Form 1 — 건축물의 설비기준 등에 관한 규칙
279459 · 2025-10-31
■ Rules on Standards for Building Facilities, etc. [Attachment Form No. 1] <Amended May 2, 2017>
Confirmation of Building Equipment Installation
───┬────┬───┬──────────────────────────────
1. │Buildings │Location│
General│open 요 ├───┼──────┬────┬───┬─────────┬────
Matters│ │For 도│ │Gross Floor Area │ │floor 수 │
├────┼───┼──────┼────┼───┴─────────┴────
│Contractor │STAST Name│ │LicenseNumber│
│ ├───┼──────┼────┼──────────────────
│ │STOP 호│ │State SO │
───┴────┴───┴──────┴────┴──────────────────
───┬────────┬────────────────────────┬─────
2. │old minute │Confirmation Opinion │CheckDate
Confirm├────────┼────────────────────────┼─────
Matters│Water Supply & Hot Water Supply Equipment │ │
├────────┼────────────────────────┼─────
│Drainage & Ventilation Equipment │ │
├────────┼────────────────────────┼─────
│Piping Installation (Water Supply & Drainage)│ │
├────────┼────────────────────────┼─────
│Sanitary Fixtures │ │
├────────┼────────────────────────┼─────
│Heat Source Equipment │ │
├────────┼────────────────────────┼─────
│Air Conditioning Equipment Installation│ │
├────────┼────────────────────────┼─────
│Duct Installation │ │
├────────┼────────────────────────┼─────
│Piping Installation (Air Conditioning)│ │
├────────┼────────────────────────┼─────
│Cooling Equipment │ │
├────────┼────────────────────────┼─────
│Heating Equipment │ │
├────────┼────────────────────────┼─────
│Piping System (Heating & Cooling)│ │
├────────┼────────────────────────┼─────
│GasEquipment │ │
├────────┼────────────────────────┼─────
│Firefighting and Smoke Exhaust Equipment│ │
├────────┼────────────────────────┼─────
│Waste Treatment Equipment │ │
├────────┼────────────────────────┼─────
│Elevator (Mechanical Division)│ │
├────────┼────────────────────────┼─────
│Elevator (Electrical Division)│ │
├────────┼────────────────────────┼─────
│ElectricalEquipment │ │
├────────┼────────────────────────┼─────
│Lightning rod installation │ │
├────────┼────────────────────────┼─────
│Other Details │ │
───┴────────┴────────────────────────┴─────
I confirm that construction has been carried out as stated above in accordance with Article 3, Paragraph 2 of the "Rules on Standards for Building Facilities, etc." (However, Professional Engineer
Verification is limited to cases where related equipment is installed)
Year month day
Verified by: Professional Engineer in Architectural Electrical Installations (in) Qualification Number :
Power Transmission & Distribution Professional Engineer (in) Qualification Number :
Professional Engineer in Architectural Mechanical Equipment (in) Qualification Number :
Professional Engineer in Air Conditioning and Refrigeration (in) Qualification Number :
GasProfessionalEngineer (in) Qualification Number :
Building Owner ㆍ Construction Supervisor Your
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
210㎜×297㎜[(Newspaper (54g/㎡)]