Annex 1 — 하수도법 시행령

286151 · 2026-06-03

■ Enforcement Decree of the Sewerage Act [Table 1-6] <Amended Oct. 1, 2025> Installation Standards for Private Wastewater Treatment Facilities (Related to Article 24, Paragraph 3) 1. The scale of the private sewage treatment facility must be at least capable of treating all target wastewater must be. 2. Septic tanks shall have a structure prescribed by the Ordinance of the Ministry of Climate, Energy and Environment pursuant to Article 52, Paragraph 3 of the Act, and Must meet standard criteria. 3. If the top of the facility is sealed, a lid (in the case of wastewater treatment facilities, a diameter of 60cm or more; in the case of septic tanks, for those subject to treatment, 45cm or more for 10 people or less, and Install 50cm or more (55cm or more for 30 people or less, and 60cm or more for 31 people or more) , however, the lid must be airtight, and a locking device must be installed or a grid-type It must be installed safely, such as by installing wire mesh, etc. 3-2. In cases where the cover of the facility is exposed in an area accessible to pedestrians or vehicles is painted to distinguish it from the surroundings, and on the top of the lid, pedestrians and vehicles . 4. Facilities must be structurally stable, and ceilings, floors, and walls must be waterproof. 5. The facilities shall not be corroded or deformed. 6. The facility shall be equipped with an exhaust device capable of discharging generated gas, provided that the exhaust device It shall be constructed in a way that prevents foreign substances from entering, and insect screens must be installed. 7. The wastewater treatment facility can evenly distribute the inflow over 24 hours and retain for more than 12 hours (貯 A flow equalization tank capable of (retaining) must be installed. However, provided that the daily treatment capacity is 100 years In cases where the area is 1 square meter or more, install a flow equalization tank capable of storing water for 10 hours or more. must. 7-2. The wastewater treatment facility includes a sedimentation separation tank with a capacity capable of holding water for 8 hours or more (沈澱分離 組) must be divided into two or more rooms and installed in series. However, the If the daily processing capacity is 50 cubic meters or more, to sedimentation and screening facilities It can replace the sedimentation separation tank. 7-3. For Biochemical Oxygen Demand (BOD) of Biological Reactors in Wastewater Treatment Facilities The appropriate load shall be 0.3 kg/m3·day or less. 8. Facilities capable of preventing odors shall be installed in the facilities. However, sewage treatment Zone (applicable only to areas with combined sewer systems) with a daily treatment capacity of 200 Septic tanks with more than [number] people (Article 23464 of the Addendum to the Partial Amendment to the Enforcement Decree of the Sewerage Act In accordance with Article 2, among septic tanks with a daily treatment capacity of 1,000 people or more, odor removal facilities In the case of a septic tank not equipped with drainage facilities [discharge tank and including septic tanks not equipped with refers to the drainage tank], air supply devices, etc., malodorous substances dissolved in water Additional facilities for removal must be installed. 9. Facilities where noise and vibration generated by machinery do not interfere with the living environment level. 10. Sewage piping must be structured to prevent blockage, backflow, and leakage. 11. The facility must be structured to allow for the collection of samples for effluent water quality testing . 12. In cases where facilities are manufactured or installed using materials other than concrete, the requirements of each of the following items must satisfy the condition. a. Considering the ground and the load on the upper part of the facility, the facility may sink or deform Foundation work for the floor must be carried out with concrete so that it is not damaged, and In cases where reinforcement of the facility is required due to loads on the top or sides of the facility is made of concrete material and includes slabs and protective walls, etc. on the upper or side of the relevant facility must be installed. a. When manufacturing facilities in a circular shape, the facilities must be able to maintain a horizontal position. . 13. The amount of wastewater generated will significantly decrease for a certain period during the operation of the private wastewater treatment facility is expected, the wastewater In order to ensure that private wastewater treatment facilities can be properly operated even during periods of low occurrence, Must deteriorate. 14. The Mayor of a Special Self-Governing City, the Governor of a Special Self-Governing Province, a Mayor, a County Head, or a District Head [does not include] Items 1 through 13 In addition to the matters stipulated in the START, the design and construction of private sewage treatment facilities, installation of ancillary equipment, etc. Detailed matters necessary for the standards may be determined and announced.