Annex 3 — 도로법 시행령
287115 · 2026-07-01
■ Enforcement Decree of the Road Act [Appendix 3] <Amended Jan. 5, 2021>
Criteria for Calculating Occupancy Fees (Related to Article 69, Paragraph 1)
(Unit of amount: Won)
┏━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━┯━━━━━━━━━━━┯━━━━━━━━━━━━━━┓
┃Type of Occupying Object │기준 unit │Occupancy Fee ┃
┃ │ ├──────────────┨
┃ │ │소재지 ┃
┃ ├─────┬─────┼────┬────┬────┨
┃ │Occupancy Unit │Period Unit │Gabji │Eulji │Byungji ┃
┠────────┬──────────────────────┼─────┼─────┼────┼────┼────┨
┃1. Utility pole, ball │Utility poles, streetlights, and other similar items │1pc │1Year │1,850 │1,250 │850 ┃
┃Heavy telephone, transmission ├──────────────────────┤ │ ├────┼────┼────┨
┃Tower, etc. ground time │Underground distribution equipment box, wireless telephone base station, General │ │ │2,750 │1,850 │1,250 ┃
┃Seolmul │Terminal box for cable broadcasting, base station for outgoing mobile phones │ │ │ │ │ ┃
┃ │Country, traffic volume detector, parking meter, mailbox, small │ │ │ │ │ ┃
┃ │slash-and-burn fields, sand containers, snow removal equipment containers, and other such │ │ │ │ │ ┃
┃ │Similar thing │ │ │ │ │ ┃
┃ ├──────────────────────┤ │ ├────┼────┼────┨
┃ │Public telephones, and other similar items │ │ │54,200 │36,150 │24,100 ┃
┃ ├──────────────────────┼─────┼─────┼────┴────┴────┨
┃ │Transmission towers, and other similar items │Occupied Area │1Year │The amount obtained by multiplying the land price by 0.05 ┃
┃ │ │1 square meter │ │ ┃
┠────────┼─────────┬────────────┼─────┼─────┼────┬────┬────┨
┃2. Water pipes, electricity │Water pipe, sewer pipe, │Diameter 0.1m or less │Length │1Year │1,150 │750 │200 ┃
┃Sphere, Underground Anchor │Gas pipeline, oil pipeline, ├────────────┤1meter │ ├────┼────┼────┨
┃(Earth Anchor) etc. │Electricity, Telecommunications │Diameter greater than 0.1m less than or equal to 0.2m│ │ │2,400 │1,600 │400 ┃
┃Underground Installations │tube, heat transfer tube, agriculture ├────────────┤ │ ├────┼────┼────┨
┃ │Water pipe, work opening │Diameter greater than 0.2m less than or equal to 0.4m│ │ │4,850 │3,150 │850 ┃
┃ │(Manhole), Power Conduit, ├────────────┤ │ ├────┼────┼────┨
┃ │communication channel, other than │Diameter greater than 0.4m and less than or equal to 0.6m│ │ │7,250 │4,850 │1,250 ┃
┃ │Something similar to this ├────────────┤ │ ├────┼────┼────┨
┃ │ │Diameter greater than 0.6m and less than or equal to 0.8m│ │ │9,650 │6,400 │1,650 ┃
┃ │ ├────────────┤ │ ├────┼────┼────┨
┃ │ │Diameter greater than 0.8m and less than or equal to 1.0m│ │ │12,100 │8,050 │2,050 ┃
┃ │ ├────────────┤ │ ├────┼────┼────┨
┃ │ │Diameter greater than 1.0m and less than or equal to 2.0m│ │ │18,100 │12,100 │3,100 ┃
┃ │ ├────────────┤ │ ├────┼────┼────┨
┃ │ │Diameter greater than 2.0m and less than or equal to 3.0m│ │ │30,150 │20,150 │5,200 ┃
┃ │ ├────────────┤ │ ├────┼────┼────┨
┃ │ │Diameter exceeding 3.0m │ │ │42,250 │28,200 │7,250 ┃
┃ ├─────────┼────────────┼─────┼─────┼────┼────┼────┨
┃ │Underground anchoring device(어 │Diameter 0.1m or less │Length │1Year │1,800 │1,150 │300 ┃
┃ │anchor), culvert, that ├────────────┤1meter │ ├────┼────┼────┨
┃ │other than this similar │Diameter greater than 0.1m less than or equal to 0.2m│ │ │3,600 │2,400 │600 ┃
┃ │thing ├────────────┤ │ ├────┼────┼────┨
┃ │ │Diameter greater than 0.2m less than or equal to 0.4m│ │ │7,200 │4,850 │1,250 ┃
┃ │ ├────────────┤ │ ├────┼────┼────┨
┃ │ │Diameter greater than 0.4m and less than or equal to 0.6m│ │ │10,850 │7,250 │1,850 ┃
┃ │ ├────────────┤ │ ├────┼────┼────┨
┃ │ │Diameter greater than 0.6m and less than or equal to 0.8m│ │ │14,400 │9,650 │2,500 ┃
┃ │ ├────────────┤ │ ├────┼────┼────┨
┃ │ │Diameter greater than 0.8m and less than or equal to 1.0m│ │ │18,100 │12,100 │3,100 ┃
┃ │ ├────────────┤ │ ├────┼────┼────┨
┃ │ │Diameter greater than 1.0m and less than or equal to 2.0m│ │ │27,100 │18,100 │4,600 ┃
┃ │ ├────────────┤ │ ├────┼────┼────┨
┃ │ │Diameter greater than 2.0m and less than or equal to 3.0m│ │ │45,200 │30,150 │7,750 ┃
┃ │ ├────────────┤ │ ├────┼────┼────┨
┃ │ │Diameter exceeding 3.0m │ │ │63,250 │42,250 │10,850 ┃
┠────────┼─────────┴────────────┼─────┼─────┼────┴────┴────┨
┃ 3. Gas Station·Number │ Buildings │Occupied Area │1Year │The amount obtained by multiplying the land price by 0.04 ┃
┃SoJaCarChung ├──────────────────────┤1 square meter │ ├──────────────┨
┃Exhibition Facilities · Parking │ Access/Entrance │ │ │The amount obtained by multiplying the land price by 0.02 ┃
┃Jang·Passenger Automatic ├──────────────────────┤ │ ├──────────────┨
┃Car Terminal · Tue │ Others │ │ │The amount obtained by multiplying the land price by 0.05 ┃
┃Water Terminal · │ │ │ │ ┃
┃Train Repair Shop· │ │ │ │ ┃
┃Elevator · Freight │ │ │ │ ┃
┃Storage Area·Rest Area │ │ │ │ ┃
┃cow, other than │ │ │ │ ┃
┃similar to this │ │ │ │ ┃
┃thing and this above │ │ │ │ ┃
┃access road and │ │ │ │ ┃
┃EntranceRoad │ │ │ │ ┃
┠────────┴──────────────────────┼─────┼─────┼──────────────┨
┃4. Railways, tracks, and other similar things │Occupied Area │1Year │The amount obtained by multiplying the land price by 0.04 ┃
┃ │1 square meter │ │ ┃
┠────────┬─────────┬────────────┼─────┼─────┼──────────────┨
┃5. Underground Shopping Malls · │Buildings │1st floor building │Occupied Area │1Year │The amount obtained by multiplying the land price by 0.015┃
┃Halsil(「Architecture │ ├────────────┤1 square meter │ ├──────────────┨
┃Article 2 of the "Act" │ │2-story building │ │ │The amount obtained by multiplying the land price by 0.017┃
┃Paragraph 1 No. 2 │ ├────────────┤ │ ├──────────────┨
┃, │ │Buildings with 3 or more stories │ │ │The amount obtained by multiplying the land price by 0.019┃
┃as a structure ├─────────┴────────────┤ │ ├──────────────┨
┃「The System of the National Territory │Passage installed in the air or underground │ │ │The amount obtained by multiplying the land price by 0.0075┃
┃Planning and Utilization ├──────────────────────┤ │ ├──────────────┨
┃Law regarding START │Others │ │ │The amount obtained by multiplying the land price by 0.02 ┃
┃Rate Enforcement Decree」 │ │ │ │ ┃
┃Article 61, Paragraph 1 │ │ │ │ ┃
┃, │ │ │ │ ┃
┃Installing │ │ │ │ ┃
┃Only applicable │ │ │ │ ┃
┃da)·passage, that │ │ │ │ ┃
┃Outside this and you │ │ │ │ ┃
┃thing that was done │ │ │ │ ┃
┠────────┼─────────┬────────────┼─────┼─────┼────┬────┬────┨
┃ │Signboard(Projecting │Installed at the time (1 month │DisplayArea │1day │400 │300 │150 ┃
┃ │excluding START edition │(Occupied less than) │1 square meter │ │ │ │ ┃
┃6. Signboard (Projecting Signboard│da) ├────────────┼─────┼─────┼────┼────┼────┨
┃), │ │Others │DisplayedArea │1Year │122,000 │81,350 │20,700 ┃
┃Private Information Sign, │ │ │1 square meter │ │ │ │ ┃
┃Banner, Arch, ├─────────┴────────────┼─────┼─────┼────┼────┼────┨
┃In addition to this │ │ │ │ │ │ ┃
┃Similar thing │ │ │ │ │ │ ┃
┃ │Projecting Sign │DisplayedArea │1Year │58,400 │38,950 │9,900 ┃
┃ │ │1 square meter │ │ │ │ ┃
┃ │ │ │ │ │ │ ┃
┃ │ │ │ │ │ │ ┃
┃ ├──────────────────────┼─────┼─────┼────┼────┼────┨
┃ │Private Information Sign │1pc │1Year │101,650 │67,750 │17,250 ┃
┃ ├─────────┬────────────┼─────┼─────┼────┼────┼────┨
┃ │Banner │Use of ancestral rites or religious ceremonies │DisplayedArea │1day │400 │200 │50 ┃
┃ │ │Temporarily installed road item │1 square meter │ │ │ │ ┃
┃ │ ├────────────┤ │ ├────┼────┼────┨
┃ │ │Other uses │ │ │400 │300 │150 ┃
┃ ├─────────┼────────────┼─────┼─────┼────┼────┼────┨
┃ │Arch │RoadCrossing │DisplayArea │1Year │244,000 │162,700 │41,400 ┃
┃ │ ├────────────┤1 square meter │ ├────┼────┼────┨
┃ │ │Others │ │ │122,000 │81,350 │20,700 ┃
┃ │ │ │ │ │ │ │ ┃
┠────────┴─────────┼────────────┼─────┼─────┼────┴────┴────┨
┃7. Street stalls·Vending machines·Automated cash entry │Bus ticket counter, shoes │Occupied Area │1Year │The amount obtained by multiplying the land price by 0.01 ┃
┃ATMs, product display stands, and other such items │Repair stand │1 square meter │ │ ┃
┃와 유사한 것 ├────────────┤ │ ├──────────────┨
┃ │Street Stall · Vending Machine · │ │ │The amount obtained by multiplying the land price by 0.05 ┃
┃ │ATM· │ │ │ ┃
┃ │Product Display Stand │ │ │ ┃
┠──────────────────┼────────────┼─────┼─────┼────┬────┬────┨
┃8. Construction board walls, scaffolding, and waiting areas │Temporarily occupied │Occupied Area │1day │400 │300 │150 ┃
┃Construction facilities and materials such as START ├────────────┤1 square meter ├─────┼────┴────┴────┨
┃ │Others │ │1Year │The amount obtained by multiplying the land price by 0.05 ┃
┠──────────────────┴────────────┼─────┼─────┼──────────────┨
┃9. Offices, shops, and windows installed beneath the road surface of an overpass │Occupied Area │1Year │The amount obtained by multiplying the land price by 0.02 ┃
┃High schools, automobile parking lots, plazas, parks, and other similar places │1 square meter │ │ ┃
┃thing(office work handling flammable substances such as oil and gas │ │ │ ┃
┃(Excluding stores, shops, warehouses, etc.) │ │ │ ┃
┠───────────────────────────────┼─────┼─────┼──────────────┨
┃10. Structures and objects pursuant to the provisions of Nos. 1 through 9 │Occupied Area │1Year │The amount obtained by multiplying the land price by 0.02 ┃
┃Construction work for the temporary installation of facilities │1 square meter │ │ ┃
┃The site, other similar items and access roads for the same and │ │ │ ┃
┃Entrance │ │ │ ┃
┠──────────────────┬────────────┼─────┼─────┼──────────────┨
┃11. In subsections 1 through 10 │Agriculture and plant cultivation, fisheries │Occupied Area │1Year │The amount obtained by multiplying the land price by 0.01 ┃
┃Operations other than those specified in START │and for the consignment sale of catches │1 square meter │ │ ┃
┃Objects, Goods and Facilities │facility │ │ │ ┃
┃ ├────────────┤ │ ├──────────────┨
┃ │Housing │ │ │The amount obtained by multiplying the land price by 0.025┃
┃ ├────────────┤ │ ├──────────────┨
┃ │Others │ │ │The amount obtained by multiplying the land price by 0.05 ┃
┗━━━━━━━━━━━━━━━━━━┷━━━━━━━━━━━━┷━━━━━┷━━━━━┷━━━━━━━━━━━━━━┛
Remarks
1. Among the locations, "Gap-ji" refers to a Special City, "Eul-ji" refers to a Metropolitan City (excluding Eup and Myeon areas), and "Byeong-ji" refers to other areas
.
2. The land price is the "Act on Public Announcement of Real Estate Prices" of the land adjacent to the road-occupied portion (excluding the road site)
It shall be the individual officially assessed land price based on the "rate." In this case, the land adjacent to the road-occupied portion (excluding the road site)
If there are two or more parcels, the weighted average price shall be calculated by reflecting the ratio of the adjacent portions.
3. Where the occupancy fee is calculated on an annual basis and the calculation period is less than one year, each month shall be divided into 12 parts
It shall be one year, and in this case, fractions of less than one month shall not be calculated.
4. The display area of signs and private directional signs, etc., shall be based on the single largest display area.
5. Occupancy fees shall be calculated to the nearest 1 won, provided that any amount less than 100 won is discarded (e.g., 1,950 won → 1,900 won).
6. Among the occupied objects in Item 2 of the table above, installed for the same purpose as electrical conduits, telecommunication conduits, etc., but for maintaining function and conduits
In cases where two or more pipes are installed in parallel due to unavoidable circumstances, the pipe diameter shall be determined separately for each road occupancy permit case.
It is defined as the diameter of a circle having the same cross-sectional area as a rectangle circumscribing the phloem.
7. In cases where the occupancy unit of an occupant other than a circular pipe is applied in Item 2 of the table above, the external contact of the said occupant
It shall be the diameter of a circle having the same cross-sectional area as a rectangle.
8. In cases where the depth of the top of the underground occupied structure is 20 meters or more underground, half of the occupancy fee shall be, and 40 meters underground
, the occupancy fee shall be reduced by 4/5 for each.
9. In cases where two or more occupied structures with different occupancy fees are installed as a single composite occupancy structure, each occupancy fee shall be in accordance with the table above.
Calculate the fee. In this case, if the occupants are different, the fee must be charged separately for each occupant.