■ Enforcement Decree of the Air Environment Preservation Act [Appendix 2] <Amended May 3, 2022>
Facilities Subject to Installation and Installation Method of Cumulative Electricity Meters (Related to Article 17, Paragraph 4)
1. Facilities Subject to Installation of Energy Meters
Pollution control facilities installed in emission facilities pursuant to Article 26 of the Act. Provided, however, that the following pollution control facilities are excluded.
a. Pollution control facilities connected to an exhaust outlet equipped with automatic chimney measuring devices
b. Where an cumulative power meter is not installed, such as when pollution control facilities and emission facilities use the same power supply equipment
Prevention facility that allows checking the operating status even after starting
It is a pollution control facility that must be in constant operation to perform the function of recovering raw materials or products.
. Pollution control facility equipped with IoT measuring devices
2. Method of Attaching an Energy Meter
a. The cumulative power meter shall be installed to accumulate all power consumed in operating pollution control facilities
shall be applied. However, in the case of machinery or equipment attached to the pollution control facility, the voltage used
but when it is difficult to install cumulative power meters on all auxiliary facilities because the power outage points are different
may install energy meters only on major auxiliary facilities (referring to blowers and pumps).
a. Electricity used by facilities other than pollution control facilities shall be separately classified so that it is not accumulated.
shall be attached, provided that the power consumption of the emission facility does not exceed twice the power consumption of the pollution control facility
In the case of , it may be attached without separate distinction.