Form 3 — 건축물의 피난ㆍ방화구조 등의 기준에 관한 규칙
279461 · 2025-10-31
■ Rules on Standards for Evacuation, Fire Protection, and Structures of Buildings [Attachment Form No. 3] <Amended Dec. 23, 2021>
Fire Door Quality Control Sheet
─────┬─────────────────────────────────────────────────────────────────────
Submitted by │Name(Corporate Name)
(Building Owner)├─────────────────────────────────────────────────────────────────────
│Address
│(Phone Number : )
─────┼─────────────────────────────────────────────────────────────────────
Construction Site│site name
├───────────────────────────┬─────────────────────────────────────────
│Location │No.
─────┼────┬──────────────────────┼───┬─────────────────────────────────────
Material │□ 60 min+│□ Capable of blocking smoke and flames │Product Name│Report Number (Quality Certification Number)
Overview │ │If the time is 60 minutes or more, and the heat │ │
│ │Time to block is 30 minutes or more │ │
├────┼──────────────────────┤ │
│□ 60 minutes │□ Capable of blocking smoke and flames │ │
│ │time is 60 minutes or more │ │
├────┼──────────────────────┤ │
│□ 30 minutes │The time to block smoke and flames is 30 □ │ │
│ │minutes or more, less than 60 minutes │ │
├────┼──────────────────────┼───┴─────────────────────────────────────
│Use │□ Special Evacuation Stairs □ Apartment Evacuation Space □ Other │Door Specifications (Width X Height X Thickness)
│ │ │ ㎜
─────┴────┴──────────────────────┴─────────────────────────────────────────
─────┬─────┬─────────────────────┬─────────────────────────────────────────
Material │Name │Date of Birth │□ Performance-equipped □ Quality-certified fire door 개
Manufacturer├─────┼─────────────────────┤□ Material Distributor □ Supplied to Construction Contractor
│Company Name │Corporate Registration Number │
├─────┴─────────────────────┤ Year month day
│Lot number │Affiliation Name (Signature or seal)
├───────────────────────────┤
│Address │
│(Phone Number : ) │
━━━━━┿━━━━━┯━━━━━━━━━━━━━━━━━━━━━┿━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
Material │Name │Date of Birth │□ Performance-equipped □ Quality-certified fire door open
Distributor├─────┼─────────────────────┤Delivered to construction contractor
│Company Name │Corporate Registration Number │
├─────┴─────────────────────┤ Year month day
│Lot number │Affiliation Name (Signature or seal)
├───────────────────────────┤
│Address │
│(Phone Number : ) │
─────┴───────────────────────────┴─────────────────────────────────────────
─────┬─────┬─────────────────────┬─────────────────────────────────────────
Construction │Name │Date of Birth │□ Performance-equipped □ Quality-certified fire door open
Contractor ├─────┼─────────────────────┤□ Manufacturer □ Acquired from distributor
│Company Name │Corporate Registration Number │ Year month day
├─────┴─────────────────────┤Affiliation Name (Signature or seal)
│Address │
│ │□ Equipped with performance □ Quality certified The fire door was properly installed
│ │ Year month day
│(Phone Number : ) │Affiliation Name (Signature or seal)
─────┴───────────────────────────┴─────────────────────────────────────────
─────┬─────┬─────────────────────┬─────────────────────────────────────────
Construction │Name │Qualification Number │□ Equipped with performance □ Quality certified Proper installation of fire doors
Supervisor ├─────┼─────────────────────┤was performed
│Office Name │ReportNumber │
├─────┴─────────────────────┤ Year month day
│Office Address │Affiliation Name (Signature or seal)
│(Phone Number : ) │
─────┴───────────────────────────┴─────────────────────────────────────────
Article 52-4 of the "Building Act," Article 62, Paragraph 1, Subparagraph 3 of the Enforcement Decree of the same Act and "Standards for Evacuation, Fire Protection, Structures, etc. of Buildings
In accordance with Article 24-3, Paragraph 2, Subparagraph 3 of the START Rules, I hereby submit the Quality Control Document as above.
Year month day
Submitter (Building Owner) (Signature or seal)
To the Mayor of a Special City, Metropolitan City, Special Self-Governing City, or Governor of a Special Self-Governing Province, and to the Mayor, County Head, or District Head
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
Remarks
───────────────────────────────────────────────────────────────────────────
1. Attached Documents: Copy of fire door test report indicating performance capable of blocking smoke, flames, and heat (Quality Certification if quality certification has been obtained pursuant to Article 52-5, Paragraph 1 of the Act)
2. The construction contractor and the construction supervisor must sign or affix their seal after verifying whether the attached test report or quality certification has been forged or altered.
3. The construction supervisor shall attach this form to the construction supervision completion report and submit it to the building owner, and When the building owner applies for approval of use pursuant to Article 22 of the Building Act
It must be submitted together with the Application for Approval of Use Form No. 17 of the Enforcement Rules of the Building Act.
4. If there are multiple delivery dates or installation completion dates for fire doors, complete this form for each.
───────────────────────────────────────────────────────────────────────────
210mm×297mm[White Paper 80g/㎡]