Annex 6 — 물환경보전법 시행령

284747 · 2026-03-24

■ Enforcement Decree of the Water Environment Preservation Act [Appendix 6] <Amended July 2, 2019> Detailed Installation Standards for Zero-Discharge Wastewater Discharge Facilities (Related to Article 31, Paragraph 7) 1. Pipelines for wastewater flowing from discharge facilities to separation and collection facilities can be observed with the naked eye can be installed. 2. The treatment process diagram and wastewater piping diagram of the discharge facility shall be made recognizable by anyone, with major piping It must be attached at the installation site of the discharge facility and the wastewater treatment plant. 3. To treat wastewater into solid waste, evaporation, concentration, drying, dehydration, or [unclear] Each facility must be installed, and wastewater generated from pollution control facilities such as dehydration must be installed at the pollution control facility . 4. Facilities used for collecting, transporting, treating, or storing wastewater shall prevent wastewater leakage It must be made of a material capable of preventing wastewater from entering the ground, and the floor equipped with prevention facilities must be made of a material capable of preventing wastewater from entering the ground It must be a non-permeable material. 5. Wastewater must be collected, transported, treated, and stored through fixed pipelines. Facilities used for collecting, transporting, treating, and storing wastewater must detect wastewater leakage with the naked eye. , but if unavoidable, Equipment must be installed. 7. The containment facility or containment space and retention facility for leaked wastewater prevents wastewater from seeping into the ground and introduces wastewater into the storage tank of the wastewater treatment plant Must be equipped with START facilities. 8. Pollution control facilities, containment and storage facilities, waste storage facilities, etc. related to zero-discharge wastewater facilities A roof must be installed to prevent contact with rainwater, and at waste storage facilities, and In the event that effluent is generated, the equipment for introducing the leachate into the storage tank of the wastewater treatment plant Must be equipped. Wastewater generated from zero-discharge wastewater facilities can be introduced into and retreated at a wastewater treatment plant Wet and condensation type air pollution control facilities, etc., must be installed. 10. In the case of zero-discharge wastewater facilities installed in special countermeasure areas, continuously for 24 hours a day If it is in operation, install a preliminary pollution control facility capable of treating the entire amount of discharged wastewater, and must be done, and if the maximum daily wastewater generation is 200 cubic meters or more, zero discharge of discharged wastewater A remote flow monitoring device capable of checking the START status in real time must be installed.