Annex 4 — 산업안전보건기준에 관한 규칙
273603 · 2025-09-01
■ Rules on Industrial Safety and Health Standards [Appendix 4] <Amended Sep. 1, 2025>
Contents of Preliminary Investigation and Work Plan (Related to Article 38, Paragraph 1)
┌───────────┬────────────┬───────────────────┐
│Task name │Preliminary Survey Content │Work Plan Contents │
├───────────┼────────────┼───────────────────┤
│1. Installing a tower crane ·│- │A. Types and Models of Tower Cranes │
│Assembly and disassembly work │ │B. Installation, Assembly, and Disassembly Sequence │
│ │ │. Work tools, equipment, and temporary facilities (假設設 │
│ │ │Equipment) and protective equipment │
│ │ │d. Composition of work personnel and of work workers │
│ │ │Role Scope │
│ │ │E. Support method pursuant to Article 142 │
├───────────┼────────────┼───────────────────┤
│2. Vehicle-mounted material handling machinery│- │a. Falls, drops, and all related to the work │
│etc. │ │Prevention of risks such as passage, stenosis, and collapse │
│ │ │book │
│ │ │b. Operation of vehicle-mounted loading and unloading machinery, etc. │
│ │ │and working method │
├───────────┼────────────┼───────────────────┤
│3. Vehicle-type construction machinery │The rolling off of the corresponding machine │a. Types of vehicle-mounted construction machinery used │
│Task used │load, ground collapse, etc. │and Performance │
│ │risk to workers caused by │B. Operating route of vehicle-mounted construction machinery │
│ │To prevent the relevant work │. Work method using vehicle-mounted construction machinery │
│ │Topography and ground of the workplace │ │
│ │State │ │
├───────────┼────────────┼───────────────────┤
│4. Chemical Plants and Accessories │- │a. Operation of valves, cocks, etc. (relevant chemical equipment │
│Equipment Usage Operation │ │or the relevant chemical plant │
│ │ │Only when removing products, etc. from the rain │
│ │ │is treated) │
│ │ │B. Cooling device, heating device, stirring device (攪 │
│ │ │Operation of mixing device) and compression device │
│ │ │. Monitoring and coordination of measuring and control devices │
│ │ │jeong │
│ │ │d. Safety valves, emergency shut-off devices, and other │
│ │ │Adjustment of protective devices and automatic alarm devices │
│ │ │E. Cover plate, flange, valve, cock │
│ │ │Leakage of hazardous materials, etc. at joints such as │
│ │ │Check for START status │
│ │ │B. Collection of samples │
│ │ │Company. In chemical facilities, the operation is temporary │
│ │ │or operation in case of partial interruption │
│ │ │MTQ11865c92afcde59a00741Start method or method of operation when resuming operation │
│ │ │Act │
│ │ │A. Emergency procedures in case of abnormal condition │
│ │ │value │
│ │ │J. Measures in Case of Hazardous Material Leakage │
│ │ │Vehicle. In addition, to prevent explosions and fires │
│ │ │and take necessary actions │
├───────────┼────────────┼───────────────────┤
│5. Electricity pursuant to Article 318│- │A. Purpose and Content of Electrical Work │
│WORK │ │B. Qualifications and Appropriateness of Electrical Workers │
│ │ │persons │
│ │ │. Work scope, appointment of work manager, sudden │
│ │ │· Arc flash · Arc explosion, etc. Electricity │
│ │ │Identify risk factors, approach limit distance, │
│ │ │Live line approach alarm device for carrying, etc. during work │
│ │ │Requirements before starting │
│ │ │d. Regarding circuit interruption pursuant to Article 319 │
│ │ │Work Planning and Power Restoration Procedure │
│ │ │Safety work required for work situations such as vehicles │
│ │ │Business Tips │
│ │ │E. Insulating protective equipment and safety equipment, live-line work │
│ │ │Preparation and Inspection of Industrial Equipment, Devices, etc. │
│ │ │Matters concerning wearing, use, etc. │
│ │ │B. Temporary operation for inspection and trial run, │
│ │ │Matters concerning work suspension, etc. │
│ │ │Company. Regarding the handover of duties during shift work │
│ │ │관한 사항 │
│ │ │A. Relationship with the electrical work site Worker │
│ │ │Regarding the prohibition of entry by non-authorized persons │
│ │ │Matters │
│ │ │. The electrical safety work plan for the relevant worker │
│ │ │Methods to educate the person and work │
│ │ │Evaluation of the completed electrical safety work plan · │
│ │ │ManagementPlan │
│ │ │Vehicle. Electrical drawings, equipment details, etc. │
│ │ │Materials related to startups │
├───────────┼────────────┼───────────────────┤
│6. Excavation work │A. Form, Geology and Stratigraphy │A. Excavation method and sequence, method of removing soil, etc.│
│ │Status of START │B. Plan for Required Personnel and Equipment Usage │
│ │B. Cracks · Water Consumption │. Relocation and protection measures for buried structures, etc. │
│ │· Use of water and freezing │d. Contact and signaling methods within the workplace │
│ │No or state │E. Installation Method and Measurement System for Earth Retaining Supports │
│ │. Presence or absence of buried structures, etc. │Stroke │
│ │or status │B. Deployment Plan for Work Supervisors │
│ │a. Above the groundwater level of the ground │Company. Other matters related to safety and health │
│ │태 │ │
├───────────┼────────────┼───────────────────┤
│7. Tunnel Excavation Work │Boring and other appropriate │a. Method of excavation │
│ │method │B. Construction of tunnel support and lining │
│ │(Water Outflow) and Gas Explosion, etc. │Method and method for treating spring water │
│ │worker's stomach due to │. When installing ventilation or lighting facilities │
│ │experiment │is that method │
│ │Pre-terrain, geology and geo │ │
│ │Investigate layer condition │ │
├───────────┼────────────┼───────────────────┤
│ 8. Bridge Work │- │a. Method of operation and sequence │
│ │ │b. Falling, overturning, or collapse of a member │
│ │ │Method for preventing mass formation │
│ │ │. The fall of a worker engaged in work │
│ │ │Safety measures to prevent accidents │
│ │ │d. Temporary steel structures, etc. used in construction │
│ │ │Safety inspection during installation, use, and dismantling of START │
│ │ │Saturation Method │
│ │ │E. Type and performance of machinery, etc. used, │
│ │ │Work Method │
│ │ │B. Work Supervisor Deployment Plan │
│ │ │d. Other matters related to safety and health │
├───────────┼────────────┼───────────────────┤
│9. Quarrying │Ground Collapse · Excavation Machinery │A. Distinction between open-pit excavation and underground excavation and [unclear text] │
│ │due to falling, etc. │Analysis Method │
│ │occurring to a worker │B. Height and slope of the excavation face │
│ │To prevent risks │. Excavation surface berm (小段: slope of the embankment │
│ │Topography of the relevant workplace· │To ease, a narrow width in the middle │
│ │Geology and conditions of strata │and │
│ │ │Area │
│ │ │d. Method for preventing rockfalls and collapses in mines │
│ │ │E. Blasting Method │
│ │ │B. Method of dividing rocks │
│ │ │Company. Rock processing site │
│ │ │A. Excavating machinery, splitting machinery, and loading machines used │
│ │ │Retrieving machine or conveying machine (hereinafter "excavator │
│ │ │Types and performance of (referred to as "systems, etc.") │
│ │ │J. Method for loading and transporting soil or rocks │
│ │ │and transport route │
│ │ │D. Method for treating topsoil or groundwater │
├───────────┼────────────┼───────────────────┤
│10. Demolition work of structures, etc. │Structure of demolished buildings, etc., main │A. Method of dismantling and dismantling sequence diagram │
│UP │Change situation etc. │B. Temporary facilities, protective facilities, ventilation facilities and │
│ │ │Method for sprinkler and fire prevention equipment, etc. │
│ │ │. Contact methods within the workplace │
│ │ │d. Plan for the disposal of demolished materials │
│ │ │E. Operation of machinery, equipment, etc. for dismantling work │
│ │ │Plan │
│ │ │B. Plan for the use of explosives, etc. for dismantling work │
│ │ │TO │
│ │ │Inc. Other matters related to safety and health │
├───────────┼────────────┼───────────────────┤
│11. Handling of Heavy Objects│- │a. Safety harness capable of preventing fall │
│ │ │book │
│ │ │or. A safety harness capable of preventing the risk of falling │
│ │ │book │
│ │ │It is a safety harness that can prevent the risk of tipping over. │
│ │ │book │
│ │ │. A safety harness capable of preventing the risk of pinching │
│ │ │book │
│ │ │E. Safety belt capable of preventing collapse risk │
│ │ │book │
├───────────┼────────────┼───────────────────┤
│12. Tracks and other tubes │- │a. Appropriate workforce │
│Maintenance and Inspection of Related Facilities │ │B.Workload │
│Task │ │. Work sequence │
│13. Shunting Operation(入換作 │ │d. Safety regarding work methods and risk factors │
│業) │ │Method of Action etc. │
└───────────┴────────────┴───────────────────┘