Annex 2 — 발전소주변지역 지원에 관한 법률 시행령
281193 · 2026-01-02
■ Enforcement Decree of the Act on Support for Areas Surrounding Power Plants [Attached Table 2] <Amended Apr. 20, 2021>
Method for Calculating Grant Amounts for Basic Support Projects (Related to Article 27, Paragraph 1)
1. Annual grant amount for the basic support project
a. Calculation formula
Electricity generation in the year before last (kWh) × Subsidy unit price by power source (KRW/kWh)
+ Installed Capacity (MW) × Unit Price per Power Source (10,000 KRW/MW)
b. The amount of power generated pursuant to subparagraph a shall be sold to the Korea Power Exchange pursuant to Article 35 of the Electric Power Business Act
It refers to the amount of electric power. However, Article 8 of the Addenda to the Act on the Entire Amendment of the Electric Power Business Act, Act No. 6283
In the case of a power plant of a person supplying electricity to an electricity sales business operator pursuant to Article 9,
refers to the amount of power supplied.
2. Subsidy Unit Prices and Facility Capacity Unit Prices by Power Source
┏━━━━━━┯━━┯━━┯━━┯━━━┯━━┯━━┯━━┯━━┯━━━━━━━┓
┃Power Source │atomic│Flexible│lead-free│Oil │Gas│Positive│Hydro│Tips│New·Regenerative ┃
┃ │Force │tan │an │Firepower │Firepower│ │ │ │Energy ┃
┃ │ │Firepower│Firepower│ │ │ │ │ │ ┃
┠──────┼──┼──┼──┼───┼──┼──┼──┼──┼───────┨
┃Subsidy Unit Price │0.25│0.18│0.3 │0.15 │0.1 │0.2 │0.2 │0.2 │0.1 ┃
┃(won/kWh) │ │ │ │ │ │ │ │ │ ┃
┠──────┼──┼──┼──┼───┼──┼──┼──┼──┼───────┨
┃Equipment Capacity Unit │- │- │- │- │- │50 │500 │- │- ┃
┃가 │ │ │ │ │ │ │ │ │ ┃
┃(10,000 KRW/MW) │ │ │ │ │ │ │ │ │ ┃
┗━━━━━━┷━━┷━━┷━━┷━━━┷━━┷━━┷━━┷━━┷━━━━━━━┛
Remark: Among hydroelectric power plants (excluding pumped storage power plants) with a facility capacity exceeding 2,000 kilowatts 10,000
For power plants with a capacity of kilowatts or less, the unit price for new and renewable energy subsidies applies, and for 10,000 kilowatts
Power plants exceeding START watts are subject to hydropower subsidy unit rates.
3. Minimum limits for annual subsidies of basic support projects by power source
a. Nuclear power plants, thermal power plants, hydroelectric power plants, tidal power plants and facilities with a capacity of 10,000 kilowatts and
(excluding hydroelectric power facilities): 30 million won
B. New and renewable energy facilities with a capacity of 10,000 kilowatts or less: 20 million won
4. Other Matters
a. The support project plan target year for power plants where generators are newly constructed or decommissioned
The principal is calculated in months according to the construction and operation periods. In this case, the month of construction commencement
The START and the month of operation commencement shall be deemed the construction period, and the month of operation cessation shall be deemed the operation period.
B. Months in which there were no power generation records for the year before last due to generator construction shall be considered as construction periods, and construction
The amount of power generated during the installation period is the average utilization rate of the year before last of the same power source [the previous pursuant to Subparagraph 1(b)
It is calculated by applying the formula: Power ÷ {Equipment Capacity (kW) × 24 hours × 365 days}.
. If there are two or more generators with different power sources within the power plant premises, the subsidy is
Calculate by applying the subsidy unit price of the side with the higher unit price.
. In the case of areas where two or more surrounding regions overlap, the support funds are calculated separately
It shall be the total amount including the principal.
E. When calculating the annual subsidy, amounts less than 1 million won are discarded.
b. In the case of power plants generating electricity from power sources not specified in Subparagraph 2, Basic Support
The annual subsidy for the project is the lowest subsidy among the unit prices of subsidies by power source pursuant to Subparagraph 2.
It is calculated by applying the unit price, and the unit price for facility capacity under the same item is not applied.