Annex 1 — 사방사업법 시행령

283127 · 2026-02-01

■ Enforcement Decree of the Erosion Control Act [Attached Table 1] <Amended July 2, 2019> Criteria, Methods, Target Projects, etc. for Feasibility Assessment of Erosion Control Projects (Related to Article 4-2) 1. Criteria for Feasibility Assessment ┌──────┬───────────────────────────────┐ │Type of Business │EvaluationCriteria │ ├──────┼───────────────────────────────┤ │CommonItems │a. The site for erosion control projects must be mountainous land or land adjacent to mountainous land. │ │ │a. Development for other purposes is planned or confirmed, or erosion control projects b. │ │ │Areas where it is not needed should be excluded from erosion control project sites. │ │ │. It is likely not a habitat for endangered animals and plants │ ├─┬────┼───────────────────────────────┤ │san│Landslide │ It must be an area with a high or concerning risk of landslides. │ │G│PreventionProgram│ │ │Company├────┼───────────────────────────────┤ │Room│Landslide │a. It must be an area where a landslide has occurred │ │Company│RecoveryProject│b. Areas where secondary damage, such as collapse, erosion, or soil runoff is expected │ │UP│ │willbe │ │ ├────┼───────────────────────────────┤ │ │Production area │ Areas at risk of devastation or areas where devastation is progressing │ │ │ConservationProject│As areas that are currently undergoing or have already begun, if erosion control projects are implemented, mountainous areas │ │ │ │Areas that are effective in preventing collapse, erosion, or runoff of soil and rocks │ │ │ │will be │ │ ├────┼───────────────────────────────┤ │ │Production area │To areas where devastation is feared, is in progress, or has already occurred o │ │ │RestorationProject│By implementing erosion control projects, the increase in the health, vitality, and stability of forest ecosystems │ │ │ │Jin will be possible │ ├─┼────┼───────────────────────────────┤ │해│Coast │a. Areas at risk of damage caused by tsunamis, strong winds, sandstorms, salinity, etc. │ │An│Disaster Prevention │or as an area where damage is in progress or has already occurred, erosion control projects │ │Company│Construction Project│It must be an area where damage can be prevented or reduced by implementing START. │ │Room│ │b. Within 200 meters of the high tide coastline │ │Company├────┼───────────────────────────────┤ │UP│Coastal Erosion│ Areas at risk of coastal erosion due to waves, etc., or coastal erosion │ │ │PreventionProject│As an area where the START ceremony is in progress or has already been conducted, implementing erosion control projects │ │ │ │If done, it will be an area capable of preventing or reducing coastal erosion │ ├─┼────┼───────────────────────────────┤ │ │ │ │ │ │ │ │ │Ya│Pending │ Areas where erosion is expected or erosion │ │Total│ConservationProject│As an area where erosion control projects are currently underway or have already been carried out, implementing erosion control projects │ │Company│ │If it is an area that can reduce flow velocity and prevent or reduce erosion │ │Room│ │thing │ │Company├────┼───────────────────────────────┤ │UP│Mooring │ Areas where damage to the stream is a concern, or where damage is in progress or... │ │ │RestorationProject│has been carried out, implementing erosion control projects prevents damage to streams and │ │ │ │reduces, and the promotion of the health, vitality, and stability of the stream ecosystem │ │ │ │It will be a capable region │ │ ├────┼───────────────────────────────┤ │ │Sabang Dam │ Damage due to landslides or debris flows in upstream areas is feared or damage is │ │ │InstallationProject│As an area currently undergoing erosion control, implementing such projects leads to landslides and debris flows │ │ │ │It must be an area capable of preventing or reducing damage caused by START. │ │ │ │ │ │ │ │ │ └─┴────┴───────────────────────────────┘ 2. Timing and Method of Feasibility Evaluation a. Evaluation Period: After selecting the erosion control project site and before proceeding with the detailed design, does. B. Evaluators: At least 3 persons with expertise in the field of erosion control or forest environment Evaluates. Evaluation Method: Based on the feasibility evaluation criteria for erosion control projects, the evaluator [assesses] the feasibility of the project Decide on the department, provided that at least two-thirds of the evaluators find it valid. must determine. 3. Projects Subject to Feasibility Evaluation The feasibility assessment conducted for any of the following erosion control projects . However, in cases where erosion control projects are carried out to restore natural disasters such as landslides, other A party suitability evaluation may not be performed. a. Erosion control projects with an estimated construction cost of 100 million won or more b. The following erosion control projects with a project site area of ​​10,000 square meters or more 1) Landslide Prevention Project 2) Landslide Restoration Project 3) Mountain Conservation Project 4) Mountain Restoration Project 5) Coastal Disaster Prevention Forest Creation Project . The following erosion control projects with a project site distance of 500 meters or more 1) Coastal Erosion Prevention Project 2) Stream Conservation Project 3) Mooring Restoration Project 4. Other Other matters necessary for the feasibility assessment shall be determined and announced by the Administrator of the Korea Forest Service.