Annex 6 — 하수도법 시행령

286151 · 2026-06-03

■ Enforcement Decree of the Sewerage Act [Appendix 6] Subjects of Material and Performance Inspection (Related to Article 32, Paragraph 2) ┏━━━━━━┯━━━━━━━━━━━━━━━━┯━━━━━━━━━━━━━┓ ┃Section │MaterialInspectionTarget │PerformanceTestTarget ┃ ┠──────┼────────────────┼─────────────┨ ┃Wastewater Treatment Facility│Treatment of the wastewater treatment facility to be manufactured │of the wastewater treatment facility to be manufactured ┃ ┃ │Method, specifications, manufacturing method of the main body and │Treatment method, treatment capacity, specifications ┃ ┃ │Materials by Processing Capacity │and processing efficiency ┃ ┠──────┼────────────────┼─────────────┨ ┃Septic Tank │Treatment method for septic tank to be manufactured, specifications│ ┃ ┃ │type, method of manufacturing the main body and target for processing │ ┃ ┃ │Materials by Personnel │ ┃ ┗━━━━━━┷━━━━━━━━━━━━━━━━┷━━━━━━━━━━━━━┛ Remarks : 1. In cases where the specifications of a wastewater treatment facility or septic tank that has undergone material inspection are changed, Treatment method, treatment capacity, manufacturing method, and diameter and height of the main body of the structure are identical The above is excluded from material inspection. 2. In cases where the specifications of a wastewater treatment facility that has undergone performance inspection are changed, the treatment method, treatment In cases where the capacity and processing efficiency are the same and only the total effective capacity increases, in writing .