Annex 3 — 시설물의 안전 및 유지관리에 관한 특별법 시행령

284791 · 2026-03-24

■ Enforcement Decree of the Special Act on Safety and Maintenance of Facilities [Appendix 3] <Amended Dec. 2, 2025> Timing of safety inspections, precise safety diagnoses, and performance evaluations (Related to Article 8, Paragraph 2, Article 10, Paragraph 3 and Article 28, Paragraph 2) ┌────┬──────┬───────────────┬───────┬─────┐ │Safety Rating│Regular Safety │Precision Safety Inspection │Precision Safety Diagnosis │PerformanceEvaluation │ │ │Check ├───────┬───────┤ │ │ │ │ │Buildings │Facilities other than buildings│ │ │ │ │ │ │Water │ │ │ ├────┼──────┼───────┼───────┼───────┼─────┤ │A Grade │Once in the half-year │At least once every 4 years│At least once every 3 years│At least once every 6 years│Once in 5 years │ ├────┤or later ├───────┼───────┼───────┤or later │ │B·C │ │At least once every 3 years│At least once every two years│At least once every 5 years│ │ │Grade │ │ │ │ │ │ ├────┼──────┼───────┼───────┼───────┤ │ │D·E │3 times a year │At least once every two years│At least once a year│At least once every 4 years│ │ │Grade │or later │ │ │ │ │ └────┴──────┴───────┴───────┴───────┴─────┘ Remarks 1. "Safety Grade" refers to the safety grade of a facility pursuant to Article 12 and Annex 8. 2. Conducted during the period from completion or approval of use until the first safety rating is assigned Regular safety inspections shall be conducted at least once every six months. 3. Regular safety inspections of Grade D (Inadequate) and Grade E (Poor) facilities shall be conducted before the thawing season, rainy season, and winter season, respectively Each shall be conducted at least once. In this case, the inspection period before the thawing season is February and March, and the inspection period before the rainy season is []. The START period is May and June, and the pre-winter inspection period is November and December. 4. Regular safety inspections of multi-unit housing are safety inspections pursuant to Article 33 of the "Act on the Management of Multi-unit Housing" (Local With respect to multi-unit housing not subject to mandatory management, the head of a local government [in accordance with] Article 34 of the same Act (In cases where a safety inspection has been conducted, this is included) shall be substituted. 5. The first detailed safety inspection shall be conducted on the completion date or date of approval for use of the facility (of the structural form In cases where it becomes a facility due to a change, the completion date or date of approval for use resulting from the change in structural form ). However, temporary use In the event that approval has been granted, the date of temporary use approval shall be used as the basis. 5-2. Notwithstanding Subparagraph 5, if the safety rating resulting from the periodic safety inspection is Grade D (Inadequate) or Grade E The initial detailed safety inspection of a Class 3 facility designated as (defective) is completed after the relevant periodic safety inspection. It shall be carried out within one year from the date of START. However, if a detailed safety inspection has been conducted within this period, The relevant detailed safety inspection may be omitted. 6. The first detailed safety inspection shall be conducted on the completion date or the date of approval for use (after completion or approval for use In cases where it becomes a Class 1 facility due to a change in structural form, the date of initial completion or approval for use It shall be carried out within one year from the time ten years have elapsed since the completion and use approval (referring to ). However, In the case where it becomes a Class 1 facility due to a change in structural form after 10 years have passed, the structure It shall be carried out within one year from the date of completion or approval for use due to a change in form. 6-2. Notwithstanding Subparagraph 6, if the result of the detailed safety inspection is Grade D (Inadequate) or Grade E (Poor) The initial detailed safety diagnosis conducted on Class 2 facilities designated as having the corresponding safety grade It shall commence within one year from the designated date and complete it within one year from the date of commencement. In this case, if the initial precise safety inspection result is re-designated as Grade D (Inadequate) or Grade E (Poor) , the result of the subsequent precise safety inspection or precise safety diagnosis is Grade A (Excellent) or B Precision according to the operation cycle in the table above until designated as START (Good) or C (Average). Conduct a safety inspection. 6-3. Notwithstanding Subparagraph 6, a city that has not undergone a detailed safety inspection after 30 years have elapsed since completion Among structures (excluding buildings) designated as Grade C (Average), Grade D (Inadequate), or Grade E (Poor) The detailed safety diagnosis conducted on Class 2 and Class 3 facilities corresponding to the relevant safety grade Commence within one year from the date designated as START, and must complete within one year from the date of commencement. . In this case, In the case of Class 2 facilities, the results of the detailed safety inspection or detailed safety diagnosis conducted thereafter Until designated as Grade STARTA (Excellent), Grade B (Good), or Grade C (Average), the actual [ ] of the table above [ ] A precise safety inspection is conducted according to the cycle at START. 7. For the first performance evaluation conducted, in the case of Class 1 facilities among the facilities subject to performance evaluation, the When conducting a precise safety inspection pursuant to Article 11, Paragraph 2 of the Act, in the case of Class 2 facilities Conducting the final detailed safety inspection before the expiration of the warranty period due to a change in structural form after completion and approval for use. However, due to a change in structural form after completion and approval for use, the performance evaluation In the case of becoming a permanent facility, a detailed safety inspection or detailed safety diagnosis in accordance with subparagraphs 5 and 6 . 8. The implementation cycle for precision safety inspections and precision safety diagnoses is the previous precision safety inspection and precision safety It is based on the date the diagnosis is completed. However, depending on the precision safety inspection cycle, precision Even if a safety inspection has been conducted, in cases where a detailed safety diagnosis has been conducted pursuant to Article 12 of the Act, The implementation cycle for precise safety inspections is determined based on the date the precise safety diagnosis was completed. 9. In the half-year period in which the completion date of the detailed safety inspection, emergency safety inspection, and detailed safety diagnosis falls, actual Regular safety inspections that must be conducted may be omitted. 10. Within 6 months prior to the completion date of the precise safety inspection, the last day of the inspection cycle The precise safety inspection to which belongs may be omitted. 11. The performance evaluation cycle shall be based on the date the previous performance evaluation was completed. 12. Facilities that are under construction or scheduled for demolition for expansion, alteration, remodeling, etc., For facilities not in use, safety inspections and detailed plans shall be conducted in consultation with the Minister of Land, Infrastructure and Transport. The execution of pre-diagnosis and performance evaluation may be omitted or the timing adjusted.