Annex 1 — 자연재해대책법 시행령
282993 · 2026-02-01
■ Enforcement Decree of the Natural Disaster Countermeasures Act [Attached Table 1] <Amended Sep. 23, 2025>
Scope of Administrative Plans and Development Projects Subject to Consultation on Disaster Impact Assessment, etc., and Consultation
Timing (Related to Article 6, Paragraph 1)
1. Administrative Plan
┌───────────┬────────────────────┬────────────┐
│Classification │Target Administrative Plan │Consultation Period │
├───────────┼────────────────────┼────────────┤
│A. National Land and Regional Total │ 1) National pursuant to Article 12 of the National Land Framework Act │of related central administrative agencies │
│Planning and Urban Development │Comprehensive Local Plan │When consulting with the head │
│From ├────────────────────┼────────────┤
│ │ 2) Province pursuant to Article 15 of the Framework Act on National Land │of related central administrative agencies │
│ │Comprehensive Plan │When consulting with the head │
│ ├────────────────────┼────────────┤
│ │ 3) "Act on Planning and Utilization of National Land │The heads of relevant administrative agencies and │
│ │Special Cities and Metropolitan Areas pursuant to Article 22 of the "Rate" │Upon consultation │
│ │Provinces of Cities, Special Self-Governing Cities, and Special Self-Governing Provinces │ │
│ │City/County Basic Plan │ │
│ ├────────────────────┼────────────┤
│ │ 4) "Act on Planning and Utilization of National Land │The heads of relevant administrative agencies and │
│ │Rate” pursuant to Article 22-2 Si·Gun-Do │Upon consultation │
│ │City/County Basic Plan │ │
│ ├────────────────────┼────────────┤
│ │ 5) "Act on Planning and Utilization of National Land │Head of relevant administrative agency │
│ │City/County Management Section pursuant to Article 30 of the "Rate" │, │
│ │START │ │
│ ├────────────────────┼────────────┤
│ │ 6) "Act on Regional Development and Support │Head of relevant administrative agency │
│ │Regional development plan pursuant to Article 8 of the [Statute] │과 협의 시 │
│ ├────────────────────┼────────────┤
│ │ 7) Pursuant to Article 6 of the “Special Act on Public Housing” │Designation of Public Housing District │
│ │Designation of Public Housing Districts │Previous │
│ ├────────────────────┼────────────┤
│ │ 8) Pursuant to Article 3 of the "Residential Land Development Promotion Act" │of related central administrative agencies │
│ │Designation of Planned Residential Development Districts │When consulting with the head │
│ ├────────────────────┼────────────┤
│ │ 9) Urban pursuant to Article 4 of the "Urban Development Act" │Before establishing a development plan (all │
│ │Development plan for the development zone │Only Article 4, Paragraph 1 of the same Act │
│ │ │corresponding to the proviso of the START clause │
│ │ │, urban development district │
│ │ │Before Station Designation) │
│ ├────────────────────┼────────────┤
│ │ 10) Pursuant to Article 7 of the "Rural Development Act" │Before establishing maintenance plan │
│ │Agricultural Production Infrastructure Improvement Plan │ │
│ ├────────────────────┼────────────┤
│ │ 11) Pursuant to Article 54 of the "Rural Development Act" │Before establishing maintenance plan │
│ │Living Environment Improvement Plan │ │
│ ├────────────────────┼────────────┤
│ │ 12) "Act on Support for the Promotion of Small Local Towns" Article 4 │of related central administrative agencies │
│ │Comprehensive Development Plan for Small Local Towns under the START Article │When consulting with the head │
│ ├────────────────────┼────────────┤
│ │ 13) Pursuant to Article 6 of the "Island Development Promotion Act" │Before establishing a business plan │
│ │Island Development Project Plan │ │
│ ├────────────────────┼────────────┤
│ │ 14) 「Special Act on Private Rental Housing」 │of related central administrative agencies │
│ │Publicly supported private rental housing pursuant to Article 22 │Head and competent local government │
│ │Designation of Housing Supply Promotion Zones │When consulting with the head of the organization │
│ ├────────────────────┼────────────┤
│ │ Article 11 of the Special Act on Enterprise City Development │Before development plan approval │
│ │Enterprise City Development Plan according to START │ │
│ ├────────────────────┼────────────┤
│ │ 16) 「Development of East, West, and South Coasts and Inland Regions │Before development plan approval │
│ │East and West pursuant to Article 12 of the "Special Act" │ │
│ │Southern Coastal or Inland Region Development Plan │ │
│ ├────────────────────┼────────────┤
│ │ 17) Delete <2015.11.30.> │ │
│ ├────────────────────┼────────────┤
│ │ 18) 「Special Act on the Utilization of Waterfront Areas」 │of related central administrative agencies │
│ │Creation of a waterfront area pursuant to Article 4, Paragraph 2 │When consulting with the head │
│ │MTQ39ca8cabd2a29f3300493Plan regarding the startup business │ │
│ ├────────────────────┼────────────┤
│ │ 19) 「Act on Urban Parks and Green Spaces, etc. │BeforePlanDecision │
│ │Park development plan pursuant to Article 16 of the [Statute] │ │
├───────────┼────────────────────┼────────────┤
│B. Industrial and Distribution Division │ 1) "Industrial Location and Development Act" │Head of relevant administrative agency │
│Ji Jo Seong │Designation of a National Industrial Complex pursuant to Article 6 │, │
│ ├────────────────────┼────────────┤
│ │ 2) "Industrial Location and Development Act" │Head of relevant administrative agency │
│ │Designation of a General Industrial Complex pursuant to Article 7 │, │
│ ├────────────────────┼────────────┤
│ │ 2의2) 「Industrial Location and Development Act │Consult with the heads of relevant administrative agencies │
│ │Urban high-tech industry pursuant to Article 7-2 of the [ Rate] │'s time │
│ │Designation of complex │ │
│ ├────────────────────┼────────────┤
│ │ 3) "Industrial Location and Development Act" │Before Complex Designation │
│ │Designation of an agricultural and industrial complex pursuant to Article 8 │ │
│ ├────────────────────┼────────────┤
│ │ 4) 「Activation of industrial clusters and factory establishment │of related central administrative agencies │
│ │Industrial cluster pursuant to Article 3 of the Act on Industrial Clusters │When consulting with the head │
│ │Activation Basic Plan │ │
│ ├────────────────────┼────────────┤
│ │ 5) "Regarding the promotion of industrial clusters and factory establishment │Consultation with the Minister of Land, Infrastructure and Transport │
│ │of the host area pursuant to Article 23 of the Act │'s time │
│ │Specify │ │
│ ├────────────────────┼────────────┤
│ │ 6) "Regarding the development and operation of logistics facilities │Head of relevant administrative agency │
│ │General logistics complex pursuant to Article 22 of the Act │, │
│ │designation or pursuant to Article 22-2 of the same Act │ │
│ │Designation of Urban High-tech Logistics Complex │ │
│ ├────────────────────┼────────────┤
│ │ 7) 「Private investment in social infrastructure │Before establishing a plan │
│ │Private investment facility company pursuant to Article 10 of the "START Act" │ │
│ │Business Basic Plan │ │
│ ├────────────────────┼────────────┤
│ │ 8) 「Designation and Operation of Free Trade Zones │Consultation with the Minister of Strategy and Finance │
│ │Free trade pursuant to Article 4 of the Act on [Law Concerning] │'s poem │
│ │Designation of regions │ │
│ ├────────────────────┼────────────┤
│ │ 9) 「Regarding the designation and operation of free economic zones │Head of relevant administrative agency │
│ │pursuant to Article 4, Paragraph 4 of the “Special Act concerning ” │, │
│ │Free Economic Zone Development Plan │ │
│ ├────────────────────┼────────────┤
│ │ Article 25 of the Framework Act on the Promotion of Cultural Industries │Before establishing a plan │
│ │Cultural Industry Complex Development Plan According to START │ │
┌───────────┬────────────────────┬────────────┐
│. Construction of transportation facilities │ 1) 「Construction of railways and maintenance of railway facilities │of related central administrative agencies │
│ │Railway pursuant to Article 7 of the "Act on Railways" │When consulting with the head │
│ │Construction Basic Plan │ │
│ ├────────────────────┼────────────┤
│ │ 2) A route pursuant to Article 6 of the Urban Railway Act │Consult with the heads of relevant ministries │
│ │Urban Railway Master Plan by START │'s time │
│ ├────────────────────┼────────────┤
│ │ Pursuant to Article 7 of the "Rural Road Maintenance Act" │Before establishing maintenance plan │
│ │Road maintenance plan │ │
│ ├────────────────────┼────────────┤
│ │ 4) Airport pursuant to Article 4 of the "Airport Facilities Act" │Of related central administrative agencies │
│ │or basic plan regarding the development of an airfield │When consulting with the head │
│ │START │ │
│ ├────────────────────┼────────────┤
│ │ 5) Delete <2018. 12. 31.> │ │
├───────────┼────────────────────┼────────────┤
│d. Use of rivers and │ 1) 「Dam Construction, Management, and Support for Surrounding Areas │Head of relevant administrative agency │
│Development │Dam pursuant to Article 11 of the Act on the Concerning etc. │, │
│ │Construction Basic Plan │ │
│ ├────────────────────┼────────────┤
│ │ 2) Delete <2015.11.30.> │ │
├───────────┼────────────────────┼────────────┤
│E. Water Resources and Ocean │ 1) 「Regarding the Management and Reclamation of Public Waters │of related central administrative agencies │
│Development │Reclamation of public waters pursuant to Article 22 of the Act │When consulting with the head │
│ │Basic Plan │ │
│ ├────────────────────┼────────────┤
│ │ 2) Pursuant to Article 19 of the “Fishing Village and Fishing Port Act” │Before establishing a plan │
│ │Fishing Port Development Plan │ │
│ ├────────────────────┼────────────┤
│ │ Port vessels pursuant to Article 44 of the Port Act │of related central administrative agencies │
│ │Comprehensive Plan for Rear Complex Development │When consulting with the head │
│ ├────────────────────┼────────────┤
│ │ Pursuant to Article 3 of the "Act on the Promotion of New Port Construction" │Relevant mayors and provincial governors and │
│ │Basic Plan for New Port Construction │of related central administrative agencies │
│ │ │When consulting with the head │
│ ├────────────────────┼────────────┤
│ │ 5) 「Establishment and management of marina ports, etc. │of related central administrative agencies │
│ │Marina ports pursuant to Article 8 of the Act concerning [the] │When consulting with the head │
│ │Business plan regarding the formation and development, etc. of the site │ │
│ │START │ │
├───────────┼────────────────────┼────────────┤
│B. Mountain area development and valleys │ 1) 「Regarding the Promotion of Forestry and Mountain Villages │Before establishing a plan │
│ash harvest │Basic Mountain Village Promotion Act pursuant to Article 23 │ │
│ │Plan │ │
│ ├────────────────────┼────────────┤
│ │ 2) 「Regarding the Promotion of Forestry and Mountain Villages │Before establishing a plan │
│ │City/Province pursuant to Article 23 of the Act, City/ │ │
│ │County/District Mountain Village Promotion Plan │ │
│ ├────────────────────┼────────────┤
│ │ 3) Delete <2025. 9. 23.> │ │
│ ├────────────────────┼────────────┤
│ │ Pursuant to Article 5 of the "Act on Funeral Services, etc." │Before establishing a plan │
│ │Supply and demand of cemeteries, etc. in other cities, provinces, cities, counties, and districts │ │
│ │Plan │ │
│ ├────────────────────┼────────────┤
│ │ 5) Mining equipment pursuant to Article 85 of the "Mining Act" │Before establishing a plan │
│ │main plan │ │
│ ├────────────────────┼────────────┤
│ │ 6) Delete <2014.3.11> │ │
├───────────┼────────────────────┼────────────┤
│Company. Tourism Complex Development │ Pursuant to Article 49, Paragraph 1 of the Tourism Promotion Act │Before establishing a plan │
│and sports facilities │Basic Tourism Development Plan │ │
│ ├────────────────────┼────────────┤
│ │ 2) Public pursuant to Article 52 of the “Tourism Promotion Act” │Before designation │
│ │Designation of Gwangji and Tourism Complex │ │
│ ├────────────────────┼────────────┤
│ │ Pursuant to Article 47 of the "Youth Activities Promotion Act" │Head of relevant administrative agency │
│ │Designation of other youth training districts │, │
└───────────┴────────────────────┴────────────┘
Remarks
1. Among the administrative plans in the table above, the scope of administrative plans requiring consultation for disaster impact assessment is
The scale of the subject of the administrative plan to be established, designated, etc., as prescribed by individual laws
(parks pursuant to Article 16 of the "Act on Urban Parks and Green Spaces, etc."
In the case of a development plan, if the site area is 5,000 square meters or more, or the length is 2 kilometers or more
Refers to the case where is limited to.
2. In the case of a city/county management plan pursuant to Item 5) of Subparagraph A of the above table, any of the following subparagraphs [
Consultation on disaster impact assessment is conducted only in cases of occurrence.
a. of the urban and county management plan pursuant to Article 34 of the Act on Planning and Utilization of National Land
Maintenance (excluding cases where only the district unit plan is maintained separately)
b. Green spaces pursuant to Article 36, Paragraph 1, Subparagraph 1, Item (d) of the Act on Planning and Utilization of National Land
station in a residential area, commercial area, or public area pursuant to the provisions of subparagraphs (a) through (c) of the same subparagraph
Change to a business area or conservation officer pursuant to subparagraphs 2 through 4 of the same paragraph
Areas, Production Management Areas, Agricultural and Forestry Areas, Natural Environment Conservation Areas, or areas where the use is not designated
is in the case of changing the area to a planned management area pursuant to Subparagraph 2, Item (c) of the same paragraph
. Urban and county planning facilities pursuant to Article 43 of the "Act on Planning and Utilization of National Land"
In cases where a site area of 5,000 square meters or more or a length of 2 kilometers or more is determined (
)
3. Establishing two or more administrative plans targeting the same area for a single project purpose·
In the case of designation, consultation on disaster impact assessment must first be conducted at the administrative plan stage of establishment or designation.
...but it is difficult to present disaster prevention measures at the administrative plan stage of establishing or designating first
In such cases, consultation may be conducted at the next administrative planning stage.
2. Development Project
┌───────────┬────────────────────┬────────────┐
│Classification │Target Development Project │Consultation Period │
├───────────┼────────────────────┼────────────┤
│A. National Land and Regional Total │ 1) "Act on Planning and Utilization of National Land │Before development activity permit │
│Planning and Urban Development │Article 56 (Paragraph 1, Subparagraphs 4 and 5) of the START Rate │ │
│From │(excluding │ │
│ │가 │ │
│ ├────────────────────┼────────────┤
│ │ 2) "Act on Planning and Utilization of National Land │Before approval of implementation plan │
│ │Urban and rural planning pursuant to Article 88 of the "Rate" │ │
│ │Facility Project Implementation Plan │ │
│ ├────────────────────┼────────────┤
│ │ 3) "Act on Regional Development and Support │Head of relevant administrative agency │
│ │Regarding regional development projects pursuant to Article 23 of the [] rate │, │
│ │Implementation plan for │ │
│ ├────────────────────┼────────────┤
│ │ 4) 「Special Act on Private Rental Housing」 │Before District Plan Approval │
│ │Publicly supported private rental housing pursuant to Article 28 │ │
│ │Housing Supply Promotion District Plan │ │
│ ├────────────────────┼────────────┤
│ │ 5) Province pursuant to Article 17 of the "Urban Development Act" │Before approval of implementation plan │
│ │City Development Project Implementation Plan │ │
│ ├────────────────────┼────────────┤
│ │ 6) Pursuant to Article 9 of the "Residential Land Development Promotion Act" │Before approval of implementation plan │
│ │Residential Land Development Project Implementation Plan │ │
│ ├────────────────────┼────────────┤
│ │ Pursuant to Article 17 of the Special Act on Public Housing │Before approval of implementation plan │
│ │Public Housing District Planning │ │
│ ├────────────────────┼────────────┤
│ │ 8) Academic pursuant to Article 4 of the “Higher Education Act” │Before School Establishment Approval │
│ │Establishment of the School │ │
│ ├────────────────────┼────────────┤
│ │ 9) Delete <2014.3.11> │ │
│ ├────────────────────┼────────────┤
│ │ 10) Pursuant to Article 9 of the "Rural Development Act" │Before establishing implementation plan │
│ │Implementation Plan for Agricultural Production Infrastructure Improvement Project │ │
│ │(Establishment/Redevelopment of reservoirs, land reclamation/sale │ │
│ │(Applicable only to land reclamation and settlement projects) │ │
│ ├────────────────────┼────────────┤
│ │ 11) Pursuant to Article 59 of the "Rural Development Act" │Before establishing the implementation plan(Da │
│ │Implementation Plan for Living Environment Improvement Project (Rural and Fishing Villages │Only, village improvement implementation plan │
│ │Village Construction and Redevelopment Projects, Settlers │is included │
│ │Applicable only to active development projects) │Above, the implementation plan approval │
│ │ │(before) │
│ ├────────────────────┼────────────┤
│ │ 12) "Act on Support for the Promotion of Small Local Towns" No. 7 │Before approval of development project (However, │
│ │Local small town development project pursuant to the START clause │State or local government │
│ │ │, for the implementation of the development project │
│ │ │before) │
│ ├────────────────────┼────────────┤
│ │ 13) Delete <2015.11.30.> │ │
│ ├────────────────────┼────────────┤
│ │ 14) Article 50 of the "Urban and Residential Environment Improvement Act" │Before implementation authorization │
│ │(Resumption │ │
│ │Applies only to development projects) │ │
│ ├────────────────────┼────────────┤
│ │ 15) Housing construction pursuant to Article 15 of the "Housing Act" │Before Business Plan Approval │
│ │Construction project plan or site development project plan │ │
│ ├────────────────────┼────────────┤
│ │ 16) 「Regarding National Defense and Military Facility Projects │Before approval of implementation plan │
│ │National Defense and Military City pursuant to Article 6 of the Act │ │
│ │Construction Project Implementation Plan │ │
│ ├────────────────────┼────────────┤
│ │ Article 12 of the Special Act on Enterprise City Development │Before approval of implementation plan │
│ │에 따른 기업도시개발사업에 관한 │ │
│ │ImplementationPlan │ │
│ ├────────────────────┼────────────┤
│ │ 18) 「East, West, and South Coasts and Inland Regions │Prior to approval of implementation plan. Da │
│ │Pursuant to Article 14 of the "Special Act on the Previous Special Act" │, the project implementer is the national │
│ │Western/Southern Coastal or Inland Region Developer │, implement │
│ │Implementation plan regarding the START business │Before plan finalization │
│ ├────────────────────┼────────────┤
│ │ 19) Delete <2015.11.30.> │ │
│ ├────────────────────┼────────────┤
│ │ Article 13 of the "Special Act on Support for Border Regions" │Prior to approval of project implementation. │
│ │Border region development project under the START clause │but, │
│ │ │State or local government │
│ │ │, at the time of business │
│ │ │Before establishing action plan │
│ ├────────────────────┼────────────┤
│ │ 21) "Special provisions regarding the utilization of waterfront areas │Before approval of implementation plan │
│ │Creation of waterfront areas pursuant to Article 13 of the Act │ │
│ │Implementation plan regarding the START project │ │
├───────────┼────────────────────┼────────────┤
│B. Industrial and Distribution Division │ 1) 「Industrial Location and Development Act │of related central administrative agencies │
│Ji Jo Seong │National industrial complex pursuant to Article 17 of the [ Rate] │When consulting with the head │
│ │Development Implementation Plan │ │
│ ├────────────────────┼────────────┤
│ │ 2) "Industrial Location and Development Act │Head of relevant administrative agency │
│ │General industrial complex pursuant to Article 18 of the [ Rate] │, │
│ │Development Implementation Plan │ │
│ ├────────────────────┼────────────┤
│ │ 2의2) 「Industrial Location and Development Act │The heads of relevant administrative agencies and │
│ │rate" │Upon consultation │
│ │Industrial Complex Development Implementation Plan │ │
│ ├────────────────────┼────────────┤
│ │ 3) "Industrial Location and Development Act" │Before approval of implementation plan │
│ │Implementation of agricultural and industrial complex development plan pursuant to Article 19 │ │
│ │START │ │
│ ├────────────────────┼────────────┤
│ │ 4) "Regarding the promotion of industrial clusters and factory establishment │Before approval of factory establishment, etc. │
│ │Establishment of a factory, etc. pursuant to Article 13 of the Act │ │
│ ├────────────────────┼────────────┤
│ │ Article 31 of the "Act on Promotion of Small and Medium Enterprises" │Before approval of implementation plan │
│ │Implementation plan for the complex development project pursuant to the START clause │ │
│ ├────────────────────┼────────────┤
│ │ 6) "Regarding the development and operation of logistics facilities │Before approval of construction implementation │
│ │Logistics terminal business pursuant to Article 9 of the Act │ │
│ ├────────────────────┼────────────┤
│ │ 7) "Regarding the development and operation of logistics facilities │Head of relevant administrative agency │
│ │Logistics Complex Development Office pursuant to Article 28 of the Act │, │
│ │City Plan │ │
│ ├────────────────────┼────────────┤
│ │ Pursuant to Article 29 of the Distribution Industry Development Act │Center Designation Before │
│ │Designated Joint Delivery Center │ │
│ ├────────────────────┼────────────┤
│ │ 9) 「Private investment in social infrastructure │Before approval of implementation plan │
│ │Private investment facilities pursuant to Article 15 of the "START Act" │ │
│ │Project Implementation Plan (Target Developers of Attached Table 1 │ │
│ │(Applicable only if included in business) │ │
│ ├────────────────────┼────────────┤
│ │ 10) 「Designation and Operation of Free Economic Zones │Before approval of implementation plan │
│ │pursuant to Article 9 of the “Special Act on START” │ │
│ │Implementation Plan for the Jeje Free Zone Development Project │ │
│ ├────────────────────┼────────────┤
│ │ 11) "To simplify industrial complex permits and approvals │Establishment of Industrial Complex Plan │
│ │Industrial complex pursuant to Article 8 of the “Special Act on Industrial Complexes” │or prior to approval │
│ │Plan │ │
├───────────┼────────────────────┼────────────┤
│. Energy development │ 1) Pursuant to Article 5 of the "Act on Promotion of Electric Power Development" │Of related central administrative agencies │
│ │Power Development Project Implementation Plan │When consulting with the head │
│ ├────────────────────┼────────────┤
│ │ 2) Article 22 of the “District Energy Business Act” │Before Construction Plan Approval │
│ │(Heat Source Facility │ │
│ │only) │ │
├───────────┼────────────────────┼────────────┤
│d. Construction of transportation facilities │ 1) "Construction of railways and maintenance of railway facilities │Before approval of implementation plan │
│ │pursuant to Article 9 of the Act on Management of [] │ │
│ │Railway Construction Project Implementation Plan │ │
│ ├────────────────────┼────────────┤
│ │ 2) pursuant to Article 7 of the “Urban Railway Act” │Before Business Plan Approval │
│ │Municipal Railway Project Plan │ │
│ ├────────────────────┼────────────┤
│ │ Article 8 of the "Rural Road Maintenance Act" │Before Business Plan Approval │
│ │따른 도로사업계획 │ │
│ ├────────────────────┼────────────┤
│ │ 4) Road construction pursuant to Article 31 of the “Road Act” │Before construction begins │
│ │Company (New construction and renovation only) │ │
│ ├────────────────────┼────────────┤
│ │ 5) Airport pursuant to Article 7 of the "Airport Facilities Act" │Before approval of implementation plan │
│ │or implementation plan regarding the airfield development project │ │
│ │START │ │
│ ├────────────────────┼────────────┤
│ │ 6) Delete <2018. 12. 31.> │ │
├───────────┼────────────────────┼────────────┤
│ma. Delete <2015.11.30.>│ │ │
├───────────┼────────────────────┼────────────┤
│B. Water Resources and Ocean │ 1) Pursuant to Article 23 of the “Fishing Village and Fishing Port Act” │Before business implementation permit (Da │
│Development │Fishing Port Development Project Plan │Only, the state or local governments │
│ │ │In the case of local governments, plans │
│ │ │Before establishment) │
│ ├────────────────────┼────────────┤
│ │ Port opening pursuant to Article 10 of the Port Act │Before establishing the implementation plan (However, │
│ │Project Implementation Plan │The non-management agency's implementation plan │
│ │ │In the case of establishing approval │
│ │ │before) │
│ ├────────────────────┼────────────┤
│ │ Pursuant to Article 8 of the "Act on the Promotion of New Port Construction" │Before approval of implementation plan │
│ │New Port Construction Project Implementation Plan │ │
│ ├────────────────────┼────────────┤
│ │ 4) "Regarding the management and reclamation of public waters │Before approval of implementation plan │
│ │Sale of public waters pursuant to Article 38 of the Act │ │
│ │Establishment Implementation Plan │ │
│ ├────────────────────┼────────────┤
│ │ 5) 「 Establishment and Management of Marina Ports, etc. │Before approval of implementation plan │
│ │pursuant to Article 13 of the Act concerning START │ │
│ │Implementation Plan for the Lina Port Development Project │ │
│ ├────────────────────┼────────────┤
│ │ 6) Pursuant to Article 7 of the “Fishing Village and Fishing Port Act” │Before establishing a business plan │
│ │Comprehensive Fishing Village Development Project Plan │ │
├───────────┼────────────────────┼────────────┤
│Company. Mountain area development and valleys │ Regarding the creation and management of forest resources │Before forest road installation │
│ash harvest │Installation of forest roads pursuant to Article 9 of the Act │ │
│ ├────────────────────┼────────────┤
│ │ 2) 「Promotion of Forestry and Mountain Village Development │Before Business Plan Approval │
│ │Article 25 of the Act concerning START │ │
│ │Mountain village development project plan according to START │ │
│ ├────────────────────┼────────────┤
│ │ 3) Aggregates pursuant to Article 22 of the "Aggregate Extraction Act" │Pre-approval │
│ │Extraction (River aggregate only) │ │
│ ├────────────────────┼────────────┤
│ │ Article 13 of the "Act on Funeral Services, etc." │Before installing cemetery │
│ │Installation of public cemeteries pursuant to START │ │
│ ├────────────────────┼────────────┤
│ │ Article 14 of the "Act on Funeral Services, etc." │Before cemetery installation permit │
│ │Installation of private cemeteries pursuant to START │ │
│ ├────────────────────┼────────────┤
│ │ 6) Pursuant to Article 39-9 of the "Coal Industry Act" │of related central administrative agencies │
│ │Coal Mining Area Promotion Project Plan │When consulting with the head │
│ ├────────────────────┼────────────┤
│ │ 7) Mining account pursuant to Article 42 of the "Mining Act" │Before mining plan approval │
│ │START │ │
│ ├────────────────────┼────────────┤
│ │ 8) Mountain pursuant to Article 14 of the Mountain Management Act │Mountain land conversion permit before │
│ │Exclusive │ │
│ ├────────────────────┼────────────┤
│ │ 8의2) Article 15-2 of the “Mountain Area Management Act” │Before Temporary Use Permit for Mountain Area │
│ │(the same law │ │
│ │Enforcement Decree Appendix 3-2, Subparagraph 2, Items (a) through (c) │ │
│ │Mountains for facilities in accordance with regulations up to START │ │
│ │If the temporary use period is 1 year or more │ │
│ │) │ │
│ ├────────────────────┼────────────┤
│ │ 9) Soil pursuant to Article 25 of the Mountain Management Act │Before collection permit │
│ │stone mining │ │
│ ├────────────────────┼────────────┤
│ │ 10) Pursuant to Article 29 of the “Mountain Area Management Act” │The heads of relevant administrative agencies and │
│ │Designation of Quarrying Complexes │Upon consultation │
│ ├────────────────────┼────────────┤
│ │ 11) 「Act on Forest Culture and Recreation」 │BeforeApprovalOfDevelopmentPlan │
│ │Plan for the establishment of a natural recreation forest pursuant to Article 14 │ │
├───────────┼────────────────────┼────────────┤
│A. Tourism Complex Development │ 1) pursuant to Article 54 of the "Tourism Promotion Act" │Before Approval of Development Plan │
│and sports facilities │Plan for the Development of a Tourist Site or Tourism Complex │ │
│ ├────────────────────┼────────────┤
│ │ 2) Public pursuant to Article 15 of the “Tourism Promotion Act” │Before Business Plan Approval │
│ │Optical business plan │ │
│ ├────────────────────┼────────────┤
│ │ 3) "Act on the Installation and Use of Sports Facilities │Before Business Plan Approval │
│ │Registered sports facility business pursuant to Article 12 of the [] │ │
│ │Business Plan │ │
│ ├────────────────────┼────────────┤
│ │ 4) Hot spring development plan pursuant to Article 10 of the "Hot Spring Act" │Before development plan approval │
│ │START │ │
│ ├────────────────────┼────────────┤
│ │ Pursuant to Article 48 of the "Youth Activities Promotion Act" │Before approval of development plan(Da │
│ │Training Zone Development Plan │, Special Self-Governing Province Governor· │
│ │ │Mayor/County Governor/District Head │
│ │ │is established, │
│ │ │Before establishment) │
└───────────┴────────────────────┴────────────┘
Remarks
1. Among the development projects in the table above, the scope of development projects requiring disaster impact assessment consultation is...
The site area of the development project for which permission, approval, etc. is sought in accordance with the relevant laws and regulations
5,000 square meters (of development activities pursuant to Article 56 of the Act on Planning and Utilization of National Land
In the case of a permit, development activity permit by land use zone pursuant to Article 55, Paragraph 1 of the Enforcement Decree of the same Act
, and the "Act on the Promotion of Industrial Agglomeration and Factory Establishment
In the case of approval for factory establishment pursuant to Article 13 of the Act, 10,000 square meters or more or a road
This shall apply when the distance is 2 kilometers or more. However, provided that the entire development project site [subject to Article 12 of the Act]
or tsunami risk zones pursuant to Article 25-3 of the Act
In cases where it is included, disaster impact assessment consultation must be conducted for all target development projects.
.
2. In the same area, two development projects subject to disaster impact assessment consultation according to the table above
In cases where implementation is intended to proceed beyond the START stage, consultation shall be held during the development project stage implemented first, provided that
In cases where it is difficult to present disaster prevention measures during the development project phase that is implemented first, that
Consultations can be held during the next phase of the development project.
3. The same business operator (two or more business operators divide land and each conduct the same type of business
(including cases where substantial identity is recognized between two or more business operators, such as implementing)
implements the same type of business in the same area of influence, the sum of the business scales is narrow
. In this case, regarding the timing of the consultation
Note 2 shall apply mutatis mutandis to [the case], and the criteria for recognizing substantial identity between business operators shall be administrative
The Minister of Safety and Security shall determine.
4. As a project deemed to have received approval, etc. under other laws, the development project's
Developments requiring disaster impact assessment consultation pursuant to Remarks No. 1 and No. 3 on the scale
If it falls within the scope of the project, consultation on the disaster impact assessment must be conducted.