Annex 6 — 항만법 시행령
287353 · 2026-07-01
■ Enforcement Decree of the Port Act [Appendix 6] <Amended Dec. 29, 2020>
Timing of implementation of regular safety inspections, detailed safety inspections, and emergency safety inspections, etc. (related to Article 41, Paragraph 1)
1. Regular Safety Inspection
a. Port facilities (referring to port facilities pursuant to Article 38, Paragraph 1, Subparagraph 2 of the Act. Hereinafter the same in this table
) Date of completion or date of approval for use (changes in structure and form of facilities other than port facilities
, the completion date or use date resulting from changes in structure and form
refers to the approval date, and in the case of temporary use approval, refers to the temporary use approval date.
(The following are the same) within 1 year from
b. At least once a year from the date of the first regular safety inspection pursuant to subparagraph a. However, typhoons or...
The timing of regular safety inspections for port facilities in areas heavily affected by strong winds is management
It may be adjusted at least once per half-year as determined by the Agency.
2. Emergency Safety Inspection: Due to any of the following reasons, the managing authority [inspects] port facilities
In cases where an emergency safety inspection is deemed necessary
a. In the case where the function and performance of port facilities have significantly deteriorated due to a natural disaster
b. In the event of damage such as collapse, subsidence, or loss of port facilities
. The head of the relevant central administrative agency requested the implementation of an emergency safety inspection of port facilities
case
3. Precision Safety Inspection
a. As a result of conducting regular safety inspections or emergency safety inspections, the maintenance of port facility functions and safety
It is deemed that urgent repairs to port facilities are required due to concerns about the risk of electric shock
In cases where the Li-Cheong judges it, or among the basic facilities pursuant to Article 2, Paragraph 5, Subparagraph (a) of the Act, shipping lanes, anchoring
underwater in connection with waterway facilities such as mooring areas, small vessel anchorages, and turning basins
The management authority [stated] that the safe navigation and anchoring of vessels are hindered due to obstacles, etc.
When determining
b. In cases other than subparagraph (a), for the following port facilities, the timing according to the following classification
1) Breakwaters, wave breakers, quay walls (special structural types using sheet piles or steel pipe piles, etc.
Limited to those), dolphin (special structural type using sheet piles or steel pipe piles, etc.
Limited to those), small vessel docks (special structures using sheet piles or steel pipe piles, etc.
type) and other mooring facilities among passenger use facilities
a) Initial detailed safety inspection: 6 years from the date of completion or approval for use of the relevant port facility
My
b) Regular precision safety inspection: At least once every 6 years from the date of the first precision safety inspection
2) Breakwater, seawall, diversion channel, revetment, road, bridge, railway, track, canal, quay (sheet pile or
excludes special structural types using steel pipe piles, etc.), small vessel dock (plank
(excluding special structural forms using piles or steel pipe piles, etc.), piers, floating piers
Bridge, Pier
a) Initial detailed safety inspection: 10 years from the date of completion or approval for use of the relevant port facility
Within
b) Regular precision safety inspection: At least once every 10 years from the date of the first precision safety inspection
4. Notwithstanding the provisions of Subparagraphs 1 through 3, the expansion, alteration, and remodeling of port facilities
, port facilities scheduled for demolition, and other unused
For port facilities that are not [mandatory], the owner of the relevant port facility shall consult with the administrative authority and [mandatory] a regular [mandatory]
The implementation of pre-inspections, detailed safety inspections, and emergency safety inspections may be omitted or their timing adjusted.
.