Of ground transmission lines among power development projects under Article 2, Subparagraph 2 of the Power Development Promotion Act in the region
In the case of installing access roads and ancillary facilities for construction work, the evaluation of the target project
The details must be included in the written document. In this case, within the already agreed-upon target area, the access road
Note 11 shall not apply in cases where the START and ancillary facilities are changed.
Item 4 of the above table refers to the permit for conversion of forest land pursuant to Article 14 of the Forest Management Act, and Article 15-2 of the same Act.
or a permit for the extraction of soil and rock pursuant to Article 25 of the same Act (hereinafter referred to in this subparagraph
It applies only to projects implemented after obtaining the "Forest Land Conversion Permit, etc.", and the developer
Within a business zone, by obtaining permits under other laws such as the "Building Act" along with forest land conversion permits, etc., the
In the case of projects being carried out, Item 4 of the above table shall not apply, and Items 1 through 3 of the above table
and Nos. 5 through 7 apply.
9. The development project [region/district/] in the 'Type/Scale' column of the 'Projects Subject to Small-Scale Environmental Impact Assessment' in the table above
Spanning two or more land use zones among the classifications of areas such as districts and zones (hereinafter referred to as "land use zones")
exists, if the sum of the values calculated according to the following formula is 1 or greater, the small
Included in the scope of environmental impact assessment.
Of the relevant land use zone + Business plan for the relevant land use zone + …………
Business Plan Area Area …
──────────────── ───────────────
Minimum small-scale of the relevant zoning area Minimum of the relevant land use zone
Environmental Impact Assessment Target Area Small-scale Environmental Impact Assessment
TargetArea
10. The establishment of an arboretum pursuant to Article 2, Subparagraph 1 of the "Act on the Establishment and Promotion of Arboretums and Gardens" also
is a natural recreation forest pursuant to Article 2, Subparagraph 2 of the "Act on Forest Culture and Recreation," and to Subparagraph 3 of the same article
, healing forests pursuant to Subparagraph 5 of the same Article, forest campsites pursuant to Subparagraph 8 of the same Article,
Forest leisure sports facilities pursuant to Subparagraph 9 of the same Article or forest management experience forests pursuant to Subparagraph 10 of the same Article
In the case of small-scale projects, the area subject to small-scale environmental impact assessment includes land alteration, extraction of soil, stones, etc.
It is based on the area that is actually developed, such as the installation of buildings.
11. Areas where a business operator has received approval, etc. as being subject to a small-scale environmental impact assessment within 10 years
In an area within a straight-line distance of 50 meters from the boundary, falling under any of the following items
In the case where the applicant intends to obtain additional approval, etc., the area for which approval, etc. has already been received (multiple additional
In the event of approval or change, etc., it corresponds to the minimum area subject to small-scale environmental impact assessment
) and the sum of the area for which additional approval, etc. is sought is the minimum small-scale environment
The area subject to impact assessment is greater than or equal to the area for which additional approval, etc. is sought is at least a small-scale environmental area
If it is 30 percent or more of the area subject to impact assessment (due to multiple additional approvals or changes, the
(Including cases where the area subject to small-scale environmental impact assessment increases by 30 percent or more) this
is included in the scope of small-scale environmental impact assessment. However, national rivers pursuant to Article 7 of the River Act
Streams and local rivers, traffic congestion roads in metropolitan areas pursuant to Article 8 of the "Road Act," "National Land Planning
General roads pursuant to Article 2, Paragraph 2, Subparagraph 1, Items (a) and (b) of the Enforcement Decree of the Act on the Use and Management of Roads and Roads
A road with two or more lanes in each direction as an exclusive motorway or "Construction of railways and maintenance of railway facilities
Cases where each region is separated by a railway pursuant to Article 2, Subparagraph 1 of the "Act on the Management of Railways" are excluded.
a. The business operator and the same person pursuant to Article 2, Paragraph 1, Item 8 of the "Banking Act" (the Mayor, County Governor, or District Head [ ]
In the case of a business operator, in the area where approval, etc. has already been received and in the area where additional approval, etc. is sought
(Excluding cases where the main purposes of the implemented projects are different)
b. Parcels for which the business operator has obtained approval, etc. (Article 2 of the "Act on the Establishment and Management of Spatial Information, etc."
. The same applies hereinafter) and the same project (사
refers to cases where the main purpose of the business is the same. (The same applies hereinafter in this table) to obtain approval, etc.
is
. Pursuant to Article 2, Item 31 of the "Act on the Establishment and Management of Spatial Information, etc.," the parcel is divided
A person who intends to obtain approval, etc. for the same project on a subdivided parcel within 3 years after
11-2. In areas within a straight-line distance of 50 meters from the boundary of the area where the business operator has applied for approval, etc.
Before the relevant business operator obtains such approval, etc., any person falling under any of the following subparagraphs
In the case of applying for approval, etc., the area for which approval, etc. has already been applied and the additional area for which approval, etc. has been applied
If the sum of the areas is greater than or equal to the minimum area subject to a small-scale environmental impact assessment, this is considered a small-scale environmental
It is included in the scope of impact assessment. However, national rivers and local rivers pursuant to Article 7 of the River Act,
Traffic congestion roads in metropolitan areas pursuant to Article 8 of the "Road Act," "National Land Planning and Utilization Act
General roads and motorway-only roads pursuant to Article 2, Paragraph 2, Subparagraph 1, Items (a) and (b) of the Enforcement Decree of the Act
As a road with two or more lanes in each direction or the "Act on the Construction of Railways and Maintenance of Railway Facilities"
Cases where each region is separated by a railway pursuant to Article 2, Subparagraph 1 of the [Rate] are excluded.
a. The same person pursuant to Article 2, Paragraph 1, Subparagraph 8 of the "Banking Act" (in cases where the Mayor, County Governor, or District Head is the business operator
As a result, to be implemented in regions where approval, etc. has already been applied for and in regions where additional approval, etc. is sought
excludes cases where the primary purposes of the business are different)
b. Parcels for which the business operator has applied for approval, etc. (Article of the "Act on the Establishment and Management of Spatial Information"
Refers to the parcel under Subparagraph 21 of Article 2. The same applies hereinafter) and the same project on the same parcel
Person seeking approval, etc.
. Pursuant to Article 2, Item 31 of the "Act on the Establishment and Management of Spatial Information, etc.," the parcel is divided
A person who intends to obtain approval, etc. for the same project on a subdivided parcel within 3 years after
12. Among the types and scales of development projects, the scale of the project, in the consultation request timing column, for the purpose of obtaining approval, etc.
refers to the scale of the business.