Annex 3 — 석유광산안전규칙

278739 · 2025-10-01

■ Petroleum Mine Safety Regulations [Appendix 3] <Amended Jan. 21, 2022> Pressure test of blowout prevention device of onshore drilling rig (related to Article 58, Paragraph 2) 1. Initial Testing (Before drilling operations and installation of onshore drilling rigs) ┌───────────────┬────────────────────┐ │Pressure Test Requirements │Test Pressure │ │ ├────────┬───────────┤ │ │Low Pressure │High pressure │ ├───────────────┼────────┼───────────┤ │a. Rotating Head │200-300psi │(if necessary) │ ├───────────────┼────────┼───────────┤ │or. Diverter │Minimum 200-300psi │if necessary │ ├───────────────┼────────┼───────────┤ │. Enuller Preventer │200-300psi │Minimum 70% of operating pressure │ ├───────────────┼────────┼───────────┤ │. RAM Preventer │ │ │ │ 1) Fixed RAM │200-300psi │Operating pressure of ram │ │ 2) Variable RAM │200-300psi │Operating pressure of ram │ │ 3) Cutting Ram │200-300psi │Operating pressure of ram │ ├───────────────┼────────┼───────────┤ │E. Choke line (pressure tank inside the well │200-300psi │Operating pressure of ram │ │for gas, crude oil, muddy water │ │ │ │(passage for discharging etc.)? Valve │ │ │ ├───────────────┼────────┼───────────┤ │bar. Kill line (high-pressure gas ejection room │200-300psi │Operating pressure of ram │ │Water for paper and pressure neutralization │ │ │ │Muddy water injection pipe)?Valve │ │ │ ├───────────────┼────────┼───────────┤ │Company. Choke Manifold │ │ │ │ 1) Upstream │200-300psi │Operating pressure of ram │ │ 2) Downstream │200-300psi │if necessary │ ├───────────────┼────────┼───────────┤ │A. Explosion-proof control device │ │ │ │ 1) Manifold? Explosion-proof line │- │Minimum 3000psi │ │ 2) Accumulator │Pre-charge Confirm │- │ │ 3) Closing time │Performance Test │- │ │ 4) Pump capacity │Performance Test │- │ ├───────────────┼────────┼───────────┤ │. Safety valve │ │ │ │ -Kelly, Kelly Valve, Safety Valve │200-300psi │Operating pressure of components │ ├───────────────┼────────┼───────────┤ │Vehicle. Other Equipment │ │ │ │ 1) Muddy water? Gas separator │Flow Test │- │ │ 2) Trip Tank │Flow test │- │ └───────────────┴────────┴───────────┘ <Test Method> a) Low or high pressure tests must be stabilized without pressure change for at least 5 minutes. b) Equipment for pressure control shall test at a pressure higher than the required subsurface pressure must be performed. ) Pressure is applied by converting 0.070307 kg/㎠ to 1 psi. 2. Testing during the work period ┏━━━━━━━━━━━━━━┯━━━━━━━━━━━━━━━━━━━━━┓ ┃Pressure Test Requirements │Test Pressure ┃ ┃ ├──────┬──────────────┨ ┃ │Low Pressure │High pressure ┃ ┠──────────────┼──────┼──────────────┨ ┃a. Rotating Head │- │(if necessary) ┃ ┠──────────────┼──────┼──────────────┨ ┃or. Diverter │(if necessary) │(if necessary) ┃ ┠──────────────┼──────┼──────────────┨ ┃. Enuller Preventer │200-300psi │Minimum 70% of operating pressure ┃ ┠──────────────┼──────┼──────────────┨ ┃. RAM Preventer │ │ ┃ ┃ 1) Fixed RAM │200-300psi │Maximum ground closure pressure or higher ┃ ┃ 2) Variable RAM │200-300psi │Maximum ground closure pressure or higher ┃ ┃ 3) Cutting Ram │200-300psi │Maximum ground closure pressure or higher ┃ ┃ 4) Before casing installation │(if necessary) │(if necessary) ┃ ┠──────────────┼──────┼──────────────┨ ┃E. Choke Line? Valve │200-300psi │Maximum ground closure pressure or higher ┃ ┠──────────────┼──────┼──────────────┨ ┃Bar. Kill line? Valve │200-300psi │Maximum ground closure pressure or higher ┃ ┠──────────────┼──────┼──────────────┨ ┃Company. Choke Manifold │ │ ┃ ┃ 1) Upstream │200-300psi │Maximum ground closure pressure or higher ┃ ┃ 2) Downstream │200-300psi │if necessary ┃ ┠──────────────┼──────┼──────────────┨ ┃A. Explosion-proof control device │ │ ┃ ┃ 1) Manifold? Explosion-proof line │- │if necessary ┃ ┃ 2) Accumulator │Pre-charge Confirm│- ┃ ┃ 3) Closing time │Performance Test │- ┃ ┃ 4) Pump capacity │Performance Test │- ┃ ┠──────────────┼──────┼──────────────┨ ┃. Safety valve │ │ ┃ ┃ -Kelly, Kelly Valve, Safety Valve │200-300psi │Maximum ground closure pressure or higher ┃ ┠──────────────┼──────┼──────────────┨ ┃Vehicle. Other Equipment │ │ ┃ ┃ 1) Muddy water? Gas separator │Flow Test │- ┃ ┃ 2) Trip Tank │Flow test │- ┃ ┗━━━━━━━━━━━━━━┷━━━━━━┷━━━━━━━━━━━━━━┛ <Test Method> a) Low or high pressure tests must be stabilized without pressure change for at least 5 minutes. b) The work period shall not exceed 21 days. ) Pressure is applied by converting 0.070307 kg/㎠ to 1 psi.