Form 20 — 건설기계관리법 시행규칙

285023 · 2026-03-24

■ Enforcement Rules of the Construction Machinery Management Act [Attachment Form No. 20] <Amended Aug. 5, 2025> Construction Machinery □ New Registration Inspection □ Structural Modification Inspection Application □ Periodic Inspection □ Unscheduled Inspection (front) ───────┬─────────────────┬─────────────────────────── Receipt Number │Date of Receipt │Processing Period 15days ───────┴─────────────────┴─────────────────────────── ────┬───────────────────┬──────────────────────────── Applicant│Name (for corporations, trade name and representative) │Date of Birth (Business or Alien Registration Number) ├───────────────────┴──────────────────────────── │Address │(Phone Number: ) ────┴──────────────────────────────────────────────── ───────────────────────┬───────────────────────────── Construction Machinery Name │Registration number ───────────────────────┼───────────────────────────── Construction Machinery Specifications and Models │Chassis Serial Number ───────────────────────┼───────────────────────────── Date for inspection │ScheduledInspectionSite ───────────────────────┴───────────────────────────── ExpirationDate . . . ~ . . . ───────────────────────────────────────────────────── ────────────────┬──────┬────┬────────┬─────────────── Structural Modification Details │Classification │Before change │after change │change date (To be entered only when applying for structural modification inspection)├──────┼────┼────────┼─────────────── │ │ │ │ ────────────────┴──────┴────┴────────┴─────────────── ───────────────────────────────────────────────────── I hereby apply for inspection as stated above in accordance with Article 13 of the Construction Machinery Management Act. Year month day Applicant: (Signature or seal) ○○○○ Your ━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━ ─────┬────────────┬───┬────────────────────────────── Attached Documents│ See back │Fee│ - New Registration Inspection for Construction Machinery Other Than Tower Cranes │ │ │ ·First Registration: 165,000 KRW │ │ │ · Re-registration (Inspection at Inspection Station): 82,500 KRW │ │ │ ·Re-registration (On-site Inspection): 57,800 KRW │ │ │ - Periodic and unscheduled inspections of construction machinery other than tower cranes │ │ │ ·Periodic Inspection (Inspection at Inspection Station): 82,500 won (Braking System Maintenance │ │ │When attaching confirmation: 57,800 won) │ │ │ ·Periodic Inspection (On-site Inspection): 57,800 KRW │ │ │ ·Unscheduled inspection at inspection station: 82,500 won │ │ │ ·Irregular Inspection (On-site Inspection): 57,800 KRW │ │ │ - Structural modification inspection for construction machinery other than tower cranes: 82,500 KRW │ │ │ - Inspection of Tower Cranes (New Registration Inspection, Periodic Inspection, │ │ │unscheduled inspection and structural alteration inspection) │ │ │ · Rated load less than 20 tons: 176,000 KRW │ │ │ ·Rated load 20 tons or more and less than 200 tons: 20 tons at 176,000 won │ │ │plus 3,300 won per 10 tons exceeding 20 tons. │ │ │ · Rated Load 200 tons: 314,600 KRW │ │ │ · Rated load exceeding 200 tons: 314,600 won for │ │ │4,400 won per 10 tons exceeding 200 tons, subject to a maximum of │ │ │550,000 won. ━━━━━┷━━━━━━━━━━━━┷━━━┷━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━ 210mm×297mm[White Paper (80g/㎡)] (Back) ━━━━━━━━━━━━━━━━━━━━━━━━━━ Attached Documents ────────────────────────── 1. New Registration Inspection A. Copy of Construction Machinery Registration Application b. Safety inspection certificate issued by a classification society under Article 60 (2) of the Ship Safety Act or the Korea Maritime Transportation Safety Authority under the Korea Maritime Transportation Safety Authority Act (for machinery used for work on water) c. Results of nondestructive testing carried out with the tower crane disassembled by an inspection agency registered under Article 11 of the Act on the Promotion and Management of Nondestructive Testing Technology (applicable only to initial registration inspection of used tower cranes imported on or after July 1, 2017) (as applicable) 2. Regular inspection a. When applying for a periodic inspection of a tower crane 1) Design documents or relevant site structural review report issued by a Professional Engineer in Construction Machinery, a Professional Engineer in Architectural Structural Engineering, etc. 2) Documents listing maintenance history, accident history, and internal inspection results for the past 3 years 3) Video footage of the relevant scenes during the installation and dismantling of the tower crane (only upon request) 4) In cases where foundation anchors are manufactured and installed separately, the foundation anchor manufacturing certificate, material test report, and the Specification Measurement Results (Must include a photo verifying the specifications of the base reinforcement material) 5) If a tower crane ten or more years old is moved and erected for periodic inspection, the following components shall be reviewed for safety by an inspection agency and a document stating the results submitted (submission may be omitted where the application is submitted to the agency that conducted the safety review). a) Reducer gear and shaft of hoisting device and lifting device b) Turntable swing gear and fixing bolt d) Each part of the climbing and telescopic device 6) In the case of relocating and installing a tower crane that has been in operation for more than 15 years since its date of manufacture to undergo a periodic inspection, the person who applied for the periodic inspection date, in accordance with Article 11 of the "Act on the Promotion and Management of Non-Destructive Testing Technology," non-destructive testing inspection agency registered as a nondestructive testing business operator, performed with the tower crane disassembled. b. In the case of applying for a periodic inspection of construction machinery pursuant to Article 2 of the Enforcement Decree of the Automobile Liability Insurance Act Documents proving subscription to insurance or mutual aid pursuant to Article 5 of the "Automobile Liability Insurance Act" (through the joint use of administrative information In cases where verification is possible and the applicant consents to the verification, such verification may substitute for submission. 3. Structural Modification Inspection A. Comparison Table of Major Specifications Before and After Change B. External drawings of the construction machinery before and after modification (applicable only if there is a change in the external appearance) c. Drawings of modified parts d. A classification society pursuant to Article 60, Paragraph 2 of the Ship Safety Act or the Korea Maritime Safety Agency pursuant to the Korea Maritime Safety Agency Act Safety inspection certificate issued by that authority (only for structural alteration inspections of machinery used for work on water) E. Certification of structural modification issued by a person registered as a construction machinery maintenance business operator pursuant to Article 14 of the Enforcement Decree of the Construction Machinery Management Act the alteration ────────────────────────── ━━━━━━━━━━━━━━━━━━━━━━━━━━ Processing Procedure ────────────────────────── This application will be processed as follows. ────────────────┬───────── Applicant │Processing agency ├───────── │InspectionAgent ────────────────┼───────── │ ┌───────────┐ │ ┌───┐ │Fill out application form │ │ ▶│Reception │ │ ├──┼── │ │ │ │ │ │ │ └───────────┘ │ └─┬─┘ │ │ │ │ │ │ │ │ ▼ │ ┌───┐ │ │Test │ │ │ │ │ │ │ │ └─┬─┘ │ │ │ │ │ │ │ │ ▼ │ ┌───┐ │ │Construction Machinery Inspection Certificate Entry│ │ │ │ │ │ │ │ └─┬─┘ │ │ │ │ │ │ │ │ ▼ ┌───────────┐ │ ┌───┐ │Issuance (or entry) of inspection certificate│◀ │ │Updating the registration ledger│ │ │ ─┼───┤ │ │ │ │ │ │ └───────────┘ │ └───┘ │ ────────────────┴─────────