Annex 3 — 산업안전보건법 시행령
288347 · 2026-08-01
■ Enforcement Decree of the Occupational Safety and Health Act [Appendix 3] <Amended June 25, 2024>
Types of businesses required to have a safety manager, regular workers at the workplace
Number of Safety Managers, Method of Appointment (Related to Article 16, Paragraph 1)
┌────────────────┬────────┬─────────┬───────────┐
│Types of Business │Workplace's │Safety Manager's │Safety Manager's │
│ │Number of Regular Employees │BE │Appointment Method │
├────────────────┼────────┼─────────┼───────────┤
│ │ │ │ │
│ │ │ │ │
│1. Earth and sand mining │Regular Workers 50 │1 or more people │Attached Table 4, Item 1, Item 2 │
│2. Food manufacturing, beverage manufacturing │more than 500 people │ │No. 4, No. 5, No. │
│3. Manufacturing of textile products; excluding clothing │less │ │6호(정시근로자 300 │
│4. Manufacturing of wood and wood products; │ │ │business sites with fewer than │
│Exclude Furniture │ │ │applies), Item 7 (this │
│5. Pulp, paper and paper products │ │ │according to Table No. 27 │
│Operation │ │ │project only), │
│6. Coke, briquettes and refined petroleum products │ │ │No. 7-2(Regular Worker │
│Manufacturing │ │ │Companies with fewer than 300 employees │
│7. Manufacture of Chemicals and Chemical Products │ │ │(Applies only to establishments) │
│Up; Exclude Pharmaceuticals │ │ │and any of No. 8 │
│8. Manufacture of Medical Substances and Pharmaceuticals │ │ │One corresponding company │
│Up │ │ │who must appoint │
│9. Manufacture of Rubber and Plastic Products │ │ │. │
│UP ├────────┼─────────┼───────────┤
│10. Manufacture of Non-metallic Mineral Products │Regular Workers 50 │2 or more people │Attached Table 4 No. 1 to │
│11. Primary Metal Manufacturing │0 or more │ │Up to No. 5, No. 7 │
│12. Manufacturing of metal processed products; │ │ │(According to No. 27 of this Table │
│Excludes households and furniture │ │ │As a business, on an ongoing basis │
│13. Electronic components, computers, video, audio │ │ │1,000 workers US │
│Manufacturer of telecommunications equipment │ │ │only applies to workplaces │
│14. Medical, precision, optical instruments and │ │ │) and among Item 8 │
│System Manufacturing │ │ │corresponding to any one │
│15. Electrical Equipment Manufacturing │ │ │must appoint a person │
│16. Manufacturing of Other Machinery and Equipment │ │ │. However, Appendix 4 │
│17. Automobile and Trailer Manufacturing │ │ │No. 1, No. 2(「National │
│UP │ │ │is in the Technical Qualifications Act │
│18. Manufacture of other transportation equipment │ │ │according to │
│19. Furniture Manufacturing │ │ │Acquire Engineer Qualification │
│20. Manufacture of other products │ │ │Excluding those who STARTed │
│21. Industrial Machinery and Equipment Repair │ │ │d) and among subparagraph 4 │
│UP │ │ │corresponds to one │
│22. Books, magazines and other printed materials │ │ │One or more people │
│Publishing │ │ │must be included. │
│23. Waste collection, transportation, treatment and │ │ │ │
│Raw Material Recycling Business │ │ │ │
│24. Environmental Cleanup and Restoration Business │ │ │ │
│25. General automobile repair business, automatic │ │ │ │
│Specialized Car Repair Shop │ │ │ │
│26. Power Generation Industry │ │ │ │
│27. Transportation and Warehousing │ │ │ │
├────────────────┼────────┼─────────┼───────────┤
│28. Agriculture, Forestry and Fisheries │Regular Workers 50 │1 or more people │Attached Table 4, Item 1, Item 2 │
│29. Nos. 2 through 21 │more than 1,000 people │ │, No. 3 (this table No. 2 │
│Manufacturing excluding business │. However, the │ │No. 8, No. 30 through │
│30. Electric, Gas, Steam and Air Conditioning │37th Business │ │Business only up to No. 46 │
│Section Supply business (excluding power generation business │(Real Estate Management │ │applies), No. 4, │
│da) │excluding │ │No. 5, No. 6(Regular │
│31. Water supply, sewage and waste treatment, │) and No. 40 │ │Less than 300 employees │
│Raw material recycling business (No. 23 and No. 24 │Business Overview │ │applicable only to workplaces │
│are excluded │Above is the constant muscle │ │), No. 7 (this table No. │
│) │100 people this │ │36 │
│32. Wholesale and retail trade │Less than 1,000 people │ │applies), of subsection 7 │
│33. Accommodation and Food Service │. │ │2(Regular workers 300 people │
│34. Production of Video and Audio Recordings │ │ │[Do not apply] │
│and distribution business │ │ │(subject to) and No. 8 │
│35. Radio broadcasting business and television │ │ │to any one of │
│Former Broadcasting Industry │ │ │The person being appointed │
│36. Postal and Telecommunications Services │ │ │must. │
│37. Real Estate Business ├────────┼─────────┼───────────┤
│38. Rental business; excluding real estate │Regular Worker 1 │2 or more people │Attached Table 4 No. 1 to │
│39. Research and Development │Over 1,000 people │ │Up to No. 5 or No. 8 │
│40. Photo processing business │ │ │to No. 10 │
│41. Business Facility Management and Landscaping Document │ │ │에 해당하는 사람을 │
│BISSUP │ │ │Must be appointed. All │
│42. Operation of Youth Training Facilities │ │ │, Appendix 4 No. 1, │
│43. Healthcare │ │ │No. 2, No. 4 and No. 5 │
│44. Arts, Sports and Leisure Related │ │ │issues │
│Service Industry │ │ │The person who fits 1 │
│45. Repair business for personal and consumer goods │ │ │Must include at least one person │
│(Businesses falling under Item 25 are │ │ │. │
│Exclude) │ │ │ │
│46. Other personal services │ │ │ │
│47. Public Administration(Cleaning, Facility Management, │ │ │ │
│Engaged in on-site work such as cooking │ │ │ │
│is, as a person, the Minister of Employment and Labor │ │ │ │
│Person designated and notified by the official │ │ │ │
│) │ │ │ │
│48. Educational Service Industry, including Elementary and Middle School │ │ │ │
│Higher education institutions, specialized schools │ │ │ │
│Schools · Foreign Schools and Alternative Schools │ │ │ │
│(Cleaning, facility management, cooking, etc. Current │ │ │ │
│Person engaged in business │ │ │ │
│determined by the Minister of Employment and Labor │ │ │ │
│Limited to persons notified via START │ │ │ │
│) │ │ │ │
├────────────────┼────────┼─────────┼───────────┤
│49. Construction Industry │Construction Amount 5 Billion │1 or more people │Attached Table 4 No. 1 to │
│ │Won or more (Relationship │ │Up to No. 7 and No. 10 │
│ │The contractor is 100 │ │to No. 12 │
│ │Over 100 million won) 120 │ │corresponding to any one │
│ │Less than 100 million won (「cases │ │must appoint a person │
│ │Basic Industrial Act │ │. │
│ │Enforcement Decree」 Attached Table │ │ │
│ │1 Item 1 (a) of │ │ │
│ │Of the civil engineering business │ │ │
│ │, 150 │ │ │
│ │Less than 100 million won) │ │ │
│ ├────────┼─────────┼───────────┤
│ │Construction Amount 120 │ │Attached Table 4 No. 1 to │
│ │over 100 million won(「case │ │Up to No. 7 and No. 10 │
│ │Framework Act on Industrial Development │ │In any one of the STARTs │
│ │Enforcement Decree」 Attached Table │ │The person being appointed │
│ │1 Item 1(a) of │ │MTQ415c615124d4cc3600154must START. │
│ │Of the civil engineering business │ │ │
│ │, 150 │ │ │
│ │Over 100 million won) 800 │ │ │
│ │Less than 100 million won │ │ │
│ ├────────┼─────────┼───────────┤
│ │Construction Amount 800 │2 or more people. All │Attached Table 4 Items 1 through │
│ │Over 100 million won 1,500 │only, entire construction │Up to No. 7 and No. 10 │
│ │Less than 100 million won │period to 100 │의 어느 하나에 해당 │
│ │ │, construction │appointing a person │
│ │ │Start to 15 │, and the same table No. 1 │
│ │ │Current period │up to No. 3 │
│ │ │and Construction Completion │corresponds to one │
│ │ │In the previous 15 │One or more people │
│ │ │Period of being subjected to │must be included. │
│ │ │(hereinafter “All │ │
│ │ │During construction period │ │
│ │ │Before/After 15 at │ │
│ │ │The corresponding │ │
│ │ │is called” │ │
│ │ │, 1 person this │ │
│ │ │to be used. │ │
│ ├────────┼─────────┼───────────┤
│ │Construction amount 1,500 │3 or more people. All │Attached Table 4 No. 1 to │
│ │Over 100 million won 2,200 │only, entire construction │Up to No. 7 and No. 12 │
│ │Less than 100 million won │period, all │의 어느 하나에 해 │
│ │ │followed by 15 │The person being appointed │
│ │ │is 2 │, provided that, in the same table No. 12 │
│ │ │more than │호에 해당하는 사람 │
│ │ │. │can include only 1 person │
│ ├────────┼─────────┤and the same table No. 1 │
│ │Construction amount 2,200 │4 or more people. All │or "National Technician │
│ │Over 100 million won 300 │only, entire construction │Construction according to the "Smash Method" │
│ │Less than 100 million won │period │Safety Professional Engineer(Construction Plan │
│ │ │15에 해당하는 │Electrician or Industrial Engineer │
│ │ │The period is 2 people │Acquire electrician's qualification │
│ │ │to be used. │more than 7 years old │
│ │ │ │Perform facility safety duties │
│ │ │ │or construction │
│ │ │ │Industrial Safety Engineer or │
│ │ │ │OfTheIndustrialSafetyTechnician │
│ │ │ │qualification 10 │
│ │ │ │Years or more │
│ │ │ │Person who performed the task │
│ │ │ │) Qualification │
│ │ │ │(this │
│ │ │ │Ha “Industrial Safety Instructor │
│ │ │ │etc.”) this 1 person │
│ │ │ │. │
│ ├────────┼─────────┼───────────┤
│ │Construction cost 30 million │5 or more people. However, │Attached Table 4 No. 1 to │
│ │Over 100 million won 3,900 │Total Construction Period │Up to No. 7 and No. 12 │
│ │Less than 100 million won │Before/After 15 │to any one of │
│ │ │corresponding to │select the corresponding person │
│ │ │between 3 or more people │but, the same table No. 12 │
│ │ │. │호에 해당하는 사람 │
│ ├────────┼─────────┤This can include only 1 person │
│ │Construction Amount 3,900 │6 or more people. However, │exists, and industrial safety guidance │
│ │Over 100 million won 4,900 │Entire Construction Period │and others with 2 or more people │
│ │Less than 100 million won │Before/After 15 │must be included. All │
│ │ │corresponding to │only, total construction period │
│ │ │between 3 or more people │, at 15 before and after │
│ │ │. │, the mountain │
│ │ │ │Business Safety Instructors, etc. 1 │
│ │ │ │people │
│ │ │ │. │
│ ├────────┼─────────┼───────────┤
│ │Construction amount 4,900 │7 or more people. However, │Attached Table 4 Items 1 through │
│ │Over 100 million won 600 │Total Construction Period │up to No. 7 and No. 12 │
│ │Less than 100 million won │during front/back 15 at │corresponding to any one │
│ │ │Current period │appoints a person, but │
│ │ │is 4 or more people │In the same table No. 12 │
│ │ │. │The person in question is 2 │
│ ├────────┼─────────┤name │
│ │Construction cost 60 million │8 or more people. However, │is present, and industrial safety guidance │
│ │Over 100 million won 7,200 │Total Construction Period │and others with 2 or more people │
│ │Less than 100 million won │during front/back 15 at │must be included. All │
│ │ │Current period │only, total construction period │
│ │ │is 4 or more people │, at 15 minutes before and after │
│ │ │. │, the mountain │
│ │ │ │Business Safety Instructors etc. 2 │
│ │ │ │Must include at least one person │
│ │ │ │. │
│ ├────────┼─────────┼───────────┤
│ │Construction amount 7,200 │9 or more people. However, │Attached Table 4 No. 1 to │
│ │Over 100 million won 8,500 │Total Construction Period │Up to No. 7 and No. 12 │
│ │Less than 100 million won │during front/back 15 at │to any one of the │
│ │ │Current period │select the corresponding person │
│ │ │is 5 or more people │but, the same table No. 12 │
│ │ │. │호에 해당하는 사람 │
│ ├────────┼─────────┤includes up to 2 people │
│ │Construction amount 8,500 │10 or more people. All │can be, and industrial │
│ │Over 100 million won 1 trillion │only, entire construction │Instructor Jeon and others 3 people │
│ │Less than one won │period │Must include at least │
│ │ │15에 해당하는 │. However, the entire construction │
│ │ │The period is 5 people │During the period, before and after 15 │
│ │ │to be done. │, │
│ ├────────┼─────────┤is Industrial Safety Instructor │
│ │Over 1 trillion won │11 or more people[Every 2 │etc. │
│ │ │100 billion won(2 trillion won │must be. │
│ │ │onwards, every │ │
│ │ │300 billion won)every │ │
│ │ │1person added one by one │ │
│ │ │is]. However, the entire │ │
│ │ │During the construction period, all │ │
│ │ │ㆍAfter 15 in │ │
│ │ │is │ │
│ │ │No Candidate for Appointment │ │
│ │ │FormerAdministrator's │ │
│ │ │1/2 (decimal point │ │
│ │ │The following is rounded up │ │
│ │ │This concludes the explanation.│ │
│ │ │ │ │
│ │ │ │ │
└────────────────┴────────┴─────────┴───────────┘
Remarks
1. In the case of construction work including demolition work, the period during which only demolition work is carried out is the entire
It is included in the construction period, but for the period corresponding to the 15 days before and after the total construction period,
is not included. In this case, the period corresponding to the preceding and succeeding 15 days of the total construction period
It is calculated based on the construction period excluding the period during which only demolition work is carried out.
2. During the period when only demolition work is carried out, the minimum safety officer who must be appointed according to the construction cost
Safety managers must be appointed at a rate greater than the number of managers.