Annex 2 — 선박의 검사 등에 관한 수수료 규칙
233585 · 2021-06-30
■ Rules on Fees for Ship Inspection, etc. [Attached Table 2]
Manufacturing Inspection Fee (Related to Article 2, Paragraph 1, Subparagraph 2)
1. Hull
(unit: won)
┏━━━━━━━━━━━┯━━━━━━━━━━━━┯━━━━━━━━━━━━┓
┃By tone level │수수료 │Remarks ┃
┠───────────┼────────────┼────────────┨
┃less than 5 │17,360 │1. Relevant equipment of the vessel┃
┃5 or higher~ Less than 10 │36,450 │Gold ┃
┃10 or higher~ Less than 20 │140,610 │solution. ┃
┃20 or more~ Less than 30 │216,420 │2. One inspector 4 hours ┃
┃30 or more~ Less than 50 │260,330 │to test during the time within ┃
┃50 or more~ Less than 100 │325,430 │, the inspection is performed once, and ┃
┃100 or more~ Less than 200 │381,920 │When exceeding one test ┃
┃200 or more~ Less than 300 │416,260 │, the inspection exceeding ┃
┃300 or more~ Less than 500 │523,470 │for each time, of the relevant fee ┃
┃500 or more~ Less than 1,000 │814,890 │Add 5 percent at a time. ┃
┃1,000 or more~ Less than 2,000 │1,295,900 │3. Design Drawings and Attachments ┃
┃2,000 or more~ Less than 5,000 │1,998,990 │type, ┃
┃5,000 or more ~ less than 10,000 │2,869,900 │40 percent of the relevant fee ┃
┃ 10,000 or more │2,869,900 when exceeding 1 ton │, ┃
┃ │. │. ┃
┗━━━━━━━━━━━┷━━━━━━━━━━━━┷━━━━━━━━━━━━┛
2. Agency
(Unit: KRW)
┏━━━━━━━━━━━━━━━━━━━┯━━━━━━━━┯━━━━━━━━┓
┃Output: KW (Horsepower: PS) │수수료 │Remarks ┃
┠───────────────────┼────────┼────────┨
┃ less than 75(100) │28,390 │1. Remarks to Item 1 ┃
┃ 75 (100) or more~ Less than 185(250) │81,350 │. ┃
┃ 185 (250) or more~ Less than 370(500) │128,250 │2. The output is period ┃
┃ 370 (500) or more~ Less than 735(1,000)│213,450 │Tubes and orthotics ┃
┃ 735 (1,000) or more~ Less than 1,100(1,500)│249,830 │Total output of tube ┃
┃ 1,100 (1,500) or more~ Less than 1,839(2,500)│393,460 │power ┃
┃ 1,839 (2,500) or more~ Less than 3,678(5,000)│597,580 │. ┃
┃ 3,678 (5,000) or more~ Less than 7,355(10,000)│898,360 │3. Turbine engine ┃
┃ 7,355(10,000) or more ~ 14,710(20,000) less│1350,540 │, extraction ┃
┃14,710 (20,000) or more ~ 36,775 (50,000) less│2,030,320 │Power (SHP) is ┃
┃36,775(50,000) or more │2,030,320 │and ┃
┃ │Output │Internal combustion engine light ┃
┃ │735KW(1,000P │above is braking output ┃
┃ │S)Whenever exceeded │(BHP) ┃
┃ │Add 147,700 │. ┃
┃ │한다 │ ┃
┗━━━━━━━━━━━━┷━━━━━━━━━━━━┷━━━━━━━━━━┛
3. Other Facilities (Drainage? Steering? Mooring and Anchoring? Electrical Facilities)
(Unit: KRW)
┏━━━━━━━━━━━┯━━━━━━━━━━━━┯━━━━━━━━━━━┓
┃By tone level │수수료 │Remarks ┃
┠───────────┼────────────┼───────────┨
┃less than 5 │21,100 │Same as the remarks in Item 1.┃
┃5 or higher~ Less than 10 │33,960 │ ┃
┃10 or higher~ Less than 20 │63,320 │ ┃
┃20 or more~ Less than 30 │77,850 │ ┃
┃30 or more~ Less than 50 │93,540 │ ┃
┃50 or more~ Less than 100 │108,480 │ ┃
┃100 or more~ Less than 200 │123,360 │ ┃
┃200 or more~ Less than 300 │140,120 │ ┃
┃300 or more~ Less than 500 │167,860 │ ┃
┃500 or more~ Less than 1,000 │216,800 │ ┃
┃1,000 or more~ Less than 2,000 │256,000 │ ┃
┃2,000 or more~ Less than 5,000 │285,180 │ ┃
┃5,000 or more ~ less than 10,000 │377,720 │ ┃
┃ 10,000 or more │377,720 │ ┃
┃ │Add 37 for every START. │ ┃
┗━━━━━━━━━━━┷━━━━━━━━━━━━┷━━━━━━━━━━━┛