Annex 4 — 건축물의 피난ㆍ방화구조 등의 기준에 관한 규칙
279461 · 2025-10-31
■ Rules on Standards for Evacuation, Fire Protection, and Structures of Buildings [Appendix 4] <Newly Added Dec. 23, 2021>
Quality Certification Fee for Construction Materials, etc. (Related to Article 24-8, Paragraph 2)
1. Quality Certification Application Fee
A. Composite materials, fire doors, and automatic fire shutters: The sum of the following amounts
1) Basic Cost: The sum of the following amounts
(1) The amount obtained by multiplying the special grade technician's wage rate by 8.7 and the advanced technician's wage rate
The amount multiplied by 16.2 and the amount multiplied by the intermediate technician's wage rate by 5.8, all
Total Amount
(2) Costs incurred for testing, inspection, etc., as determined and notified by the Minister of Land, Infrastructure and Transport
Liquid
2) Additional cost: Amount multiplied by 0.6
3) Business Trip Expenses: Amount in accordance with the travel expense regulations of the organization to which the traveler belongs
4) Consulting Fee: The amount obtained by multiplying the hourly wage of a top-tier technician by 5.2 and the wage of a senior technician
Both the amount obtained by multiplying the unit price by 20.8 and the amount obtained by multiplying the intermediate technician's wage unit price by 1.0
and
B. Fire-resistant structure and fire-resistant filling structure: The sum of the following amounts
1) Basic Cost: The sum of the following amounts
(1) The amount obtained by multiplying the special grade technician's wage rate by 9.0 and the advanced technician's wage rate
The amount multiplied by 23.2 and the amount multiplied by the intermediate technician's wage rate by 5.8, all
Total Amount
(2) Costs incurred for testing, inspection, etc., as determined and notified by the Minister of Land, Infrastructure and Transport
Liquid
2) Additional cost: Amount calculated by multiplying the basic cost by 0.6
3) Travel expenses: Expenses pursuant to Item 3)
4) Consulting fees: Costs pursuant to Item 4)
2. Fee for Application for Extension of Quality Certification Validity Period
a. Composite materials, fire doors, and automatic fire shutters: The sum of the following amounts
1) Basic Cost: The sum of the following amounts
(1) The amount obtained by multiplying the special grade technician's wage rate by 6.2 and the advanced technician's wage rate
The amount multiplied by 11.3 and the amount multiplied by the intermediate technician's wage rate by 5.8, all
Total Amount
(2) Costs incurred for testing, inspection, etc., as determined and notified by the Minister of Land, Infrastructure and Transport
Liquid
2) Additional cost: Amount multiplied by 0.6
3) Travel expenses: Expenses pursuant to Item 1(a)(3)
4) Consulting fees: Costs pursuant to Item 1(a)(4)
B. Fire-resistant structure and fire-resistant filling structure: The sum of the following amounts
1) Basic Cost: The sum of the following amounts
(1) The amount obtained by multiplying the special grade technician's wage rate by 7.2 and the advanced technician's wage rate
The amount multiplied by 15.0 and the amount multiplied by the intermediate technician's wage rate of 5.8, all
Total Amount
(2) Costs incurred for testing, inspection, etc., as determined and notified by the Minister of Land, Infrastructure and Transport
Liquid
2) Additional cost: Amount multiplied by 0.6
3) Travel expenses: Expenses pursuant to Item 1(a)(3)
4) Consulting fees: Costs pursuant to Item 1(a)(4)
Remarks
1. Wage unit prices are surveyed by the Korea Engineering Promotion Association pursuant to Article 27, Paragraph 1 of the Statistics Act.
It refers to the amount obtained by dividing the published wage rate by 8 hours.
2. Additional costs are for two or more construction materials, etc. of quality certification or the validity period of quality certification
When applying for an extension, the calculation is performed starting from the second building materials, etc., and is added up.
3. Consulting costs are aggregated only when consultation with external experts is received during the quality accreditation process.