Annex 4 — 주택공급에 관한 규칙

286965 · 2026-06-15

■ Rules on Housing Supply [Appendix 4] <Amended Apr. 29, 2025> Timing of Tenant Recruitment (Related to Article 15, Paragraph 3) 1. General standard a. When the project owner or contractor has received a business suspension order falling under any of the following: As such, based on the point in time specified in subparagraph (c), from the date the period of business suspension ended, (d) If the period specified in the START item has not elapsed, when recruiting tenants in accordance with the individual criteria of Subparagraph 2, Sets the period. 1) Article 2, Subparagraph (c) of Annex 1 of the Enforcement Decree of the Housing Act, Subparagraphs (f) 1) through 4) of the same subparagraph, and the same subparagraph Items 6) through 9) and 14) [In the case of 14), violation of the provisions of Articles 33 through 42 of the Act [Applicable only in cases of violation of an order pursuant to Article 94 of the Act] business suspension disposition 2) Civil engineering and building construction business or building construction business pursuant to the Enforcement Decree of the Framework Act on the Construction Industry Item 2, Subparagraph (a) 6)a), Subparagraphs 7) through 11), 16) through 20) of the same subparagraph, Table 6 of the same Decree, and Business suspension order pursuant to subparagraph 3) of item (d) of the same subparagraph b. Based on the point in time specified in subparagraph c, the project owner or the contractor [regarding] the "Construction Technology Promotion Act In cases where the total penalty points pursuant to Annex 8 of the Enforcement Decree are 3.0 points or more, according to the individual criteria in Subparagraph 2 . . Based on the point in time according to the following classification, tenants Determine the recruitment period. 1) In the case of regional housing cooperatives and workplace housing cooperatives: those who have entered into an agreement pursuant to Article 5, Paragraph 4 of the Act Day 2) In the case of a remodeling housing association: The date on which the contractor was selected pursuant to Article 66, Paragraph 3 of the Act 3) In the case of urban renewal projects under Article 2, Subparagraph 2, Items (b) and (c) of the Urban and Residential Environment Improvement Act: Same is the date on which the contract pursuant to Article 29 of the Act 4) In the case of other housing construction projects: the project entity pursuant to Article 16, Paragraph 2 of the Act, the business plan Date of filing the commencement of construction report with the approving authority D. The business suspension disposition under Subparagraph A shall, from the date the business suspension period ends, for the period according to the following classifications has not passed. 1) If the business suspension period is 6 months or more: 2 years 2) If the business suspension period is 3 months or more but less than 6 months: 1 year 3) If the business suspension period exceeds 1 month but is less than 3 months: for 6 months 4) If the business suspension period is 1 month or less: for 3 months E. The business suspension period and combined penalty points shall be determined separately for the project owner and the contractor according to the following criteria. . 1) If there are two or more business suspension orders pursuant to Subparagraph (a), the respective business suspension periods shall be added together. In this case, 31 days are considered as one month. 2) If the project owner or the contractor holds both the status of a construction business operator or a registered housing construction business operator is losing, and in their respective positions, the aggregate If there are penalty points, add up each penalty point. 3) In cases where both a business suspension and penalty points exist, the entry pursuant to Subparagraph 2, Item (a) or (b) The tenant recruitment period is determined according to the following classifications based on the tenant recruitment period. a) After either one of the two or both agree to the entire ground floor standard 3 min : After the final inspection b) If either of the two corresponds to at least two-thirds of the floors above ground level of the entire building This is the case where the structural work for the number of units is completed, and the other is the case where the above-ground floors of the entire building are... When structural work corresponding to more than half of the floors has been completed: Use inspection After ) For both, structural work for a number of floors corresponding to more than half of the ground floors of the entire building is completed: When the structural work of the entire building (including the rooftop floor) is completed when d) Which of the two floors corresponds to at least two-thirds of the ground floors of the entire building This is the case where the structural work for the number of units is completed, and the other is when the above-ground floors of the entire building are completed. When structural work corresponding to at least one-third of the floors has been completed: Entire When the structural work of the building (including the rooftop floor) is completed e) Which of the two floors corresponds to more than half of the ground floors of the entire building This is the case where the structural work for the number of units is completed, and the other is when the above-ground floors of the entire building are completed. When structural work corresponding to at least one-third of the floors has been completed: All When the structural work is completed for at least two-thirds of the floors based on the ground floor of the building b) For both, structural work for a number of floors corresponding to at least one-third of the ground floors of the entire building is completed: Floors corresponding to more than half of the ground floors of the entire building When the structural work is completed f. As a result calculated separately for the project owner and contractor in accordance with Item e, the entry based on the individual criteria of Subparagraph 2 If the tenant recruitment periods differ, the standard of the later recruitment period shall apply. 2. Individual standard A. Timing of tenant recruitment by business suspension period ┌──────┬─────────────────────────────────┐ │Business Suspension Period│Tenant Recruitment Period │ │ ├─────────────────────┬───────────┤ │ │Apartment │Row Houses·Multi-family Housing │ ├──────┼─────────────────────┼───────────┤ │6 months or more │After usage test │After usage inspection │ ├──────┼─────────────────────┼───────────┤ │3 months or more │Applicable to more than two-thirds of the ground floors based on total consent │Total Consent Ground Floor Standard │ │Less than 6 months │When the structural work for the number of floors is completed │corresponding to 1/2 or more │ ├──────┼─────────────────────┤is the structural work for the number of floors │ │Over 1 month │Applicable to more than 1/2 of the ground floors based on total consent │When completed │ │Less than 3 months │When the structural work for the number of floors is completed │ │ ├──────┼─────────────────────┤ │ │1 month or less │Applicable to more than one-third of the ground floors based on total consent │ │ │ │When the structural work for the number of floors is completed │ │ └──────┴─────────────────────┴───────────┘ B. Tenant Recruitment Period by Total Penalty Points ┌──────┬─────────────────────────────────┐ │Total Penalty Points │Tenant Recruitment Period │ │ ├─────────────────────┬───────────┤ │ │Apartment │Row Houses · Multi-family Housing │ ├──────┼─────────────────────┼───────────┤ │10.0 or higher │After usage test │After usage test │ ├──────┼─────────────────────┼───────────┤ │7.0 or higher │Total consent applicable to more than 2/3 of ground floors │Total Consent Ground Floor Standard │ │less than 10.0 │When the structural work for the number of floors is completed │corresponding to 1/2 or more │ ├──────┼─────────────────────┤is the structural work for the number of floors │ │5.0 or higher │Applicable to more than 1/2 of the ground floors based on total consent │When completed │ │less than 7.0 │When the structural work for the number of floors is completed │ │ ├──────┼─────────────────────┤ │ │3.0 or higher │Applicable to more than one-third of the ground floors based on total consent │ │ │less than 5.0 │When the structural work for the number of floors is completed │ │ └──────┴─────────────────────┴───────────┘