Annex 2 — 사방사업법 시행령

283127 · 2026-02-01

■ Enforcement Decree of the Erosion Control Act [Appendix 2] <Amended Jan. 30, 2026> Management, Inspection, Safety Diagnosis, and Safety Measures for Erosion Control Facilities (Related to Article 12) 1. Management of Erosion Control Facilities The manager of erosion control facilities shall exercise good management over the erosion control facilities. 2. Inspection of Erosion Control Facilities a. Inspection Type 1) Periodic Inspection: For check dams pursuant to Article 3, Subparagraph 3, Item (c) of the Act that have passed 4 years since completion, once a year shall be implemented for the above. However, considering the elapsed time after completion and inspection results, etc., the Administrator of the Korea Forest Service [announces] Depending on the circumstances, it may be conducted once every two years. 2) Frequent Inspection: When damage is feared or has occurred due to a typhoon or heavy rainfall, erosion control It shall be carried out on erosion control facilities that the facility manager deems require inspection. B. Inspection Method 1) Visual Inspection: Visually inspect the appearance of erosion control facilities for any abnormalities such as cracks, leakage, or collapse. 2) Detailed Inspection: In cases where the manager of the erosion control facility determines that a detailed inspection is necessary as a result of the visual inspection Inspect internal cracks, settlement, etc. of erosion control facilities using methods such as block inspection. . Inspection agency The inspection of erosion control facilities shall be conducted by any of the following agencies [in the case of a detailed inspection, 1) or 2) It shall be carried out by commissioning to the [applicable only to institutions]. However, commissioning may be made to the institution that constructed the relevant erosion control facilities. No. 1) Korea Forest Disaster Safety Technology Corporation pursuant to Article 58 of the Forest Disaster Prevention Act 2) Public interest corporation related to erosion control projects pursuant to the Act on the Establishment and Operation of Public Interest Corporations 3) Professional Engineer Office in the Forestry Sector under the Professional Engineers Act A forestry cooperative or the Korea Forestry Cooperative Federation pursuant to the Forestry Cooperatives Act 5) Engineering business operator in the agricultural and forestry specialized field pursuant to the "Engineering Industry Promotion Act" 3. Safety Diagnosis of Erosion Control Facilities a. Safety Diagnosis Target Among the check dams installed pursuant to Article 3, Subparagraph 3, Item (c) of the Act, serious water as a result of the detailed inspection pursuant to Subparagraph 2, Item (b) 2) Safety inspections may be conducted on check dams that have or are suspected of having physiological or functional defects. B. Safety Diagnosis Method Professionally diagnosing the safety status of check dams using safety diagnostic technologies or equipment such as non-destructive testing . . Safety diagnosis agency Safety inspections shall be conducted by entrusting them to any of the following institutions. 1) Korea Association of Industrial Technology pursuant to Article 22-2, Paragraph 1 of the Act 2) Implementation of precise safety diagnosis pursuant to Article 12 of the "Special Act on the Safety and Maintenance of Facilities" Tube 4. Safety Measures for Erosion Control Facilities a. In cases where there are matters requiring urgent action based on the results of the inspection under Subparagraph 2 or the safety diagnosis under Subparagraph 3 Emergency measures must be taken immediately. a. If, based on the results of the inspection under Subparagraph 2 or the safety diagnosis under Subparagraph 3, there is a serious problem with the safety of the erosion control facilities , necessary safety measures such as supplementation, improvement, removal, or reconstruction of erosion control facilities must be taken. 5. Other Other matters necessary for the management, inspection, safety diagnosis, and safety measures of erosion control facilities shall be determined by the Minister of the Korea Forest Service. and announced.