Annex 3 — 환경영향평가법 시행령
279237 · 2025-10-23
■ Enforcement Decree of the Environmental Impact Assessment Act [Table 3] <Amended Sep. 23, 2025>
Specific types, scope, and timing of consultation requests for projects subject to environmental impact assessment
(Related to Article 31, Paragraph 2 and Article 47, Paragraph 2)
┌────────┬───────────────────┬─────────────────┐
│Classification │Types and Scope of Projects Subject to Environmental Impact Assessment │Consultation Request Period │
├────────┼───────────────────┼─────────────────┤
│1. The city's │a. Article 2, Paragraph 1 of the Urban Development Act │Article 17, Paragraph 2 of the "Urban Development Act" │
│ DevelopmentProject │or 「Min │or │
│ │Article 22 of the Special Act on Inter-household Rental Housing │「Special Act on Private Rental Housing」 │
│ │Publicly supported private rental housing pursuant to the START clause │Public support private entity pursuant to Article 28 │
│ │Project area within the Supply Promotion District Development Project │Approval of Large Housing Supply Promotion District Plan │
│ │Projects with an area of 250,000 square meters or more │Previous │
│ │ │ │
│ │B. Article 2 of the "Urban and Residential Environment Improvement Act" │a) Games implemented by local governments │
│ │Maintenance project pursuant to Article 2 (residential exchange │Right: 「Urban and Residential Environment Improvement │
│ │(Excluding urban improvement projects) among the project aspects │pursuant to Article 50, Paragraph 9 of the "Act" │
│ │Projects with an area of 300,000 square meters or more │Prior to the public notice of approval of the business implementation plan │
│ │ │b) Implementation by a person other than a local government │
│ │ │: 「Urban and residential environment │
│ │ │Pursuant to Article 50, Paragraph 1 of the Maintenance Act │
│ │ │BeforeApprovalOfProjectImplementationPlan │
│ │ │ │
│ │. "Regarding the Planning and Use of National Land │「Regarding the Planning and Use of National Land │
│ │The province pursuant to Article 2, Item 10 of the "Act" │Substance pursuant to Article 88, Paragraph 2 of the Act │
│ │Among city/county planning facility projects, the following │Before approval of the city plan │
│ │regarding a facility corresponding to one of │ │
│ │Business │ │
│ │ │ │
│ │ 1) Canal │ │
│ │ │ │
│ │ 2) As a distribution business facility, the business area │ │
│ │Those with 200,000 square meters or more │ │
│ │ │ │
│ │ 3) As a parking facility, the project area is │ │
│ │Those with more than 200,000 square meters │ │
│ │ │ │
│ │ As a market, the business area is │ │
│ │Those with 150,000 square meters or more │ │
│ │ │ │
│ │d. Housing pursuant to Article 15 of the Housing Act │Business pursuant to Article 15 of the Housing Act │
│ │Among construction projects or land development projects, │Before plan approval │
│ │Businesses with a business area of 300,000 square meters or more │ │
│ │ │ │
│ │E. Article 7, Paragraph 1 of the "Residential Land Development Promotion Act" │Article 9, Paragraph 1 of the "Residential Land Development Promotion Act" │
│ │or "Public │Implementation plan for residential land development project pursuant to START │
│ │Article 2, Subparagraph 3, Item (a) of the "Special Act on Housing" │or "Public Housing Special │
│ │, │Public housing pursuant to Article 17 of the "Special Act" │
│ │Companies with a business area of 300,000 square meters or more │Before District Plan Approval │
│ │UP │ │
│ │ │ │
│ │B. Article 2, Paragraph 16 of the Distribution Industry Development Act │Article 29, Paragraph 1 of the Distribution Industry Development Act │
│ │Joint Delivery Center Establishment Project in accordance with START │clause │
│ │Among them, if the project area is 200,000 square meters or more │jeongjeon │
│ │business │ │
│ │ │ │
│ │Company. Article 2 of the "Passenger Motor Vehicle Transportation Business Act" │「Passenger Motor Vehicle Transportation Business Act」 No. │
│ │Passenger automobile terminal pursuant to Article 5 │Of the execution of construction pursuant to Article 38, Paragraph 1 │
│ │Installation work in progress, project area 200,000 square meters │? Before │
│ │meters or more │ │
│ │ │ │
│ │A. "Regarding the development and operation of logistics facilities │Regarding the development and operation of logistics facilities │
│ │Article 2, subparagraph 2 or 9 of the "Act on which..." │Article 9, Paragraph 1 of the "Act on..." or │
│ │or │Authorization or approval pursuant to Article 28, Paragraph 1 │
│ │The project area among the logistics complex development projects is │before │
│ │Projects exceeding 200,000 square meters │ │
│ │ │ │
│ │. School pursuant to Article 9 of the "Framework Act on Education" │a) The State or a local government school │
│ │During the bridge installation work, the project area is 30 │When implementing a facility project: │
│ │Projects exceeding 10,000 square meters │"School Facilities Project Promotion Act" Article 4 │
│ │ │of the implementation plan pursuant to Paragraph 4 │
│ │ │Before consultation │
│ │ │b) Other than the State or local governments │
│ │ │'s implementation of self-funded school facility projects │
│ │ │: 「School facility project promotion │
│ │ │The time pursuant to Article 4, Paragraph 1 of the "base system" │
│ │ │Before approval of the flight plan │
│ │ │da) "Regarding the planning and use of national land │
│ │ │Act on establishing a school │
│ │ │In the case of installation: "National land planning │
│ │ │Act on the Use and Use of [Article 88] │
│ │ │of the implementation plan pursuant to Paragraph 2 │
│ │ │? Before │
│ │ │ │
│ │차. Article 2, Paragraph 9 of the "Sewerage Act" or │a) In cases where the Mayor or Provincial Governor establishes: │
│ │Public sewage treatment facilities pursuant to No. 13 │Article 11, Paragraph 2 of the "Sewerage Act" │
│ │or installation of private sewage treatment facilities │따른 고시 전 │
│ │Among companies with a processing capacity of 100,000 per day │b) The Mayor, County Governor, or District Head shall install │
│ │Businesses exceeding square meters │: Article │
│ │ │pursuant to Article 11, Paragraph 3 or 4 │
│ │ │The authorization before │
│ │ │da) Not the head of a local government │
│ │ │Self-installing public sewer system │
│ │ │: Article 16 of the "Sewerage Act" │
│ │ │Before authorization pursuant to Paragraph 1 │
│ │ │d) Install a private sewage treatment facility │
│ │ │is the case: Article 34 of the "Sewerage Act" │
│ │ │Before reporting pursuant to Paragraph 2 │
│ │ │ │
│ │카. Article 2, subparagraph 10 of the "Rural Development Act" │Article 59, Paragraph 2 of the "Rural Development Act" │
│ │Among the living environment improvement projects pursuant to the same Act │and the mayor, county head, or district pursuant to Paragraph 3 │
│ │of a village improvement zone pursuant to Article 101 │Prior to the approval of the Commissioner or the Mayor/Provincial Governor │
│ │The development project area is 200,000 square meters │ │
│ │Merchant Business │ │
│ │ │ │
│ │ta. 「Regarding the Creation and Development of Innovation Cities │「Regarding the Creation and Development of Innovation Cities │
│ │Innovation pursuant to Article 2, Subparagraph 5 of the "Special Act" │pursuant to Article 12, Paragraph 1 of the "Special Act" │
│ │Among urban development projects, the project area is 250,000 │Before approval of implementation plan │
│ │square meters │ │
│ │ │ │
│ │Part. "Regarding the Development and Utilization of Station Areas │「Regarding the Development and Utilization of Station Areas │
│ │Station area pursuant to Article 2, Subparagraph 2 of the Act │pursuant to Article 13, Paragraph 1 of the "Act" │
│ │Among the development projects, the project area is 250,000 square meters │Before approval of implementation plan │
│ │meters │ │
│ │ │ │
│ │ │ │
├────────┼───────────────────┼─────────────────┤
│2. Industrial Entry │a. "Industrial Location and Development Act │「Industrial Location and Development Act」 │
│and │Industrial complex pursuant to Article 2, Item 9 of the [] rate │Articles 17, 18, 18-2, and 19 │
│Industry Unit │development project or subparagraph 11 of the same article │or implementation system pursuant to Article 39-7 │
│The Jo of Ji │, the project area │Prior to approval of the plan │
│SexBusiness │Projects with an area of 150,000 square meters or more │ │
│ │ │ │
│ │B. "Act on Promotion of Small and Medium Enterprises" │「Act on Promotion of Small and Medium Enterprises」 │
│ │Complex development project pursuant to Article 31, Paragraph 1 │of the implementation plan pursuant to Article 31, Paragraph 1 │
│ │Among them, if the project area is 150,000 square meters or more │Before Approval │
│ │business │ │
│ │ │ │
│ │. "To the designation and operation of free trade zones │「Designation and Operation of Free Trade Zones │
│ │" │Article 4, Paragraph 1 of the "Act on START" │
│ │As a case of designating a free trade zone │따른 자유무역지역의 지정 전 │
│ │with a project area of 150,000 square meters or more │ │
│ │project. However, environmental impact assessment consultation │ │
│ │industrial complex, airport and its hinterland, │ │
│ │distribution complexes, cargo terminals, ports and their │ │
│ │Designating a free trade zone in the hinterland │ │
│ │is excluded. │ │
│ │ │ │
│ │ra. 「Activation of Industrial Agglomeration and Factory Establishment │「Activation of industrial clusters and factory establishment │
│ │Pursuant to Article 2, Subparagraph 1 of the "Act on START" │Pursuant to Article 13, Paragraph 1 of the "Act concerning..." │
│ │As a case of establishing a different factory, business │prior to the approval of the establishment of another factory or the same │
│ │Companies with an area of 150,000 square meters or more │is the establishment of a factory pursuant to Article 2 │
│ │Up. However, from item (a) to item (c), item (e) │Approval deemed to have been approved │
│ │or environmental impact pursuant to subparagraph 13(g) │Before completion of move-in contract, etc. │
│ │As it falls under the category of projects subject to evaluation, environmental... │ │
│ │Factory site for which prospective evaluation consultation has been conducted or │ │
│ │Industrial Land(「Activation of Industrial Agglomeration and Public │ │
│ │Article 33, Paragraph 7 of the "Act on the Establishment of Markets" │ │
│ │Referring to industrial land pursuant to subparagraph 3 of the │ │
│ │. The same applies to the factory │ │
│ │Cases where START is established are excluded. │ │
│ │ │ │
│ │E. Article 2, Paragraph 1, Subparagraph 2 of the Urban Development Act │Article 17, Paragraph 2 of the "Urban Development Act" │
│ │에 따른 도시개발사업 중 공업용지 │따른 실시계획 인가 전 │
│ │The project area of the development project is 150,000 square meters │ │
│ │meters │ │
│ │ │ │
│ │B. "Special provisions regarding support for industrial technology complexes │「Special provisions regarding support for industrial technology complexes │
│ │Industrial equipment pursuant to Article 2, Subparagraph 1 of the "Example Act" │Project implementer pursuant to Article 4 of the [Example Act] │
│ │The project area among the development projects of the arts complex is │, the industrial technology complex │
│ │Projects of 150,000 square meters or more. However, │Complete the design for construction │
│ │Industrial Technology Complex under Article 6 of the same Act │Before │
│ │, regarding "Industrial Site and Development │ │
│ │Article 6, Article 7, or Article 7 of the Act │ │
│ │National industrial complex pursuant to 2 of START, general industrial complex │ │
│ │To a startup complex or urban high-tech industrial complex │ │
│ │Develop or 「Regional Development and Support │ │
│ │Regional development projects pursuant to the "Act on Regional Development Projects" │ │
│ │Zone (Law No. 12737 Area Development │ │
│ │Article 4 of the Addenda to the Act on START and Support │ │
│ │Pursuant to Paragraph 3, the regional development project area │ │
│ │" viewed through │ │
│ │Act on the Promotion of Local Small and Medium Enterprises」 │ │
│ │에 따라 지정·고시된 지역종합개 │ │
│ │(Applies only to the development zone) developing │ │
│ │is excluded. │ │
│ │ │ │
│ │Company. "Regarding the Promotion of Research and Development Special Zones │「Regarding the Promotion of Research and Development Special Zones │
│ │Research pursuant to Article 2, Subparagraph 1 of the "Special Act" │Pursuant to Article 27, Paragraph 1 of the "Special Act" │
│ │Project area among the development special zone creation projects │Before approval of implementation plan │
│ │Projects exceeding 150,000 square meters │ │
│ │ │ │
│ │A. "Management and Revitalization of Urban Industrial Areas │1) Events implemented by the Mayor, County Governor, etc. │
│ │Article 2, Paragraph 1 of the "Special Act on the Concerning the Establishment of..." │Right: "Management of urban industrial areas │
│ │No. 7 │Special Act on the Promotion and Activation of [the Act] Article │
│ │with a project area of 150,000 square meters or more │Notice of implementation plan pursuant to Article 31 │
│ │Business │Before │
│ │ │2) Implementation by persons other than mayors, county governors, etc. │
│ │ │: "Of urban industrial areas │
│ │ │Special on Management and Activation │
│ │ │Act pursuant to Article 30, Paragraph 2 │
│ │ │Before approval of the city plan │
│ │ │ │
│ │ │ │
├────────┼───────────────────┼─────────────────┤
│3. Energy │a. Article 2 of the "Submarine Mineral Resources Development Act" │"Submarine Mineral Resources Development Act" No. 15 │
│ DevelopmentProject │Subsea mining development project pursuant to No. 2 │establishment of extraction rights pursuant to Paragraph 1 │
│ │Among companies aimed at energy development │Before Approval │
│ │UP │ │
│ │ │ │
│ │b. pursuant to Article 3, subparagraph 2 of the “Mining Act” │pursuant to Article 42, Paragraph 1 of the "Mining Act" │
│ │For the purpose of energy development during mining │Before authorization of mining plan │
│ │is a mining business with a mining area of 300,000 │ │
│ │Businesses exceeding square meters │ │
│ │ │ │
│ │Article 2, Paragraph 2 of the "Power Generation Development Promotion Act" │Article 5, Paragraph 1 of the "Power Generation Promotion Act" │
│ │, the following │Prior to approval of the implementation plan pursuant to START │
│ │Regarding facilities corresponding to any one of the │ │
│ │Business │ │
│ │ │ │
│ │ 1) The power generation capacity is 10,000 kilowatts │ │
│ │. However, dams and reservoirs │ │
│ │The construction of a power plant involving site │ │
│ │Above, the power generation facility capacity is 3,000 kilowatts │ │
│ │That is watt or more, solar/wind power, annual │ │
│ │Fuel cell power plant or electric power generation business │ │
│ │In the case of a storage device, power generation facility │ │
│ │with a capacity of 100,000 kilowatts or more, │ │
│ │Oceans utilizing power plant cooling water │ │
│ │In the case of hydroelectric power plants, power generation facilities │ │
│ │Those with a capacity of 30,000 kilowatts or more │ │
│ │ │ │
│ │ 2)Ground transmission of 345 kilovolts or more │ │
│ │As a line, line length (in the implementation plan │ │
│ │If an underground section is included, that road │ │
│ │(including this) is 10 kilometers this │ │
│ │thing that is a prize │ │
│ │ │ │
│ │ Outdoor substations of 765 kilovolts or higher │ │
│ │small │ │
│ │ │ │
│ │ 4)Development area of 300,000 square meters or more │ │
│ │Personal Ash Treatment Plant │ │
│ │ │ │
│ │ 5) with a development area of 50,000 square meters or more │ │
│ │Coal storage │ │
│ │ │ │
│ │ra. Article 2, subparagraph 16 of the Electric Power Business Act │Article 61 of the Electric Power Business Act or the former │
│ │any of the following │Public pursuant to Article 8 of the "Facility Safety Management Act" │
│ │(Ma │Before the approval or notification of the plan │
│ │Businesses corresponding to the START item are excluded) │ │
│ │ │ │
│ │ The power generation facility capacity is 10,000 kilowatts 1) │ │
│ │Merchant Power Plant. However, dams and reservoirs │ │
│ │In cases involving construction, power generation │ │
│ │with facility capacity of 3,000 kilowatts or more │ │
│ │thing, within factory site or industrial land │ │
│ │power generation facilities, 30,000 kilowatts and │ │
│ │, solar/wind power, fuel │ │
│ │Electricity for battery power plants or power generation businesses │ │
│ │In the case of a storage device for power generation facilities, │ │
│ │Those with a capacity of 100,000 kilowatts or more │ │
│ │ │ │
│ │ 2)Ground transmission of 345 kilovolts or more │ │
│ │As a track, track length (in the construction plan │ │
│ │If an underground section is included, that road │ │
│ │(including this) is 10 kilometers this │ │
│ │thing that is a prize │ │
│ │ │ │
│ │ Outdoor substations of 765 kilovolts or higher │ │
│ │ │ │
│ │ The development area is 300,000 square meters │ │
│ │Merchant Sashimi Disposal Site │ │
│ │ │ │
│ │ 5) with a development area of 50,000 square meters or more │ │
│ │Coal Yard │ │
│ │ │ │
│ │E. Article 2, Paragraph 6 of the "District Energy Business Act" │Article 22 of the "District Energy Business Act" │
│ │호에 따른 공급시설 중 발전시설 │(among heat generating facilities, │
│ │capacity is 10,000 kilowatts (factory site also │Including installation plans for bins and generators │
│ │when installed within industrial land │refers to) prior to approval │
│ │includes 30,000 kilowatts, solar and wind, │ │
│ │For fuel cell power plants or power generation businesses │ │
│ │In the case of electrical storage devices, 100,000 kil │ │
│ │Rowat) or more of the configuration of heat generating equipment │ │
│ │Business │ │
│ │ │ │
│ │B. Article 2, Paragraph 2 of the "Oil Pipeline Safety Management Act" │Article 3 of the "Oil Pipeline Safety Management Act" │
│ │(Storage │Prior to authorization pursuant to Article 1 or "liquefaction │
│ │油施設) Due to installation work, storage capacity │Safety Management and Business of Oil and Gas │
│ │Construction exceeding 100,000 kiloliters │Storage pursuant to Article 8, Paragraph 1 of the Act │
│ │ │Before obtaining installation permission for START │
│ │ │ │
│ │ │ │
│ │Company. "Petroleum and Petroleum Substitute Fuels Business │Article 6, Paragraph 1 of the "Dangerous Goods Safety Management Act" │
│ │Articles 5, 9, and 10 of the 「Act」 │Installation of hazardous materials facilities pursuant to the clause │
│ │따른 석유정제업자·석유수출입업 │is before or "Liquefied petroleum gas's │
│ │Oil storage facilities of oil companies and oil retailers, │Pursuant to Article 8 of the "Electricity Management and Business Act" │
│ │「Safety management and │Installation of a Liquefied Petroleum Gas Storage Facility │
│ │The number of liquefied petroleum gas products under Article 17 of the Business Act │Before Permission │
│ │Storage facilities of entry/exit operators or "Korea │ │
│ │Article 10, Paragraph 1, Subparagraph 3 of the Petroleum Corporation Act │ │
│ │따른 석유비축시설의 설치공사 중 │ │
│ │with a storage capacity of 100,000 kiloliters or more │ │
│ │Construction. However, consultation on the environmental impact assessment │ │
│ │Facilities installed on the factory site are the │ │
│ │Except. │ │
│ │ │ │
│ │A. Article 16-2 of the "Korea Gas Corporation Act" │Article 16-2 of the "Korea Gas Corporation Act" │
│ │따른 가스사업의 설치공사 중 저장 │Prior to approval of the implementation plan pursuant to START │
│ │Facility capacity of 100,000 kiloliters or more │ │
│ │Construction work that involves consultation on environmental impact assessment. However, │ │
│ │is │ │
│ │Exclude. │ │
│ │ │ │
│ │. "Special Act on the Expansion of the National Key Power Grid" │「Special Act on the Expansion of the National Power Grid」 │
│ │National key power grid pursuant to Article 2, subparagraph 3 │of the implementation plan pursuant to Article 11, Paragraph 1 │
│ │Among the development projects, any of the following │Before Approval │
│ │Business regarding the relevant facilities │ │
│ │ │ │
│ │ 1) Terrestrial transmission of 345 kilovolts or higher │ │
│ │As a railway line, track length(「National Infrastructure │ │
│ │Article 11 of the "Special Act on the Expansion of the Electric Power Grid" │ │
│ │, the underground section │ │
│ │If included, include its length) │ │
│ │is 10 kilometers or more │ │
│ │ │ │
│ │ Outdoor substations of 765 kilovolts or higher │ │
│ │ │ │
│ │ │ │
├────────┼───────────────────┼─────────────────┤
│4. Port's │a. Article 2, Paragraph 5 of the "Fishing Village and Fishing Port Act" │a) In cases where the designating authority implements: │
│ ConstructionProject │or │Article 19, Paragraph 1 of the "Fishing Village and Fishing Port Act" │
│ │Fishing port development company pursuant to Subparagraph 6 of the same Article │Confirmation of development plan pursuant to the START clause │
│ │Among the businesses that fall under any of the following │Before │
│ │is the construction project of facilities │b) Implementation by a person other than the designating authority │
│ │ 1) Outer facilities (length 300 meters or more │: "Fishing Village and Fishing Port Act" │
│ │or public water surface of 30,000 square meters or more │Permission for implementation pursuant to Article 23, Paragraph 2 │
│ │applicable only to cases involving landfilling │is ex │
│ │) │) A state that is not the designating authority or │
│ │ 2) Mooring facilities (30,000 m² of public water │Games implemented by local governments │
│ │or more │Right: Article 23 of the "Fishing Village and Port Act" │
│ │is treated) │with the designating authority pursuant to Paragraph 3 │
│ │ 3) Other fishing port facilities (project area is │Before consultation │
│ │150,000 square meters or more or shared water │ │
│ │then landfill of 30,000 square meters or more │ │
│ │Applies only to accompanying cases) │ │
│ │ │ │
│ │b. pursuant to Article 2, subparagraph 5 of the "Port Act" │a) In cases where the administrative authority implements: │
│ │Among the port facilities, any of the following │Pursuant to Article 9, Paragraph 9 of the "Port Act" │
│ │Construction project of the relevant facility │Prior to the announcement of other port development projects │
│ │ 1) Outer facilities (length 300 meters or more │b) Ports pursuant to the "Port Authority Act" │
│ │or public water surface of 30,000 square meters or more │공사(港灣公社)가 시행하는 │
│ │applicable only to cases involving landfilling │: Article 22 of the "Port Authority Act" │
│ │) │Prior to approval of the implementation plan pursuant to START │
│ │ 2) Mooring facilities (30,000 m² of public water │da) Implemented by a party other than the administrative authority │
│ │or more │: Article 9 of the "Port Act" │
│ │is treated) │Prior to the approval of the plan pursuant to Paragraph 2 │
│ │ 3) Other port facilities (reclamation of public waters │ │
│ │is involved, the landfill area │ │
│ │Applicable only to those of 30,000 square meters or more, │ │
│ │not involving reclamation of public waters │ │
│ │where the project area is less than 150,000 square meters │ │
│ │only applies to those of 100 or more) │ │
│ │ │ │
│ │. Pursuant to Article 2, Paragraph 1 of the "Port Act" │a) implementing pursuant to the "Port Act" │
│ │Ports and Article 2 of the "Act on the Promotion of New Port Construction" │Among the cases where the administrative authority implements │
│ │Quasi- │: Article 9, Paragraph 9 of the "Port Act" │
│ │During the construction project, the dredging area is less than 100,000 square meters │Notice of Port Development Project pursuant to START │
│ │or more, or dredging volume of 200,000 tax │Before │
│ │or more. However, routes and positions │b) implementing pursuant to the "Port Act" │
│ │Dredging to maintain anchorages, etc. │Among the cases where a non-management agency implements │
│ │Dredging to remove pollutants is │: Article 9, Paragraph 2 of the "Port Act" │
│ │Exclude. │or │
│ │ │「Management of public waters and landfill │
│ │ │Point pursuant to Article 8 of the "Act concerning..." │
│ │ │Before permission for use or application │
│ │ │d) In accordance with the "Act on the Promotion of New Port Construction" │
│ │ │: 「New Port │
│ │ │Article 8, Paragraph 1 of the Construction Promotion Act │
│ │ │Prior to the approval of the implementation plan pursuant to START │
│ │ │ │
│ │d. Article 2, Paragraph 2 of the “New Port Construction Promotion Act” │Article 8, Paragraph 1 of the "Act on the Promotion of New Port Construction" │
│ │, │Prior to approval of the implementation plan pursuant to the START clause │
│ │Any of the following facilities │ │
│ │Construction business of START │ │
│ │ 1) As an outer facility, a length of 300 meters │ │
│ │30,000 square meters of surface or public water │ │
│ │involving landfilling of more than │ │
│ │ 2)30,000 square meters of public water as a mooring facility │ │
│ │involving landfilling of more than a meter │ │
│ │ 3) Area developed as other port facilities │ │
│ │This is 150,000 square meters or more or shared │ │
│ │Reclamation of more than 30,000 square meters of surface area │ │
│ │Accompanying thing │ │
│ │ │ │
│ │M. Port Redevelopment and Development of Surrounding Areas │「Port Redevelopment and Development of Surrounding Areas │
│ │Pursuant to Article 2, Subparagraph 4 of the "Act on START" │Pursuant to Article 17 of the "Act on START" │
│ │Among other port redevelopment projects, the project area is │prior to approval of other implementation plans │
│ │Port redevelopment of 300,000 square meters or more │ │
│ │business or any of the following │ │
│ │Construction project of the relevant facility │ │
│ │ 1) As an outer facility, a length of 300 meters │ │
│ │30,000 square meters of surface or public water │ │
│ │involving landfilling of more than │ │
│ │ 2) As a mooring facility, 30,000 square meters of public water │ │
│ │involving landfilling of more than │ │
│ │ 3) Area developed as other port facilities │ │
│ │This is 150,000 square meters or more or shared │ │
│ │Reclamation of more than 30,000 square meters of surface area │ │
│ │Accompanying thing │ │
│ │ │ │
│ │B. "Establishment and management of marina ports, etc. │「Establishment and management of marina ports, etc. │
│ │...in accordance with subparagraph 2 of Article 2 of the Act concerning [the ...] │Implementation pursuant to Article 13 of the "Act Concerning..." │
│ │Among the following, any of the following: │Before plan approval │
│ │Construction project of the relevant facility │ │
│ │ 1) Outer facilities (length 300 meters or more also │ │
│ │refers to every public water surface of 30,000 square meters or more │ │
│ │(Applies only to cases involving a lip) │ │
│ │ 2) Mooring facilities (30,000 m² of public water │ │
│ │Applicable only to those involving landfilling of │ │
│ │) │ │
│ │ 3) Other port facilities (reclamation of public waters │ │
│ │, the landfill area is 3 │ │
│ │Applicable only to those of 10,000 square meters or more, and │ │
│ │not involving reclamation of public waters │ │
│ │the project area is 150,000 square meters │ │
│ │(Applies only to meters or more) │ │
│ │ │ │
│ │ │ │
├────────┼───────────────────┼─────────────────┤
│5. Road's │Article 2, Paragraph 1 of the "Road Act" and the "National Land Accounting │a) pursuant to Article 23 of the “Road Act” │
│ConstructionProject │Article 2, Paragraph 13 of the "Act on Planning and Utilization of..." │In cases where the managing authority implements: Same │
│ │, the following │is a road section pursuant to Article 25 of the Act │
│ │is a business corresponding to one │Before the decision of the station │
│ │ 1) New construction of 4 kilometers or more(「National Land │b) pursuant to Article 23 of the “Road Act” │
│ │Act on the Planning and Use of START │Implemented by a party other than the administrative authority │
│ │In urban areas pursuant to Article 6, subparagraph 1 │: pursuant to Article 36 of the same Act │
│ │is a road with a width of 25 meters or more │Before obtaining permission for construction execution │
│ │]. However, the "Road Act" [ │da) "Regarding the planning and use of national land │
│ │Expressways pursuant to Article 10, subparagraph 1 and │Pursuant to Article 2, Subparagraph 11 of the "Act on..." │
│ │「Regarding the Planning and Use of National Land │Built as a different city/county planning project │
│ │Article 2, Paragraph 2, Subparagraph 1 of the Enforcement Decree of the Act │In the case of establishing: Article 88 of the same Act │
│ │Motor vehicle exclusive use road pursuant to subparagraphs (b) and (g) │Approval of the implementation plan pursuant to Paragraph 2 │
│ │In the case of a road or an underground road, that │is ex │
│ │It shall not be so. The same applies hereinafter) │ │
│ │ 2) Existing roads with two or more lanes in each direction │ │
│ │Extension of more than 10 kilometers in length from START │ │
│ │ 3) Case of simultaneous establishment and expansion │ │
│ │, │ │
│ │Those whose sum of the values is 1 or greater │ │
│ │ (Sum of lengths of newly constructed sections / 4km) + │ │
│ │(Sum of extended section lengths/10km) │ │
│ │ 4) As a result of the construction of new roads, urban areas and non- │ │
│ │If it spans across urban areas │ │
│ │Value calculated according to the following formula │ │
│ │is 1 or more (4-lane round trip │ │
│ │is considered to be 25 meters or more in width) │ │
│ │ │ │
│ │ (Sum of non-urban section lengths/4km) + │ │
│ │(Sum of city section lengths/4km) │ │
│ │ │ │
│ │ │ │
├────────┼───────────────────┼─────────────────┤
│6. Water Resources │A. "Dam Construction, Management, and Support for Surrounding Areas │「Dam Construction, Management, and Support for Surrounding Areas │
│Development of START │Installation of dams pursuant to the "Act on etc." │Article 12, Paragraph 1 of the Act on the Matters Concerning etc. │
│Business │As a construction project, the full water surface area is 2 million square meters │or of the implementation plan pursuant to Paragraph 2 │
│ │or more, or total storage capacity of 2,000 │Before establishment or approval │
│ │Only those larger than cubic meters │ │
│ │ │ │
│ │B. Pursuant to Article 2, Subparagraph 3 of the River Act │a) a) pursuant to Article 8 of the River Act │
│ │as the construction of an estuary dam among river facilities │In cases where the Cheonan Management Agency implements: │
│ │, the full water surface area is 2 million square meters │The river pursuant to Article 27 of the "River Act" │
│ │or total reservoir capacity is 20 million │Before establishing the drilling work implementation plan │
│ │Those larger than square meters │b) River pursuant to Article 8 of the "River Act" │
│ │ │Implemented by a person other than the administrative agency │
│ │ │: Article 30 of the "River Act" │
│ │ │Before permission pursuant to Paragraph 1 │
│ │ │ │
│ │. Article 2, subparagraph 6 of the "Rural Development Act" │Pursuant to Article 9 of the "Rural Development Act" │
│ │, Mansu-myeon │Implementation Plan for Agricultural Production Infrastructure Improvement Project │
│ │If the area is 2 million square meters or more, or │, │
│ │Total storage capacity is 20 million cubic meters │ │
│ │Reservoirs, weirs, or maintenance exceeding │ │
│ │The Composition of a Pond │ │
│ │ │ │
│ │ │ │
├────────┼───────────────────┼─────────────────┤
│7. Railroad │a. "Construction of railways and maintenance of railway facilities │a) "Regarding the Planning and Use of National Land │
│(Urban Railway │Article 2, Paragraph 1 of the "Act on Management" · │Pursuant to Article 2, Subparagraph 11 of the "Act on..." │
│도포 │No. 2 or "National Land Planning and this │As a city/county planning project, the city │
│(includes) │Article 2, subparagraph 6 of the "Act on the Use of..." │In cases where it is performed: Article 88 of the same Act │
│Construction of START │따른 철도 또는 고속철도의 건설사 │Approval of the implementation plan pursuant to Paragraph 2 │
│Business │During uphill, if the length is 4 kilometers or more │is former │
│ │or the area of railway facilities is less than 100,000 square meters │b) implemented as other projects │
│ │or longer. However, "Railway business │: "Construction of railways and railway │
│ │Exclusive railway pursuant to Article 2, Subparagraph 5 of the Act │Act on the Maintenance and Management of Facilities」 │
│ │inside the factory, │Promotion of the implementation plan pursuant to Article 9 │
│ │Except. │before │
│ │ │ │
│ │b. Article 2, Paragraph 2 of the Urban Railway Act and │Pursuant to Article 7 of the "Urban Railway Act" │
│ │Urban railway and urban railway pursuant to No. 3 │Before approval of business plan │
│ │Among the construction projects for urban facilities, the length is 4 ki │ │
│ │meter or more or urban railway facilities │ │
│ │The area of (including the site) is 100,000 │ │
│ │Those larger than square meters │ │
│ │ │ │
│ │. Pursuant to Article 2, Subparagraph 7 of the "Rail Transport Act" │Rail pursuant to Article 4 of the "Rail Transport Act" │
│ │other railway business ( │prior to the business permit or the same Act │
│ │(including dedicated tracks, etc.) as │Approval of dedicated tracks pursuant to Article 5 │
│ │A business corresponding to any of the following │Before │
│ │ 1) Article 2, subparagraph 5 of the "Rail Transport Act" │ │
│ │The length of the cable car is 2 kilometers │ │
│ │or higher │ │
│ │ 2) Article 2, subparagraph 1 of the "Rail Transport Act" │ │
│ │of the orbit (excluding cable cars) │ │
│ │If the length is 4 kilometers or more │ │
│ │ Article 2, subparagraph 3 of the "Rail Transport Act" │ │
│ │따른 궤도시설(부지를 포함한다) │ │
│ │is 100,000 square meters or more │ │
│ │th │ │
│ │ │ │
│ │ │ │
├────────┼───────────────────┼─────────────────┤
│8. Airport │Article 2, subparagraph 9 of the "Airport Facilities Act" or │Article 7, Paragraph 6 of the "Airport Facilities Act" │
│or non- │10 │prior to the notification of the implementation plan pursuant to the inquiry │
│President’s │Among the Jang development projects, one of the following │ │
│ ConstructionProject │Relevant Business │ │
│ │ 1) Airport or "Enforcement of the Airport Facilities Act │ │
│ │Land expenses pursuant to Article 2, Subparagraph 1 of the "Ordinance" │ │
│ │Establishment of Bank President │ │
│ │ 2)Runway longer than 500 meters │ │
│ │Construction of START │ │
│ │ 3) Other airport development projects or non- │ │
│ │As a bank development project, the project area is │ │
│ │Those with more than 200,000 square meters │ │
│ │ │ │
│ │ │ │
├────────┼───────────────────┼─────────────────┤
│9. of the stream │The "River Act" carried out in the following areas │a) pursuant to Article 8 of the River Act │
│Utilization and Development Project │Among the river works pursuant to Article 2, Subparagraph 5, the work │In cases where the Cheonan Management Agency implements: │
│ │The section is 10 kilometers along the river center length. │The river pursuant to Article 27 of the "River Act" │
│ │Businesses exceeding │Before establishing the drilling work implementation plan │
│ │ 1) Pursuant to Article 2, Subparagraph 2 of the "River Act" │b) River pursuant to Article 8 of the River Act │
│ │River Area │Implemented by a person other than the Incheon Management Agency │
│ │ 2) Hong pursuant to Article 12 of the "River Act" │is the case │
│ │Water Management Area │ │
│ │ │ │
│ │ │ (1) a state or local government │
│ │ │: Article 6 of the "River Act" │
│ │ │prior to │
│ │ │ (2) The state or local government │
│ │ │In the case of a person who is not: "River Act" │
│ │ │Related entity pursuant to Article 30, Paragraph 2 │
│ │ │Before │
│ │ │ │
│ │ │da) "Investigation and planning of water resources and │
│ │ │Article 29 of the "Act on the Management of..." │
│ │ │National Water Resources Management Committee pursuant to Article 1 │
│ │ │The Committee or Article 32 of the same Act │
│ │ │Regional Water Resources Management Committee pursuant to Article 1 │
│ │ │In cases subject to deliberation by the Committee: National │
│ │ │Gas Resources Management Committee or G │
│ │ │Deliberation by the Reverse Water Resources Management Committee │
│ │ │Before │
│ │ │ │
│ │ │ │
├────────┼───────────────────┼─────────────────┤
│10. Clearing │a. "Regarding the Management and Reclamation of Public Waters │a) State, local government or public │
│and share │Landfill company pursuant to Article 2, Subparagraph 4 of the Act │In the case of public pipe landfill: │
│ofSleep's │Among businesses, the business area is any of the following │「Management of public waters and landfill │
│Landfill Project │Business corresponding to me │Article 35, Paragraph 1 of the "Act concerning..." │
│ │ Article 2, Subparagraphs 2 and 3 of the "Port Act" │Consultation or approval of landfill pursuant to START │
│ │Trade ports, coastal ports and "New " in accordance with the [new] │Before │
│ │Article 2, subparagraph 1 of the Port Construction Promotion Act │b) Other cases where a person buries land │
│ │, "National Land Planning and │Right: "Management of public waters and landfill │
│ │Article 6, Paragraph 4 of the "Act on the Use of..." │Pursuant to Article 28 of the "Act on START" │
│ │에 따른 자연환경보전지역에서의 │Reclaimed landfill license before │
│ │In the case of a landfill project: 30,000 m² │ │
│ │or more │ │
│ │ 2) Landfill projects in other areas │ │
│ │: 300,000 square meters or more │ │
│ │ │ │
│ │b. Article 2, Subparagraph 5 of the "Rural Development Act" │Pursuant to Article 9 of the "Rural Development Act" │
│ │Land reclamation or land clearing projects pursuant to the START item │Implementation Plan for Agricultural Production Infrastructure Improvement Project │
│ │Among businesses with a business area of 1 million square meters │, │
│ │Things that are more than │ │
│ │ │ │
│ │ │ │
├────────┼───────────────────┼─────────────────┤
│11. Tourism │a. Pursuant to Article 2, Paragraph 1 of the Tourism Promotion Act │Article 4, Paragraph 1 of the "Tourism Promotion Act" │
│The opening of the complex │Among other tourism businesses, the business area is 300,000 │(Tourism Accommodation │
│StartBusiness │Those larger than square meters │The shipping business is under Article 15, Paragraph 1 of the same Act. │
│ │ │) or │
│ │ │Article 5, Paragraphs 1 and 2 of the same Act and │
│ │ │Permission for tourism business pursuant to Paragraph 4 │
│ │ │or report before │
│ │ │ │
│ │b. Article 2, subparagraph 6 of the Tourism Promotion Act and │Article 54, Paragraph 1 of the "Tourism Promotion Act" │
│ │Tourist sites and tourist complexes pursuant to No. 7 │따른 조성계획의 승인 전 │
│ │, the project area is 300,000 │ │
│ │Those larger than square meters │ │
│ │ │ │
│ │. Under Article 10-2, Paragraph 4 of the "Hot Spring Act │Pursuant to Article 10, Paragraph 1 of the "Hot Spring Act" │
│ │따른 온천원보호지구에서의 온천개 │Before approval of hot spring development plan │
│ │Among the development projects, the project area is less than 300,000 square meters │ │
│ │or more than │ │
│ │ │ │
│ │ra. Article 2, subparagraph 9 of the "Natural Parks Act" │a) Article 4, Paragraph 2 of the "Natural Parks Act" │
│ │, the project area is 10 │the park company │
│ │Those with more than 10,000 square meters │When doing a business: 「Nature Park │
│ │ │Park project pursuant to Article 19 of the Act │
│ │ │Before the decision of the implementation plan │
│ │ │b) Article 4, Paragraph 2 of the "Natural Parks Act" │
│ │ │에 따른 공원관리청이 아닌 │
│ │ │When implemented by the individual: 「Natural │
│ │ │Park pursuant to Article 20 of the Parks Act │
│ │ │Before the implementation permit of the project │
│ │ │ │
│ │E. "Regarding the Planning and Use of National Land │「Act on Planning and Utilization of National Land │
│ │The province pursuant to Article 2, Subparagraph 11 of the "Act" │Implementation pursuant to Article 88, Paragraph 2 of the "Rate" │
│ │Installation in amusement parks among city/county planning projects │Before the authorization of the plan │
│ │The facility area of 100,000 square meters or more │ │
│ │thing that is a prize │ │
│ │ │ │
│ │B. "Act on Urban Parks and Green Spaces, etc." │a) "Regarding urban parks and green spaces, etc. │
│ │Of park facilities pursuant to Article 2, Subparagraph 4 of the [] rate │Public pursuant to Article 20 of the Act [which...] │
│ │During the installation project, in any of the following │In cases where the original management agency implements: │
│ │Business being subjected │「Regarding urban parks and green spaces, etc. │
│ │ The total area of park facilities is 100,000 square meters │Pursuant to Article 19, Paragraph 1 of the "Act on..." │
│ │meters or more │Before the installation of other city parks │
│ │ 2) Park Facility Area and Non-Park Facility Area │b) "Regarding urban parks and green spaces, etc. │
│ │is 100,000 square meters or more │Public pursuant to Article 20 of the Act [which...] │
│ │project(「Regarding urban parks and green spaces, etc. │Implemented by a party other than the original administrative authority │
│ │Civil under Article 16, Paragraph 3 of the "Act on the Civil..." │: "To the Planning and Use of National Land │
│ │Only in cases where the park promoter installs │regarding the actual [substance] pursuant to Article 88 of the "Act on the Matters Concerning..." │
│ │corresponding) │Before approval of the city plan │
│ │ │ │
│ │ │ │
├────────┼───────────────────┼─────────────────┤
│12. Origin │a. Pursuant to Article 2, Paragraph 1 of the Mountain Area Management Act │ │
│Development of START │Any of the following implemented in other mountainous areas │ │
│Business │Business corresponding to one │ │
│ │ │ │
│ │ Article 2 of the "Act on Funeral Services, etc." │a) City/Provincial Governor or Mayor/County │
│ │A cemetery pursuant to subparagraphs 7 and 9 or │In cases where the Head of the District or Office installs: │
│ │Project side of the installation project for columbarium facilities │"Act on Business, etc." No. │
│ │Projects with an area of 250,000 square meters or more │Before installation/construction pursuant to Article 13 │
│ │ │b) Other persons private cemeteries and │
│ │ │The process of installing a private burial facility │
│ │ │Right: "Act on Business, etc." │
│ │ │pursuant to Article 14 or 15 │
│ │ │Before permission or notification │
│ │ │ │
│ │ 2) pursuant to Article 2, subparagraph 1 of the “Pasture Act” │Pasture land fee pursuant to Article 5 of the "Pasture Land Act" │
│ │The area created during the grassland creation project is │Permission of the castle before │
│ │Projects exceeding 300,000 square meters │ │
│ │ │ │
│ │ 3) Among businesses other than 1) and 2), "Sanji │a) "Regarding the Planning and Use of National Land │
│ │Mountain pursuant to Article 14, Paragraph 1 of the "Management Act" │Article 51, Paragraph 3, Subparagraph 1 of the "Act on..." │
│ │The area of land use permit is 200,000 square meters │따른 지구단위계획구역에서의 │
│ │Businesses exceeding │Project[Forest Road Installation Project │
│ │ │is excluded: 「National Territory │
│ │ │Act on the Planning and Use of START │
│ │ │District unit pursuant to Article 49 of the "Rate" │
│ │ │Before the establishment of a plan or under the same Act │
│ │ │Implementation system pursuant to Article 88, Paragraph 2 │
│ │ │Before the authorization of the plan │
│ │ │b) In the case of other businesses: 「San │
│ │ │Mountain pursuant to Article 14 of the Land Management Act │
│ │ │Land Use Permit Before │
│ │ │ │
│ │B. "Regarding the Creation and Management of Forest Resources │「Regarding the creation and management of forest resources │
│ │Forest road pursuant to Article 2, Subparagraph 1, Item (d) of the Act │pursuant to Article 9, Paragraph 1 of the "Act on..." │
│ │During the installation project of the (Forest Road) The following │Before the installation of forest road facilities │
│ │Business corresponding to one │ │
│ │ 1) Total route length is 8 kilometers or more │ │
│ │business │ │
│ │ 2) Total route length is 4 kilometers or more │ │
│ │A project that is (Article 4, Paragraph 1 of the "Mountain Area Management Act") │ │
│ │Forest land for public interest pursuant to Subparagraph 1, Item (b) of the START │ │
│ │Only in the case of business conducted in START, please... │ │
│ │is treated) │ │
│ │ │ │
│ │. "Act on the Promotion of Forest Welfare" │「Act on the Promotion of Forest Welfare」 │
│ │Forest welfare complex pursuant to Article 2, Subparagraph 10 │Of the implementation plan pursuant to Article 35, Paragraph 1 │
│ │에 조성되는 산림복지시설별 산지 │Before Approval │
│ │The total exclusive area is 200,000 square meters │ │
│ │Merchant Business │ │
│ │ │ │
│ │ │ │
├────────┼───────────────────┼─────────────────┤
│13. Specific │a. Nos. 1 through 12, Part 14 │Act on Regional Development and Support │
│region's │Environmental impact assessment pursuant to No. 17 │Implementation pursuant to Article 23, Paragraph 1 of the "Rate" │
│DevelopmentProject │companies falling within the scope of the target business │Before plan approval │
│ │Among the businesses, regarding "regional development and support" │ │
│ │Business implemented pursuant to the “Act” │ │
│ │ │ │
│ │B. "Act on Regional Development and Support" │Act on Regional Development and Support │
│ │Regional development projects pursuant to the "Rule" (Act │Implementation pursuant to Article 23, Paragraph 1 of the "Rate" │
│ │No. 12737 Regional Development and Support │Before plan approval │
│ │Pursuant to Article 4, Paragraph 3 of the Addenda to the Act concerning │ │
│ │considered as a regional development project area │ │
│ │Previous "Balanced Regional Development and Local SMEs │ │
│ │Pursuant to the "Act on the Promotion of Enterprises" │ │
│ │In the designated and notified comprehensive regional development district │ │
│ │Applicable only to regional development projects implemented by START │ │
│ │Among the projects with a business area of less than 200,000 square meters │ │
│ │or more than │ │
│ │ │ │
│ │. "Peace following the relocation of USFK bases │Act on National Defense and Military Facilities Projects │
│ │Special Measures Concerning Support, etc. for Taxis, etc. │National Defense and Military pursuant to Article 6, Paragraph 1 of the " Rate" │
│ │USFK pursuant to Article 2, Subparagraph 4 of the "START Act" │Facility Project Implementation Plan │
│ │FacilityBusiness │ │
│ │ │ │
│ │. "Peace following the relocation of USFK bases │「Peace following the relocation of USFK bases │
│ │Special Measures Concerning Support, etc. for Taxis, etc. │Special Measures Concerning Support, etc. for Taxis, etc. │
│ │Internationalization system pursuant to Article 2, subparagraph 9 of the Act │of the development plan pursuant to Article 23 of the Act │
│ │Development project of the plot district │Before Approval │
│ │ │ │
│ │E. "Peace following the relocation of USFK bases │a) "Regarding the relocation of USFK bases │
│ │Special Measures Concerning Support, etc. for Taxis, etc. │Regarding support, etc. by Pyeongtaek City, etc. │
│ │Pyeongtaek City Development Company pursuant to Article 16 of the Act │From Article 16, Subparagraph 1 of the "Special Act" │
│ │UP │Persons subject to the provisions up to No. 3 │
│ │ │is implemented: "USFK │
│ │ │Pyeongtaek City following the relocation of the military base │
│ │ │Special provisions regarding support, etc. │
│ │ │pursuant to Article 17, Paragraph 7 of the "Act" │
│ │ │Before finalization of business plan │
│ │ │b) "Due to the relocation of USFK bases │
│ │ │Regarding support, etc. by Pyeongtaek City, etc. │
│ │ │Pursuant to Article 16, Subparagraph 4 of the "Special Act" │
│ │ │In cases where another person performs it: No. 17 │
│ │ │of the development project pursuant to Paragraph 1 │
│ │ │Before implementation approval │
│ │ │ │
│ │B. "For follow-up measures for the new administrative capital │「For follow-up measures for the new administrative capital │
│ │Yeongi-Gongju Area Multifunctional Administrative City │Yeongi-Gongju Area Administrative Center Complex Map │
│ │Article 2, Paragraph 1 of the "Special Act on Construction" │Special Act on the Construction of Cities No. 21 │
│ │Construction of the Multifunctional Administrative City according to START │Approval of the implementation plan pursuant to Paragraph 1 of the Article │
│ │Business │prior or under Article 53, Paragraph 1 of the same Act │
│ │ │따른 주변지역지원사업의 계획 │
│ │ │Before establishment │
│ │ │ │
│ │Company. "Designation and Operation of Free Economic Zones │「Designation and Operation of Free Economic Zones │
│ │Article 2, subparagraph 1 of the "Special Act on START" │pursuant to Article 9 of the “Special Act on START” │
│ │(No │Before approval of implementation plan │
│ │Issues 1 through 12, Issues 14 through │ │
│ │Environmental regulations pursuant to the provisions of No. 17 │ │
│ │corresponding to the type of project subject to future evaluation │ │
│ │where the scale of the evaluation is greater than │ │
│ │Applicable only to development projects in Free Economic Zones │ │
│ │) │ │
│ │ │ │
│ │A. Article 2 of the "Special Act on Enterprise City Development" │"Special Act on Enterprise City Development" No. 12 │
│ │Enterprise city development project pursuant to No. 3 │Prior to approval of the implementation plan pursuant to Article │
│ │ │ │
│ │. Delete <2017. 3. 29.> │ │
│ │ │ │
│ │차. 「Special Act on the Utilization of Waterfront Areas」 │「Special Act on the Utilization of Waterfront Areas」 │
│ │Waterfront area development project pursuant to Article 13 │Of the implementation plan pursuant to Article 13, Paragraph 3 │
│ │(Waterfront area pursuant to Article 26 of the same Act │Before Approval │
│ │Projects directly related to the development project │ │
│ │Includes) │ │
│ │ │ │
│ │ │ │
├────────┼───────────────────┼─────────────────┤
│14. PE │a. "Regarding the installation and use of sports facilities │a) "Installation and use of sports facilities │
│Facility's │Physical education city pursuant to Article 2, Subparagraph 1 of the Act │pursuant to Article 12 of the "Act concerning..." │
│InstallationProject │During the installation work of the facility, the project area is 25 │Before approval of the business plan or the same │
│ │things larger than 10,000 square meters │Installation of facilities pursuant to Article 16 of the Act │
│ │ │Before │
│ │ │b) "Regarding the planning and use of national land │
│ │ │Pursuant to Article 88, Paragraph 2 of the "Act on..." │
│ │ │prior to the approval of another implementation plan │
│ │ │ │
│ │B. Article 2, Paragraph 1 of the "Cycling and Boat Racing Act" │Article 5, Paragraph 1 of the "Cycling and Boat Racing Act" │
│ │Bicycle racing or boat racing facilities pursuant to No. 2 │prior to permission │
│ │, the project area is 250,000 │ │
│ │Those larger than square meters │ │
│ │ │ │
│ │. Article 10 of the "Youth Activities Promotion Act" │a) The State or a local government │
│ │Installation of youth training facilities pursuant to START No. 1 │When installing: 「Youth Activities │
│ │The project area during the project is 300,000 square meters │Pursuant to Article 11, Paragraph 1 of the "Promotion Act" │
│ │Things that are more than │Before the installation of other training facilities │
│ │ │b) An individual, corporation, or organization │
│ │ │: 「Youth Activities │
│ │ │Pursuant to Article 11, Paragraph 3 of the "Promotion Act" │
│ │ │other permission before │
│ │ │ │
│ │d. Article 47 of the "Youth Activities Promotion Act" │Article 48 of the "Youth Activities Promotion Act" │
│ │Establishment of a Youth Training District pursuant to Article 1 │Youth pursuant to Paragraphs 1 and 2 │
│ │The project area during the project is 300,000 square meters │Establishment of a training district development plan or │
│ │Things that are more than │Before Approval │
│ │ │ │
│ │M. Pursuant to Article 4 of the "Korea Racing Authority Act" │Pursuant to Article 4 of the "Korea Racing Authority Act" │
│ │Among the racetrack installation projects, the project area is │Before granting permission for racetrack installation │
│ │Those with 250,000 square meters or more │ │
│ │ │ │
│ │ │ │
├────────┼───────────────────┼─────────────────┤
│15. Discard │a. Article 2, subparagraph 8 of the "Waste Management Act" │a) Obtain a permit for waste treatment business │
│Water Treatment │, the following │A person intending to install a waste treatment facility │
│Facilities·Branch │installer of a facility corresponding to one of │If you intend to install: 「Waste pipe │
│When treating urine │UP │Act" │
│Seol and Ga │ 1) As a landfill facility among final disposal facilities │Suitability of the Waste Treatment Business Plan │
│Livestock Manure Disposal │Process only waste other than designated waste │Prior to notification or Article 25 of the same Act │
│Lee Facility │The development area of the facility is 300,000 │Before the change permit pursuant to Paragraph 11 │
│Installation of START │m²m or more, or landfill volume │b) Obtain a permit for waste treatment business │
│ │330 million cubic meters or more │Persons other than those intending to dispose of waste │
│ │ 2) As a landfill facility among final disposal facilities │If you intend to install the facility: │
│ │Of facilities that process only designated waste │Article 29, Paragraph 2 of the "Waste Management Act" │
│ │If the development area is 50,000 square meters or more │clause │
│ │or landfill volume 250,000 cubic meters │Before installation approval or "Waste │
│ │or more than │Promotion of installation of treatment facilities and surrounding areas │
│ │ 3) As a landfill facility among final disposal facilities │Act on Support for Regions, etc. │
│ │Waste other than designated waste and designated │Waste treatment pursuant to Article 11-3 │
│ │waste at the same landfill │Before approval of facility installation plan │
│ │, any of the following │ │
│ │Sum of values calculated according to the formula │ │
│ │that this is 1 or more │ │
│ │ ) │ │
│ │┌┐ │ │
│ │││ │ │
│ │└┘ │ │
│ │ b) │ │
│ │┌┐ │ │
│ │││ │ │
│ │└┘ │ │
│ │ 4) As an incineration facility among intermediate disposal facilities │ │
│ │with a processing capacity of 100 tons or more per day │ │
│ │th │ │
│ │ 5) Annex to the Enforcement Decree of the Waste Management Act │ │
│ │3 Cement calcination pursuant to Subparagraph 3(d) │ │
│ │To START [Daily facility specifications (capacity) is 100 tons │ │
│ │] │ │
│ │ │ │
│ │or. any of the following: │ │
│ │As a facility with a processing capacity of 100 tons per day │ │
│ │. However, Article 2 of the "Sewerage Act" │ │
│ │As a public sewage treatment facility pursuant to No. 9 │ │
│ │TTreat manure or livestock manure │ │
│ │is treatment facilities and "Management of Livestock Manure │ │
│ │Article 2, Paragraph 4 of the "Act on the Act on the Use and Use of..." │ │
│ │에 따른 가축분뇨를 퇴비로 만드는 │ │
│ │of the "Fertilizer Management Act" │ │
│ │Fertilizer production business, etc. pursuant to Article 11, Paragraph 3 │ │
│ │As a facility required for recording, livestock manure treatment │ │
│ │When there is no effluent in the treatment process │ │
│ │The theory is excluded. │ │
│ │ │ │
│ │ 1) Article 2, Subparagraph 11 of the "Sewerage Act" │a) A facility established by the Mayor or Provincial Governor │
│ │Sewage treatment facility according to │Right: Article 11, Section 2 of the "Sewerage Act" │
│ │ │clause │
│ │ │b) The Mayor, County Governor, or District Head shall install │
│ │ │: Article │
│ │ │pursuant to Article 11, Paragraph 3 or 4 │
│ │ │The authorization before │
│ │ │da) Not the head of a local government │
│ │ │In cases where the individual performs the task: "Sewerage │
│ │ │pursuant to Article 16, Paragraph 1 of the "Map Method" │
│ │ │Before Approval │
│ │ │ │
│ │ 2) 「On the management and use of livestock manure │「Regarding the management and use of livestock manure │
│ │Article 2, subparagraph 8 of the "Act concerning..." or │Articles 12, 24, and 27 of the "Act on..." │
│ │Treatment facilities or public facilities pursuant to No. 9 or public │Treatment facilities pursuant to Article 28 or Article 28 │
│ │TreatmentFacility │Installation of public treatment facilities prior to installation permit │
│ │ │Livestock manure recycling facilities prior to approval │
│ │ │Others under the “Building Act” for installation │
│ │ │Prior to licensing or permits under the law or │
│ │ │Before obtaining a permit for livestock manure treatment business │
│ │ │ │
│ │ Article 2, Paragraph 8 of the "Waste Management Act" │a) Obtain a permit for waste treatment business │
│ │, intermediate │If you intend to install it yourself: │
│ │As a disposal facility or recycling facility │Article 25-2 of the "Waste Management Act" │
│ │Food waste treatment facility │clause │
│ │ │Before the notification of conformity of the plan or the same │
│ │ │is permission for change pursuant to Paragraph 11 │
│ │ │is ex │
│ │ │b) Obtain a permit for waste treatment business │
│ │ │Person other than the one intending to install │
│ │ │: Article │
│ │ │Waste disposal pursuant to Article 29, Paragraph 2 │
│ │ │Before approval of installation of the facility or │
│ │ │「Promotion of Installation of Waste Treatment Facilities │
│ │ │regarding support for surrounding areas, etc. │
│ │ │Abolition pursuant to Article 11-3 of the Act │
│ │ │Approval of the waste treatment facility installation plan │
│ │ │before │
│ │ │ │
│ │ │ │
├────────┼───────────────────┼─────────────────┤
│16. │a. "Regarding national defense and military facility projects │a) upon approval of the Minister of National Defense, etc. │
│Defense·Military │National Defense pursuant to Article 2, Subparagraph 2 of the Act · │must be done: 「Defense·Military │
│Facility's │Among military facility projects, the project area is 330,000 │Article 6 of the "Act on Facility Business" │
│InstallationProject │square meters or more. However, the same Act │Defense and military facilities pursuant to the START Article │
│ │Physical education pursuant to Article 2, Paragraph 1, Subparagraph (g) │Before approval of business implementation plan │
│ │and necessary facilities (including golf course │b) without approval from the Minister of National Defense, etc. │
│ │da), the project area is 250,000 │Cases where it is not required: 「National │
│ │Things larger than square meters │Act on Defense and Military Facilities Projects │
│ │ │National Defense and Military pursuant to Article 6 of the "Rate" │
│ │ │Before establishing the implementation plan for the facility project │
│ │ │ │
│ │B. "Protection of military bases and military facilities │ │
│ │Military base pursuant to Article 2, Subparagraph 1 of the Act │ │
│ │(excluding naval bases) within the city │ │
│ │corresponding to any of the following that are executed │ │
│ │is business │ │
│ │ 1) Construction of a new airfield │ │
│ │ 2)Construction of runways longer than 500 meters │ │
│ │ 3) As other businesses, the business area │ │
│ │Those with more than 200,000 square meters │ │
│ │ │ │
│ │. 「Military Base and Military Facilities Protection Act」 │ │
│ │Military facilities pursuant to Article 2, subparagraph 2 (Navy │ │
│ │military facilities at the base are excluded) argument │ │
│ │As a START project, any of the following │ │
│ │Relevant Business │ │
│ │ 1) Construction of a new airfield │ │
│ │ 2) of runways longer than 500 meters │ │
│ │Construction │ │
│ │ In addition, if the business area is less than 200,000 square meters │ │
│ │Businesses with more than │ │
│ │ │ │
│ │Ra. "Protection of military bases and military facilities │ │
│ │Naval base pursuant to Article 2, Subparagraph 3 of the Act │ │
│ │As a project implemented within the project │ │
│ │If the area is 150,000 square meters or more, or │ │
│ │Public water surface of 30,000 square meters or more │ │
│ │Involving a lip │ │
│ │ │ │
│ │ │ │
├────────┼───────────────────┼─────────────────┤
│17. Sat │a. pursuant to Article 2, subparagraph 2 of the River Act │a) implemented in water source protection zones │
│Seok·Mo │River area or Article 12 of the same Act │In the case of: Article 7 of the "Water Supply Act" │
│raeja │따른 홍수관리구역에서 토석·암 │Before permission for acts pursuant to Clause 4 │
│Gal·Gwang │Extracting stone, sand, gravel, or minerals │b) When extracting aggregate: 「Gol │
│water etc. │As a business where the extraction area is different │Bone pursuant to Article 22 of the "Re-harvesting Method" │
│Gatherer │A business corresponding to any of the following. │Before re-sampling permit │
│UP │However, the projects subject to item (e) or (g) However, │) When mining minerals: 「Ore │
│ │, [this] │pursuant to Article 42, Paragraph 1 of the “Start Business Act” │
│ │Except. │Before authorization of mining plan │
│ │ 1) Water supply pursuant to Article 7 of the "Water Supply Act" │d) Other cases: "River Act" │
│ │In case of collection from the original protected area: │River use pursuant to Article 33, Paragraph 1 │
│ │20,000 square meters or more │Before Approval │
│ │ 2) Upstream of the water source protection area │ │
│ │Areas within 5 kilometers of a flowing water source │ │
│ │: 50,000 m │ │
│ │or more │ │
│ │ │ │
│ │B. Pursuant to Article 2, Paragraph 1 of the "Mountain Area Management Act" │a) "Regarding the planning and use of national land │
│ │Extracting soil and rocks from other mountainous areas or mining │Article 51, Paragraph 3, Subparagraph 1 of the "Act on..." │
│ │As a business of mining water, the extraction │, │
│ │or mining area is any of the following │(excluding the installation of forest roads │
│ │Business corresponding to me │da): Article 49 of the same Act │
│ │ 1) In case of extracting soil and rocks: approval, etc. │Establishment of a district unit plan pursuant to START │
│ │The area you wish to receive is 100,000 square meters │Before │
│ │or more │b) in areas other than a) above │
│ │ 2) When mining minerals: 「Mining │In case of a startup │
│ │Mining system pursuant to Article 42, Paragraph 1 of the "Act" │ (1) In the case of soil and rock extraction: 「Mountain area │
│ │Mountain area within the mining area authorized by the plan │Mountain pursuant to Article 14 of the "Management Act" │
│ │Area of Damage(「Mountain Management Act Enforcement Decree」 │Prior to the land use permit or under the same Act │
│ │Buffer area pursuant to Subparagraph 4(a) of Attached Table 8 │Permission for soil and rock extraction pursuant to Article 25 │
│ │(Including the area of the station) this 100,000 │is ex │
│ │more than square meters │ (2) In the case of mineral mining: 「Mining │
│ │ │pursuant to Article 42, Paragraph 1 of the "Act" │
│ │ │Before authorization of the mining plan or │
│ │ │Article 15-2 of the Mountain Area Management Act │
│ │ │Temporary use of mountain land pursuant to Paragraph 1 │
│ │ │Before Permission │
│ │ │ │
│ │. Article 29, Paragraph 1 of the "Mountain Area Management Act" │Article 29, Paragraph 1 of the "Mountain Area Management Act" │
│ │is 20 │따른 채석단지의 지정 전 │
│ │Those with more than 10,000 square meters │ │
│ │ │ │
│ │. Coast (from the coastline towards the land │「Regarding the Management and Reclamation of Public Waters │
│ │Area within 1 kilometer and seaside │Article 8, Paragraph 1 of the Act or Article 10 │
│ │으로 10킬로미터 이내의 지역을 │Point of public water surface pursuant to Paragraph 1 │
│ │says. The same applies below) in "Mining │Permission for use or consultation/approval │
│ │Minerals pursuant to Article 3, Subparagraph 1 of the "Act" │Before │
│ │As a business of extraction under the “Mining Act” │ │
│ │Per unit area of a mining area pursuant to Article 13 │ │
│ │The mineral extraction area is any of the following │ │
│ │. However, typhoons and │ │
│ │caused by natural phenomena such as wind and tsunamis │ │
│ │necessary for emergency measures or ports and │ │
│ │Necessary for the maintenance and dredging of fishing grounds │ │
│ │is excluded. │ │
│ │ 1) Gangwon Special Self-Governing Province and Gyeongsangbuk-do's │ │
│ │: 20,000 square meters or more │ │
│ │ 2) For other areas: 30,000 square meters │ │
│ │meter or more │ │
│ │ │ │
│ │E. Pursuant to Article 21-2 of the Aggregate Extraction Act │Pursuant to Article 21-2 of the "Aggregate Extraction Act" │
│ │The area of the planned aggregate extraction site is 250,000 │Prior to the designation of other planned aggregate extraction sites │
│ │or more, or the sampling amount is 50 │ │
│ │Only those larger than cubic meters │ │
│ │ │ │
│ │B. Pursuant to Article 22 of the Aggregate Extraction Act │Article 22, Paragraph 1 of the "Aggregate Extraction Act" │
│ │In the case of extracting aggregates from the coast │prior to the permit for aggregate extraction │
│ │and the ore pursuant to Article 13 of the "Mining Act" │ │
│ │The extraction area per unit zone of the district is 250,000 │ │
│ │or more, or the sampling amount is 50 │ │
│ │Only those exceeding 1 cubic meter. However, │ │
│ │Applicable to projects subject to Item (e) or (g) │ │
│ │excluding cases where consultation was received │ │
│ │. │ │
│ │ │ │
│ │Inc. Under Article 34, Paragraph 1 of the "Aggregate Extraction Act" │Article 34, Paragraph 1 of the "Aggregate Extraction Act" │
│ │Designation of aggregate extraction complexes according to START │Prior to the designation of an aggregate extraction complex according to START │
│ │ │ │
│ │ │ │
└────────┴───────────────────┴─────────────────┘
Remarks
1. Any project falling under any of the following subparagraphs is a project subject to environmental impact assessment
shall be considered. In this case, the timing of consultation shall be determined based on the promotion of the main project to be deemed or the project subject to environmental impact assessment.
Set to before receiving seals, etc.
a. As a business deemed to have received approval, etc. under other laws, the exchange according to the table above
Projects subject to business impact assessment
a. Projects for which other laws stipulate that an environmental impact assessment be conducted pursuant to this Act
Projects corresponding to the scope of business according to the table above
2. Regarding the scale of the project within the scope of the target project, among the consultation request timing, the project for which approval, etc. is sought
refers to the scale.
3. In cases where a single project falls within the scope of two or more target projects, the timing of submission of the evaluation report or
The timing for the consultation request shall be the time when approval, etc. is first sought.
4. For any project falling under any of the following items, an environmental impact assessment shall be conducted for the entire project
shall be followed. However, the planned aggregate extraction site and completed linear project under Item 17, Subparagraph (e) of the above table shall be followed
Excluded from the businesses of each item.
a. Where the same business operator conducts the same type of business in the same area of influence, each business
When the sum of the scales reaches the scale subject to evaluation
a. At the time of business approval, etc., it falls under the category of a project subject to evaluation but is below the evaluation threshold scale
A project that did not undergo an environmental impact assessment in the same impact zone due to a change in the project plan
If the scale of the business reaches the scale subject to evaluation, or if the business scale and newly approved, etc.
When the sum of business sizes (applicable only when the business operators are the same) reaches the size subject to evaluation
. After the approval, etc. of the relevant project is completed, the new subject to environmental impact assessment
If the business that has become classified as a START business falls under any of the following cases
1) Projects smaller than the evaluation target scale at the time of the revision of the above table, business plans in the same influence zone
or the relevant company
The scale of the business and the regulations of the business newly approved, etc. (applicable only to cases where the business operator is the same)
If the sum of the models exceeds the scale subject to environmental impact assessment
2) Projects with an evaluation target scale or larger at the time of revision of the above table, and within the same influence zone
If the scale increase resulting from a change in the business plan is 15 percent or more of the scale subject to environmental impact assessment
or the same business operator in the same area of influence intending to obtain new approval, etc.
If the scale of a project of a certain type is 15 percent or more of the scale subject to environmental impact assessment
3) 2), pursuant to Article 2, subparagraph 6 of the “District Energy Business Act” under subparagraph 3, item (e) of the above table
The installation project of supply facilities involves a change in the business plan or new approval within the same area of influence.
etc. (only applicable when the business operator is the same) at the time of receiving approval, etc. for the relevant business
The scale of a business that increases by 15 percent or more is subject to evaluation
이 되는 규모 이상 증가하는 경우
5. Among industrial complex development projects pursuant to Article 2, Subparagraph 9 of the Industrial Location and Development Act, industrial
Construction of ports and port facility construction projects, road construction projects, and residential area development projects to be added to industrial complexes
In cases where implementation is carried out by [the relevant regulation], the scope of the target project shall be determined according to the classifications in each of the following subparagraphs [the relevant regulation]
shall be applied mutatis mutandis, provided that the timing for submitting the evaluation report or requesting consultation shall be in accordance with Subparagraph 2.
a. Housing site development project: Item 1, Subparagraph a of the above table
B. Construction of industrial ports and port facility construction projects: Item 4, Subparagraph B of the above table
. Road construction project: No. 5 of the table above
6. When carrying out the projects under Subparagraphs 2) and 2) of Item 3 (c) and 2) of Item 3 (d) of the above table, Items 12 and 17, the construction for the
In cases where access roads and ancillary facilities are installed, and when carrying out the dam construction project under Item 6, Subparagraph (a) of the table above
In the case of installing a waterway between dams, the details thereof shall be included in the evaluation report for the target project
must include.
7. In Item 5 of the table above, "newly established" refers to a modification of an existing route or a route that does not include an existing route
It refers to opening a road in a new area, and "expansion" means increasing the number of lanes on an existing route.
refers to.
8. In cases where two or more business operators carry out a project corresponding to Subparagraphs (d) and (f) of Item 17 of the above table
The environmental impact assessment for that project shall be conducted jointly.
9. Cases where the same business operator promotes two or more businesses in conjunction with a single business plan
is 1 or more, the evaluation of these projects
The documents must be integrated into a single draft, and an environmental impact assessment must be conducted for the entire project.
.
Relevant project area or capacity, etc. + · · · ·
──────────────────────
Appendix 3 Minimum Area or Capacity, etc. of Target Projects
10. A single business plan that includes two or more projects subject to environmental impact assessment according to the table above
The START project (hereinafter referred to as the "Complex Project") is classified by individual project and integrated into a single evaluation report.
must be prepared, or an evaluation report must be prepared for each individual project and discussed together. However, complex
An evaluation report cannot be prepared because individual business plans within the combined project have not been specifically determined
In cases where a separate evaluation report must be prepared and consultation conducted at the time of the consultation request for the relevant project,
.
11. Notwithstanding the table above, in any of the following cases, environmental impact assessment
Excluded from target projects.
a. Among the projects subject to Item 2, Subparagraph (d) of the table above, project areas for which environmental impact assessment consultation has already been conducted (factory sites
) and existing environmental impact assessment consultation
Environmental impacts were predicted and evaluated, including the industries to be attracted and placement plans by industry, and appropriate
In cases where the head of the consultative agency acknowledges that environmental conservation measures have been prepared
B. Among the target projects pursuant to the provisions of Item 3, Subparagraph A and Item 17, Subparagraphs D through G of the above table, "Marine
Projects subject to marine use impact assessment pursuant to Article 13 of the Marine Use Impact Assessment Act
. In a project area where environmental impact assessment consultation has already been conducted, the main purpose of the project plan (land use plan
Without changing the detailed functions of the planning and development project, only the legal basis for promotion
In cases where a complex or district is re-designated, etc., by making a change, the circumstances recognized by the head of the consultative agency
U