Annex 7 — 댐건설ㆍ관리 및 주변지역지원 등에 관한 법률 시행령
270087 · 2026-03-26
■ Enforcement Decree of the Act on the Construction and Management of Dams and Support for Surrounding Areas, etc. [Appendix 7] <Amended May 28, 2024>
Criteria for Calculating Support Funds for Dam Surrounding Area Support Projects (Related to Article 44, Paragraph 1)
1. The support funds for the Dam Surrounding Area Support Project for areas surrounding multi-purpose dams and flood control dams are
is calculated according to each item.
a. The dam surrounding area support project zone corresponds to Article 41, Paragraph 1, Subparagraphs 1 through 3
, the relevant subsidy (referring to subsidies for regional support projects and resident support projects.
The same applies to subparagraph (b) below) is calculated by adding the basic support amount and the additional support amount.
1) Basic Subsidy: Basic Subsidy + Power Generation Coefficient Amount + Water Supply Coefficient Amount + Reservoir Capacity
Coefficient Amount
The basic support funds and amounts by coefficient are as shown in the following table.
(Unit: 100 million KRW)
┌───┬────────────┬───────────┬────────────┐
│Basic │Generation Factor Amount │Water supply coefficient amount │Reservoir Capacity Factor Amount │
│Subsidy├─────────┬──┼────────┬──┼─────────┬──┤
│ │Annual Power Generation Capacity │Amount│Water Supply Capacity │Amount│TotalReservoirCapacity │Amount│
│ │(GWh) │ │(100 million m³/year) │ │(100 million ㎥) │ │
├───┼─────────┼──┼────────┼──┼─────────┼──┤
│2.5 │800 Exceeds │6.0 │ 20 Exceed │6.0 │ 25 Exceed │6.0 │
│ │550 greater than 800 or less │4.0 │ 15 greater than 15 and 20 or less│4.0 │ 20 greater than 25 or less │4.0 │
│ │Over 350 and under 550 │3.0 │ 10 greater than 10 and 15 or less│3.0 │ 15 greater than 15 and 20 or less │3.0 │
│ │Over 200 and under 350 │2.0 │ 5 greater than 5 and 10 or less│2.0 │ 10 greater than 10 and 15 or less │2.0 │
│ │ 40 greater than 200 or less │1.5 │ 1 Exceed 5 Below│1.5 │ 5 greater than 5 and less than or equal to 10 │1.5 │
│ │ 5 Exceed 40 or less │1.2 │0.5 exceeding 1 Below│1.2 │ Exceeds 0.5 5 Below │1.2 │
│ │ 5 Below │0.9 │ 0.5 or less│0.9 │ 0.5 or less │0.9 │
└───┴─────────┴──┴────────┴──┴─────────┴──┘
2) Additional Support Fund: (Total Contribution × 0.85 - Total Basic Support Fund) × {(Contribution to the relevant dam ÷ Total Contribution) +
(Relevant dam reservoir area ÷ Total reservoir area)}÷2. However, additional support calculated according to the formula
If the amount exceeds 1 billion won, it shall be the adjusted amount as shown in the following table.
(Unit: 100 million KRW)
┌──────────────────┬──────────────────────┐
│Additional support amount calculated according to the formula │AdjustmentAmount │
├──────────────────┼──────────────────────┤
│10 greater than 10 and 30 or less │10 + excess amount × 0.90 │
├──────────────────┼──────────────────────┤
│Over 30 and under 70 │28 + 30 excess × 0.85 │
├──────────────────┼──────────────────────┤
│ Over 70 and under 100 │62 + 70 excess amount × 0.80 │
├──────────────────┼──────────────────────┤
│ 100 exceeding │86 + excess amount of 100 × 0.75 │
└──────────────────┴──────────────────────┘
b. In cases where the dam surrounding area support project zone falls under Article 41, Paragraph 1, Subparagraph 4, the relevant support
The fund is within the scope of the amount obtained by subtracting the total support funds under Item (a) from the total contributions, the Dam Management Agency or
It shall be calculated according to the standards determined by the dam trustee. However, the support under subparagraph (a) of the same item
The average support amount per unit area for the project area is the dam surrounding area support for other dams in the relevant dam
Unit area of the project zone (referring to the area calculated according to each item of Subparagraph 3 of Attached Table 8-2)
It cannot exceed 30% of the average support amount per START.
Other support project expenses are the amount obtained by subtracting the support amounts under items (a) and (b) from the total contribution.
It shall be calculated within the range according to the standards determined by the Dam Management Agency or the dam trustee.
Only, the project cost for the dam reservoir usage fee subsidy is an amount within 50% of the dam reservoir usage fee.
However, it shall not exceed 20 percent of the contribution to the relevant dam.
Remarks
1. Among the provisions of Subparagraphs (a) through (c), total contribution, total basic support, total support, and total
The reservoir area corresponds to multi-purpose dams and flood control dams falling under Article 40, Paragraph 1.
It refers to the sum of the dam's contribution, basic support funds, support funds, and reservoir area.
2. The subsidy calculated pursuant to Item (a) is the former Annex 7 (Presidential Decree No. 32231 Dam Construction
prior to amendment by the Partial Amendment to the Enforcement Decree of the Act on Support for Surrounding Areas, etc.
(Referring to) for dam surrounding areas with less support funds than those calculated pursuant to Subparagraph 1(a)
Regarding the other land calculated by the Dam Management Agency or the dam trustee in accordance with subparagraph (c),
The difference from the original project cost must be paid.
2. The support funds for the Dam Surrounding Area Support Project for areas surrounding domestic and industrial water dams are
is calculated according to each item.
a. The dam surrounding area support project zone corresponds to Article 41, Paragraph 1, Subparagraphs 1 through 3
, the relevant subsidy (referring to subsidies for regional support projects and resident support projects.
The same applies to subparagraph (b) below) is calculated by adding the basic support amount and the additional support amount.
1) Basic Subsidy: Basic Subsidy + Water Supply Coefficient Amount + Reservoir Capacity Coefficient Amount
The basic support funds and amounts by coefficient are as shown in the following table.
(Unit: Million Won)
┏━━━┯━━━━━━━━━━━━━━━━┯━━━━━━━━━━━━━━━━━━━━┓
┃Basic │Water supply coefficient amount │Reservoir Capacity Factor Amount ┃
┃Subsidy├─────────────┬──┼─────────┬──────────┨
┃ │Domestic & Industrial Water Supply Capacity │Amount│Total Storage Capacity (Million m³)│Amount ┃
┃ │(million m³/year) │ │ │ ┃
┠───┼─────────────┼──┼─────────┼──────────┨
┃50 │ 80 Exceed │40 │ 150 Exceeds │40 ┃
┃ │Over 60 and under 80 │30 │110 greater than 150 or less │30 ┃
┃ │Over 40 and under 60 │25 │ Over 70 and under 110 │25 ┃
┃ │Over 20 and 40 or less │20 │ 30 Exceed 70 or less │20 ┃
┃ │ 20 or less │10 │ 30 or less │10 ┃
┗━━━┷━━━━━━━━━━━━━┷━━┷━━━━━━━━━┷━━━━━━━━━━┛
2) Additional Support Fund: (Total Contribution × 0.9 - Total Basic Support Fund) × {(Contribution to the relevant dam ÷ Total Contribution) +
(Relevant dam reservoir area ÷ Total reservoir area)}÷2
b. If the support project area falls under Article 41, Paragraph 1, Subparagraph 4, the relevant support funds are the total contribution
Within the scope of the amount obtained by subtracting the subsidy under Item (a) from the fund, the Dam Management Agency or the Dam Trustee
It is calculated according to the standards determined by .
Other support project expenses are the amount obtained by subtracting the support funds under items (a) and (b) from the total contribution.
It shall be calculated within the range according to the standards determined by the Dam Management Agency or the dam trustee.
Remark: Among the provisions of items (a) through (c), the total contribution, total basic support, and total reservoir surface area are
It follows the classifications of each of the following items.
1. In the case of a dam pursuant to Article 40, Paragraph 1, Subparagraph 1 or 2: the same dam management authority or dam
Contributions and basic support funds for domestic and industrial water dams managed by trustees
· Refers to the total sum of the reservoir surface area.
2. In the case of dams pursuant to Article 40, Paragraph 1, Subparagraph 3: corresponding domestic water dams and industrial
It refers to the total sum of the contribution, basic support funds, and reservoir area of the water supply dam.