Annex 4 — 산업안전보건기준에 관한 규칙

273603 · 2025-09-01

■ Rules on Industrial Safety and Health Standards [Appendix 4] <Amended Sep. 1, 2025> Contents of Preliminary Investigation and Work Plan (Related to Article 38, Paragraph 1) ┌───────────┬────────────┬───────────────────┐ │Task name │Preliminary Survey Content │Work Plan Contents │ ├───────────┼────────────┼───────────────────┤ │1. Installing a tower crane ·│- │A. Types and Models of Tower Cranes │ │Assembly and disassembly work │ │B. Installation, Assembly, and Disassembly Sequence │ │ │ │. Work tools, equipment, and temporary facilities (假設設 │ │ │ │Equipment) and protective equipment │ │ │ │d. Composition of work personnel and of work workers │ │ │ │Role Scope │ │ │ │E. Support method pursuant to Article 142 │ ├───────────┼────────────┼───────────────────┤ │2. Vehicle-mounted material handling machinery│- │a. Falls, drops, and all related to the work │ │etc. │ │Prevention of risks such as passage, stenosis, and collapse │ │ │ │book │ │ │ │b. Operation of vehicle-mounted loading and unloading machinery, etc. │ │ │ │and working method │ ├───────────┼────────────┼───────────────────┤ │3. Vehicle-type construction machinery │The rolling off of the corresponding machine │a. Types of vehicle-mounted construction machinery used │ │Task used │load, ground collapse, etc. │and Performance │ │ │risk to workers caused by │B. Operating route of vehicle-mounted construction machinery │ │ │To prevent the relevant work │. Work method using vehicle-mounted construction machinery │ │ │Topography and ground of the workplace │ │ │ │State │ │ ├───────────┼────────────┼───────────────────┤ │4. Chemical Plants and Accessories │- │a. Operation of valves, cocks, etc. (relevant chemical equipment │ │Equipment Usage Operation │ │or the relevant chemical plant │ │ │ │Only when removing products, etc. from the rain │ │ │ │is treated) │ │ │ │B. Cooling device, heating device, stirring device (攪 │ │ │ │Operation of mixing device) and compression device │ │ │ │. Monitoring and coordination of measuring and control devices │ │ │ │jeong │ │ │ │d. Safety valves, emergency shut-off devices, and other │ │ │ │Adjustment of protective devices and automatic alarm devices │ │ │ │E. Cover plate, flange, valve, cock │ │ │ │Leakage of hazardous materials, etc. at joints such as │ │ │ │Check for START status │ │ │ │B. Collection of samples │ │ │ │Company. In chemical facilities, the operation is temporary │ │ │ │or operation in case of partial interruption │ │ │ │MTQ11865c92afcde59a00741Start method or method of operation when resuming operation │ │ │ │Act │ │ │ │A. Emergency procedures in case of abnormal condition │ │ │ │value │ │ │ │J. Measures in Case of Hazardous Material Leakage │ │ │ │Vehicle. In addition, to prevent explosions and fires │ │ │ │and take necessary actions │ ├───────────┼────────────┼───────────────────┤ │5. Electricity pursuant to Article 318│- │A. Purpose and Content of Electrical Work │ │WORK │ │B. Qualifications and Appropriateness of Electrical Workers │ │ │ │persons │ │ │ │. Work scope, appointment of work manager, sudden │ │ │ │· Arc flash · Arc explosion, etc. Electricity │ │ │ │Identify risk factors, approach limit distance, │ │ │ │Live line approach alarm device for carrying, etc. during work │ │ │ │Requirements before starting │ │ │ │d. Regarding circuit interruption pursuant to Article 319 │ │ │ │Work Planning and Power Restoration Procedure │ │ │ │Safety work required for work situations such as vehicles │ │ │ │Business Tips │ │ │ │E. Insulating protective equipment and safety equipment, live-line work │ │ │ │Preparation and Inspection of Industrial Equipment, Devices, etc. │ │ │ │Matters concerning wearing, use, etc. │ │ │ │B. Temporary operation for inspection and trial run, │ │ │ │Matters concerning work suspension, etc. │ │ │ │Company. Regarding the handover of duties during shift work │ │ │ │관한 사항 │ │ │ │A. Relationship with the electrical work site Worker │ │ │ │Regarding the prohibition of entry by non-authorized persons │ │ │ │Matters │ │ │ │. The electrical safety work plan for the relevant worker │ │ │ │Methods to educate the person and work │ │ │ │Evaluation of the completed electrical safety work plan · │ │ │ │ManagementPlan │ │ │ │Vehicle. Electrical drawings, equipment details, etc. │ │ │ │Materials related to startups │ ├───────────┼────────────┼───────────────────┤ │6. Excavation work │A. Form, Geology and Stratigraphy │A. Excavation method and sequence, method of removing soil, etc.│ │ │Status of START │B. Plan for Required Personnel and Equipment Usage │ │ │B. Cracks · Water Consumption │. Relocation and protection measures for buried structures, etc. │ │ │· Use of water and freezing │d. Contact and signaling methods within the workplace │ │ │No or state │E. Installation Method and Measurement System for Earth Retaining Supports │ │ │. Presence or absence of buried structures, etc. │Stroke │ │ │or status │B. Deployment Plan for Work Supervisors │ │ │a. Above the groundwater level of the ground │Company. Other matters related to safety and health │ │ │태 │ │ ├───────────┼────────────┼───────────────────┤ │7. Tunnel Excavation Work │Boring and other appropriate │a. Method of excavation │ │ │method │B. Construction of tunnel support and lining │ │ │(Water Outflow) and Gas Explosion, etc. │Method and method for treating spring water │ │ │worker's stomach due to │. When installing ventilation or lighting facilities │ │ │experiment │is that method │ │ │Pre-terrain, geology and geo │ │ │ │Investigate layer condition │ │ ├───────────┼────────────┼───────────────────┤ │ 8. Bridge Work │- │a. Method of operation and sequence │ │ │ │b. Falling, overturning, or collapse of a member │ │ │ │Method for preventing mass formation │ │ │ │. The fall of a worker engaged in work │ │ │ │Safety measures to prevent accidents │ │ │ │d. Temporary steel structures, etc. used in construction │ │ │ │Safety inspection during installation, use, and dismantling of START │ │ │ │Saturation Method │ │ │ │E. Type and performance of machinery, etc. used, │ │ │ │Work Method │ │ │ │B. Work Supervisor Deployment Plan │ │ │ │d. Other matters related to safety and health │ ├───────────┼────────────┼───────────────────┤ │9. Quarrying │Ground Collapse · Excavation Machinery │A. Distinction between open-pit excavation and underground excavation and [unclear text] │ │ │due to falling, etc. │Analysis Method │ │ │occurring to a worker │B. Height and slope of the excavation face │ │ │To prevent risks │. Excavation surface berm (小段: slope of the embankment │ │ │Topography of the relevant workplace· │To ease, a narrow width in the middle │ │ │Geology and conditions of strata │and │ │ │ │Area │ │ │ │d. Method for preventing rockfalls and collapses in mines │ │ │ │E. Blasting Method │ │ │ │B. Method of dividing rocks │ │ │ │Company. Rock processing site │ │ │ │A. Excavating machinery, splitting machinery, and loading machines used │ │ │ │Retrieving machine or conveying machine (hereinafter "excavator │ │ │ │Types and performance of (referred to as "systems, etc.") │ │ │ │J. Method for loading and transporting soil or rocks │ │ │ │and transport route │ │ │ │D. Method for treating topsoil or groundwater │ ├───────────┼────────────┼───────────────────┤ │10. Demolition work of structures, etc. │Structure of demolished buildings, etc., main │A. Method of dismantling and dismantling sequence diagram │ │UP │Change situation etc. │B. Temporary facilities, protective facilities, ventilation facilities and │ │ │ │Method for sprinkler and fire prevention equipment, etc. │ │ │ │. Contact methods within the workplace │ │ │ │d. Plan for the disposal of demolished materials │ │ │ │E. Operation of machinery, equipment, etc. for dismantling work │ │ │ │Plan │ │ │ │B. Plan for the use of explosives, etc. for dismantling work │ │ │ │TO │ │ │ │Inc. Other matters related to safety and health │ ├───────────┼────────────┼───────────────────┤ │11. Handling of Heavy Objects│- │a. Safety harness capable of preventing fall │ │ │ │book │ │ │ │or. A safety harness capable of preventing the risk of falling │ │ │ │book │ │ │ │It is a safety harness that can prevent the risk of tipping over. │ │ │ │book │ │ │ │. A safety harness capable of preventing the risk of pinching │ │ │ │book │ │ │ │E. Safety belt capable of preventing collapse risk │ │ │ │book │ ├───────────┼────────────┼───────────────────┤ │12. Tracks and other tubes │- │a. Appropriate workforce │ │Maintenance and Inspection of Related Facilities │ │B.Workload │ │Task │ │. Work sequence │ │13. Shunting Operation(入換作 │ │d. Safety regarding work methods and risk factors │ │業) │ │Method of Action etc. │ └───────────┴────────────┴───────────────────┘