Annex 4 — 건설산업기본법 시행령

287349 · 2026-06-23

■ Enforcement Decree of the Framework Act on the Construction Industry [Appendix 4] <Amended Aug. 3, 2021> Defect Liability Period by Type of Construction Work (Related to Article 30) ┏━━━━━━━━━┯━━━━━━━━━━━━━━━━━━━━━━━━━━┯━━┓ ┃By Construction │ByDetailedWorkType │Responsibility┃ ┃ │ │Period┃ ┠─────────┼──────────────────────────┼──┨ ┃1. Bridge │①The distance between columns is 50m or more, or the length is 500m │10Year┃ ┃ │이상인 교량의 철근콘크리트 또는 철골구조부 │ ┃ ┃ │ │ ┃ ┃ │Reinforced concrete or iron of bridges less than 500m in length │7Year ┃ ┃ │Bone structure part │ ┃ ┃ │ │ ┃ ┃ │③Construction types other than ① and ② among bridges (bridge deck paving, joints, handrails │2Year ┃ ┃ │Facilities etc.) │ ┃ ┃ │ │ ┃ ┃2. Tunnel │①Reinforced concrete or iron of a tunnel (including a subway) │10Year┃ ┃ │Bone structure part │ ┃ ┃ │ │ ┃ ┃ │②Construction types other than ① in the tunnel │5Year ┃ ┃ │ │ ┃ ┃3. Rail │Among railway facilities excluding bridges and tunnels, reinforced concrete or │7Year ┃ ┃ │is a steel structure │ ┃ ┃ │ │ ┃ ┃ │②① Facilities other than │5Year ┃ ┃ │ │ ┃ ┃4. Airports & Cable Cars │①Reinforced Concrete·Steel Structure │7Year ┃ ┃ │ │ ┃ ┃ │②① Facilities other than │5Year ┃ ┃ │ │ ┃ ┃5. Ports · Erosion Control & Reclamation │①Reinforced Concrete·Steel Structure │7Year ┃ ┃ │ │ ┃ ┃ │②① Facilities other than │5Year ┃ ┃ │ │ ┃ ┃6. Road │① Concrete paved road[culvert (underground or inside a structure) │ 3Year┃ ┃ │Includes side ditches (road ditches) and side ditches (road ditches) │ 2Year┃ ┃ │② Asphalt-paved roads (including culverts and side ditches) │ ┃ ┃ │ │ ┃ ┃7. Dam │① Main body and spillway (Residual waterway: when water exceeds a certain amount, extra│10Year┃ ┃ │) part │ ┃ ┃ │ │ ┃ ┃ │②① Facilities other than │5Year ┃ ┃ │ │ ┃ ┃8. Water Supply & Sewerage │①Reinforced Concrete·Steel Structure │7Year ┃ ┃ │ │ ┃ ┃ │②Pipeline Burial·Equipment Installation │3Year ┃ ┃ │ │ ┃ ┃9. Irrigation canals and landfills │ │3Year ┃ ┃ │ │ ┃ ┃10. Site Leveling │ │2Year ┃ ┃ │ │ ┃ ┃11. Landscaping │Landscaping facilities and landscaping planting │2Year ┃ ┃ │ │ ┃ ┃12. Power Generation, Gas and │①Reinforced Concrete·Steel Structure │7Year ┃ ┃IndustrialEquipment │ │ ┃ ┃ │②High pressure with a pressure of 10 kilograms or more per square centimeter │5Year ┃ ┃ │Installation work for pipelines (including auxiliary equipment) of │ ┃ ┃ │ │ ┃ ┃ │③Facilities other than ①·② │3Year ┃ ┃ │ │ ┃ ┃13. Other Civil Engineering Works │ │1Year ┃ ┃ │ │ ┃ ┃14. Architecture │①Large-scale public buildings (apartment complexes, general hospitals, tourist accommodations │10Year┃ ┃ │Facilities, cultural and assembly facilities, large-scale stores and other buildings 16 stories or higher │ ┃ ┃ │Columns and load-bearing walls of buildings for the purpose of START │ ┃ ┃ │②Structural aspects other than columns and load-bearing walls among large public buildings │ ┃ ┃ │ │ ┃ ┃ │Major parts and structural major parts of a building other than ① │5Year ┃ ┃ │ │ ┃ ┃ │③ Among buildings, excluding ①, ② and the specialized works under Item 15 │1Year ┃ ┃ │OtherParts │ ┃ ┃ │ │ ┃ ┃15. Specialized Construction │①Interior Architecture │1Year ┃ ┃ │ │ ┃ ┃ │②Earthwork │2Year ┃ ┃ │ │ ┃ ┃ │③Plastering·Tile │1Year ┃ ┃ │ │ ┃ ┃ │④Waterproof │3Year ┃ ┃ │ │ ┃ ┃ │⑤Stamp │1Year ┃ ┃ │ │ ┃ ┃ │⑥Masonry Works·Brickwork │2Year ┃ ┃ │ │ ┃ ┃ │⑦Window Installation │1Year ┃ ┃ │ │ ┃ ┃ │⑧Roof │3Year ┃ ┃ │ │ ┃ ┃ │⑨Sheet Metal │1Year ┃ ┃ │ │ ┃ ┃ │⑩ Hardware (excluding steel frames corresponding to Nos. 1 through 14 │2Year ┃ ┃ │) │ ┃ ┃ │ │ ┃ ┃ │⑪ Reinforced concrete (corresponding to the provisions of Nos. 1 through 14 │3Year ┃ ┃ │(excluding reinforced concrete) and concrete pavement │ ┃ ┃ │ │ ┃ ┃ │⑫Water Supply & Drainage·Utility Tunnel·Underground Reservoir·Heating & Cooling·Ventilation·Air │2Year ┃ ┃ │Harmonization · Automatic Control · Gas · Smoke Exhaust Equipment │ ┃ ┃ │ │ ┃ ┃ │⑬Elevator and Lifting Equipment Installation │3Year ┃ ┃ │ │ ┃ ┃ │⑭Boiler Installation │1Year ┃ ┃ │ │ ┃ ┃ │Building facilities other than ⑮⑫ㆍ⑭ │1Year ┃ ┃ │ │ ┃ ┃ │ Asphalt Paving │2Year ┃ ┃ │ │ ┃ ┃ │boring │1Year ┃ ┃ │ │ ┃ ┃ │Building Assembly(Assembly of columns and load-bearing walls of a building │1Year ┃ ┃ │and others, and this is in accordance with subparagraph 14) │ ┃ ┃ │ │ ┃ ┃ │GreenhouseInstallation │2Year ┃ ┗━━━━━━━━━┷━━━━━━━━━━━━━━━━━━━━━━━━━━┷━━┛ Remarks: For construction projects involving the combination of two or more types of work in the table above, the defect liability period is [defect] Except where liability cannot be distinguished, defects for each detailed work type sit shall be the warranty liability period.