Form 1 — 건축물의 피난ㆍ방화구조 등의 기준에 관한 규칙
279461 · 2025-10-31
■ Rules on Standards for Evacuation, Fire Protection, and Structures of Buildings [Attachment Form No. 1] <Amended Dec. 23, 2021>
Composite Material Quality Control Sheet
─────┬───────────────────────────────────────────────────────────────────
Submitted by │site name
(Building Owner)├───────────────────────────────────────────────────────────────────
│Address (Phone Number : )
─────┼───────────────────────────────────────────────────────────────────
Construction Site│site name
├─────────────────────────────┬─────────────────────────────────────
│Location │No.
─────┼───────────────┬─────────────┼────────────┬────────────────────────
Material │Flame retardant performance of core material │□ Non-combustible □ Semi-non-combustible □ Flame-retardant │Test Report Issuing Authority │Report Number
Overview ├───────────────┼─────────────┼────────────┴────────────────────────
│Physical Model Test Results │□ Pass □ Fail │Quality Certification Number
├───────────────┼─────────────┼────────────┬────────────────────────
│Composite Material Composition │Steel plate thickness 0. mm │Quality Inspection Certificate Issuing Authority │Certificate Number
│(Example) Front and back 0.5mm thick a │Plating Type │ │
│Softened Steel Sheet + Semi-Noncombustible Glass Wool │Plating Amount g/㎡0 │ │
│100mm Core + Non-combustible Mineral Wool │Core material recognized thickness mm │ │
│50mm core │ │ │
─────┴───────────────┴─────────────┴────────────┴────────────────────────
─────┬───────────────┬─────────────┬─────────────────────────────────────
Composite Material│Name │Date of Birth │□ Composite material with performance □ quality certified ㎡
Manufacturer├───────────────┼─────────────┤□ Material Distributor □ Supplied to Construction Contractor
│Company Name │Corporate Registration Number │ Year month day
├───────────────┴─────────────┤Affiliation Name (Signature or seal)
│LotNumber │
├─────────────────────────────┤
│Address │
│(Phone Number : ) │
━━━━━┿━━━━━━━━━━━━━━━┯━━━━━━━━━━━━━┿━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
Material │Name │Date of Birth │□ Composite material with performance □ quality certified ㎡을 공사
Distributor├───────────────┼─────────────┤Delivered to contractor
│Company Name │Corporate Registration Number │ Year month day
├───────────────┴─────────────┤Affiliation Name (Signature or seal)
│LotNumber │
├─────────────────────────────┤
│Address │
│(Phone Number : ) │
─────┴─────────────────────────────┴─────────────────────────────────────
─────┬───────────────┬─────────────┬─────────────────────────────────────
Construction │Name │Date of Birth │□ Composite material with performance □ quality certified ㎡
Contractor ├───────────────┼─────────────┤□ Material Manufacturer □ Acquired from Material Distributor
│Company Name │Corporate Registration Number │ Year month day
├───────────────┴─────────────┤Affiliation Name (Signature or seal)
│Address │
│ │□ Composite materials with □ quality certification equipped with □ performance appropriately
│ │Construction completed
│(Phone Number : ) │ Year month day
│ │Affiliation Name (Signature or seal)
─────┴─────────────────────────────┴─────────────────────────────────────
─────┬───────────────┬─────────────┬─────────────────────────────────────
Construction │Name │QualificationNumber │□ Composite materials with □ quality certification equipped with □ performance appropriately
Supervisor ├───────────────┼─────────────┤Confirmed that construction has been completed
│OfficeName │ReportNumber │ Year month day
├───────────────┴─────────────┤Affiliation Name (Signature or seal)
│Office Address │
│(Phone Number : ) │
─────┴─────────────────────────────┴─────────────────────────────────────
Article 52-4 of the "Building Act," Article 62, Paragraph 1, Subparagraph 1 of the Enforcement Decree of the same Act and "Standards for Evacuation, Fire Protection, and Structures of Buildings
In accordance with Article 24-3, Paragraph 2, Subparagraph 1 of the START Rules, I hereby submit the Quality Control Document as above.
Year month day
Submitter (Building Owner) (Signature or seal)
To the Mayor of a Special City, Metropolitan City, Special Self-Governing City, or Governor of a Special Self-Governing Province, and to the Mayor, County Head, or District Head
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
(Rear)
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
Remarks
─────────────────────────────────────────────────────────────────────────
1. Attached Documents (If composed of two or more core materials, attach separately for each core material)
a. Copy of the test report for composite materials (limited to core materials) indicating flame-retardant performance (or the quality certification in cases where quality certification has been obtained pursuant to Article 52-5, Paragraph 1 of the Act)
b. Copy of the quality inspection certificate from the steel sheet manufacturer indicating the thickness, type of plating, and amount of plating applied to the steel sheet
. A copy of the composite material test report indicating the results of the physical model test (or the quality certification in cases where quality certification has been obtained pursuant to Article 52-5, Paragraph 1 of the Act
2. The construction contractor and the construction supervisor shall sign or affix their seal after verifying whether the attached test report or quality certification has been forged or altered.
3. The construction supervisor shall attach this form to the construction supervision completion report and submit it to the building owner, When the building owner applies for approval of use pursuant to Article 22 of the "Building Act," the "Building
It must be submitted together with the Application for Approval of Use Form No. 17 of the Enforcement Rules of the Construction Act.
4. If there are multiple delivery dates or construction completion dates for composite materials, etc., complete this form for each.
─────────────────────────────────────────────────────────────────────────
210mm×297mm[White Paper 80g/㎡]