Annex 3 — 전기공사업법 시행령

282331 · 2026-01-02

■ Enforcement Decree of the Electric Construction Business Act [Table 3-2] <Amended Jan. 5, 2021> Defect Liability Period by Type of Electrical Work (Related to Article 11-2) ┏━━━━━━━━━━━━━━━━━━━━━━━━━━━━┯━━━━━━━━┓ ┃Types of Electrical Work │Defect Warranty Period┃ ┠────────────────────────────┼────────┨ ┃1. Power Plant Facility Construction │ ┃ ┃ │ ┃ ┃ a. Reinforced concrete or steel structure │ 7Year ┃ ┃ │ ┃ ┃ B. Facility construction other than Item A │ 3Year ┃ ┃ │ ┃ ┃2. Tunnel and Open-cut Methods (referring to methods of drilling or excavating the ground) │ ┃ ┃Power Tunnel Transmission & Distribution Facility Construction │ ┃ ┃ │ ┃ ┃ a. Reinforced concrete or steel structure │10 years ┃ ┃ │ ┃ ┃ B. Transmission facility construction other than Item A │ 5 years ┃ ┃ │ ┃ ┃ . Distribution facility construction other than Item A │ 2Year ┃ ┃ │ ┃ ┃3. Underground Transmission and Distribution Facility Construction │ ┃ ┃ │ ┃ ┃ a. Transmission facility construction (cable construction and underwater transmission facility construction │ 5 years ┃ ┃) │ ┃ ┃ │ ┃ ┃ B. Power Distribution Facility Construction │ 3Year ┃ ┃ │ ┃ ┃4. Transmission facility construction (referring to transmission facility construction other than that in subparagraphs 2 and 3 │3Year ┃ ┃) │ ┃ ┃ │ ┃ ┃5. Substation Facility Construction (including electrical facility and equipment installation work) │3Year ┃ ┃ │ ┃ ┃6. Distribution facility construction (referring to distribution facility construction other than Nos. 2 and 3 │ ┃ ┃) │ ┃ ┃ │ ┃ ┃ A. Power Distribution Equipment Steel Tower Construction │3Year ┃ ┃ │ ┃ ┃ B. Power distribution facility construction other than Item A │2Year ┃ ┃ │ ┃ ┃7. Electrical Installation Works for Industrial Facilities, Buildings and Structures │1Year ┃ ┃ │ ┃ ┃8. Other electrical installation work │1Year ┃ ┗━━━━━━━━━━━━━━━━━━━━━━━━━━━━┷━━━━━━━━┛