Annex 8 — 물환경보전법 시행령

284747 · 2026-03-24

■ Enforcement Decree of the Water Environment Preservation Act [Table 8] <Amended Nov. 23, 2021> Method of attaching measuring instruments (related to Article 35, Paragraph 2) 1. Method of Attaching Automatic Water Quality Measuring Equipment and Ancillary Facilities A. Automatic measurement data of automatic water quality measuring instruments and auxiliary facilities in the "Environmental Field Testing and Inspection In accordance with the Standard Testing Methods for Environmental Pollution pursuant to Article 6 of the Act on the, etc. It must be attached so that it can be transmitted to the control center. a. Depending on regional conditions or characteristics of sewage/wastewater, pollution control facilities, public wastewater treatment facilities or workplaces, etc. that install and operate two or more public sewage treatment facilities, for each facility Automatic water quality measuring instruments and ancillary facilities must be installed. However, in the following cases, the city It may not be attached depending on the setting. Individual treatment facilities with a treatment capacity of less than 200㎥/day (when treating by a wastewater consignment treatment operator (excluding facilities) that do not have automatic water quality measuring devices and auxiliary facilities attached to the facility can be. Raw wastewater or sewage of the same nature or condition treated at two or more treatment facilities (change permit or In cases where processing is carried out (including facilities under construction after obtaining approval for change), as below In the case of discharging treated water into my final discharge outlet, automatic water quality measuring equipment and The main facility may not be attached to each treatment facility. Automatic water quality measuring instruments pursuant to subparagraphs (a) and (b) are [related to] the "Testing and inspection in the environmental field..." Measuring instruments that have received type approval pursuant to Article 9 of the Act (pursuant to Article 9-2 of the same Act Must be (including measuring instruments that have received preliminary type approval). 2. Method of Attaching Total Electricity Meters and Total Flow Meters a. The cumulative power meter is configured to accumulate all power consumed in the operation of pollution control facilities. shall be installed, provided that electricity used by facilities other than pollution control facilities is not accumulated together must be attached separately. b. In cases where tap water, industrial water, groundwater, river water, etc. are used, respectively water usage A flow meter must be installed. However, in accordance with relevant laws and regulations, to measure the flow rate in use If a meter capable of doing so is installed, it shall be deemed that a water cumulative flow meter has been installed. . After primary treatment of wastewater, a joint pollution control facility, a public wastewater treatment facility, or a public sewage treatment In cases where wastewater is discharged into facilities for secondary treatment, such as START, primary treatment is performed on a site-by-site basis A sewage/wastewater cumulative flow meter must be installed at each water discharge port. d. Measuring instruments to which automatic water quality measuring devices and auxiliary facilities must be attached in accordance with Annex 7 Business sites subject to installation, etc., [regarding] the automatic measurement data measured by sewage and wastewater cumulative flow meters [regarding] Environmental pollution process testing equipment pursuant to Article 6 of the "Act on Testing, Inspection, etc. in the Environmental Field" It must be attached so that it can be transmitted to the control center in accordance with the standards.