Annex 1 — 도로와 다른 시설의 연결에 관한 규칙
235051 · 2021-08-27
■ Rules on the Connection of Roads and Other Facilities [Appendix 1] <Amended Aug. 3, 2021>
Guidelines for Preparing Design Drawings for Transmission Lanes, etc. (Related to Article 4, Paragraph 4)
┏━━━━┯━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━┓
┃DrawingName │Instructions for Writing ┃
┠────┼───────────────────────────────┨
┃Location Map │ Location of connected facilities on a topographic map with a scale of 1/50,000 (or 1/25,000) ┃
┃ │Display ┃
┠────┼───────────────────────────────┨
┃Plan │ Topography and features around the connection point shall be drawn at a scale of 1/1,200 or larger. However, ┃
┃ │Road Register or produced in accordance with the Basic Plan for the Establishment of a National Geographic Information System ┃
┃ │Base map(In order to obtain a permit for road occupancy pursuant to Article 61 of the Act, the occupied surface ┃
┃ │In cases where a specific calculation is required, regarding the "Establishment and Management of Spatial Information, etc. ┃
┃ │In cases where there is a continuous cadastral map pursuant to Article 2, Subparagraph 19-2 of the Act ┃
┃ │Write in conjunction with this (center line, pavement edge, shoulder of the connecting road ┃
┃ │line, road occupancy boundary line, road site boundary line, roadside zone line, 「road's ┃
┃ │Flow channeling facility pursuant to Article 32, Paragraph 3 of the "Rules on Structural and Facility Standards" ┃
┃ │(Fluid-guiding facility: a facility that facilitates the smooth flow of traffic), Taper, ┃
┃ │Indicate the location, etc., of auxiliary lanes, drainage facilities, median strips, and other facilities) ┃
┠────┼───────────────────────────────┨
┃Longitudinal Section│ Create at a scale of 1/1,200 or larger in the vertical direction and 1/100 or larger in the horizontal direction ┃
┃ │Measurement points shall be spaced 20 meters apart, provided that the ground surface elevation is abrupt ┃
┃ │Install changing points as additional measurement points] ┃
┠────┼───────────────────────────────┨
┃Cross-section│ Create at a scale of 1/100 or larger for each survey point (drainage facilities, median strips, road's ┃
┃ │Indicates centerlines, boundary lines of road plots and access zones, etc. ┃
┃ │The above is the part affected by connecting facilities on both sides of the construction plan width. ┃
┃ │MTQb6b8120555fc60ff00368Including START) ┃
┠────┼───────────────────────────────┨
┃Structural drawing│ Accurate dimensions to clearly identify the specifications and locations of various structures ┃
┃ │Created by marking as START ┃
┠────┼───────────────────────────────┨
┃Unit │ Ancillary facilities installed in connection with speed control lanes, etc. (protective facilities, road markings ┃
┃Construction │etc. ┃
┗━━━━┷━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━┛