Defect Liability Period by Type of Construction Work (Related to Article 30)
┏━━━━━━━━━┯━━━━━━━━━━━━━━━━━━━━━━━━━━┯━━┓
┃By Construction │ByDetailedWorkType │Responsibility┃
┃ │ │Period┃
┠─────────┼──────────────────────────┼──┨
┃1. Bridge │①The distance between columns is 50m or more, or the length is 500m │10Year┃
┃ │이상인 교량의 철근콘크리트 또는 철골구조부 │ ┃
┃ │ │ ┃
┃ │Reinforced concrete or iron of bridges less than 500m in length │7Year ┃
┃ │Bone structure part │ ┃
┃ │ │ ┃
┃ │③Construction types other than ① and ② among bridges (bridge deck paving, joints, handrails │2Year ┃
┃ │Facilities etc.) │ ┃
┃ │ │ ┃
┃2. Tunnel │①Reinforced concrete or iron of a tunnel (including a subway) │10Year┃
┃ │Bone structure part │ ┃
┃ │ │ ┃
┃ │②Construction types other than ① in the tunnel │5Year ┃
┃ │ │ ┃
┃3. Rail │Among railway facilities excluding bridges and tunnels, reinforced concrete or │7Year ┃
┃ │is a steel structure │ ┃
┃ │ │ ┃
┃ │②① Facilities other than │5Year ┃
┃ │ │ ┃
┃4. Airports & Cable Cars │①Reinforced Concrete·Steel Structure │7Year ┃
┃ │ │ ┃
┃ │②① Facilities other than │5Year ┃
┃ │ │ ┃
┃5. Ports · Erosion Control & Reclamation │①Reinforced Concrete·Steel Structure │7Year ┃
┃ │ │ ┃
┃ │②① Facilities other than │5Year ┃
┃ │ │ ┃
┃6. Road │① Concrete paved road[culvert (underground or inside a structure) │ 3Year┃
┃ │Includes side ditches (road ditches) and side ditches (road ditches) │ 2Year┃
┃ │② Asphalt-paved roads (including culverts and side ditches) │ ┃
┃ │ │ ┃
┃7. Dam │① Main body and spillway (Residual waterway: when water exceeds a certain amount, extra│10Year┃
┃ │) part │ ┃
┃ │ │ ┃
┃ │②① Facilities other than │5Year ┃
┃ │ │ ┃
┃8. Water Supply & Sewerage │①Reinforced Concrete·Steel Structure │7Year ┃
┃ │ │ ┃
┃ │②Pipeline Burial·Equipment Installation │3Year ┃
┃ │ │ ┃
┃9. Irrigation canals and landfills │ │3Year ┃
┃ │ │ ┃
┃10. Site Leveling │ │2Year ┃
┃ │ │ ┃
┃11. Landscaping │Landscaping facilities and landscaping planting │2Year ┃
┃ │ │ ┃
┃12. Power Generation, Gas and │①Reinforced Concrete·Steel Structure │7Year ┃
┃IndustrialEquipment │ │ ┃
┃ │②High pressure with a pressure of 10 kilograms or more per square centimeter │5Year ┃
┃ │Installation work for pipelines (including auxiliary equipment) of │ ┃
┃ │ │ ┃
┃ │③Facilities other than ①·② │3Year ┃
┃ │ │ ┃
┃13. Other Civil Engineering Works │ │1Year ┃
┃ │ │ ┃
┃14. Architecture │①Large-scale public buildings (apartment complexes, general hospitals, tourist accommodations │10Year┃
┃ │Facilities, cultural and assembly facilities, large-scale stores and other buildings 16 stories or higher │ ┃
┃ │Columns and load-bearing walls of buildings for the purpose of START │ ┃
┃ │②Structural aspects other than columns and load-bearing walls among large public buildings │ ┃
┃ │ │ ┃
┃ │Major parts and structural major parts of a building other than ① │5Year ┃
┃ │ │ ┃
┃ │③ Among buildings, excluding ①, ② and the specialized works under Item 15 │1Year ┃
┃ │OtherParts │ ┃
┃ │ │ ┃
┃15. Specialized Construction │①Interior Architecture │1Year ┃
┃ │ │ ┃
┃ │②Earthwork │2Year ┃
┃ │ │ ┃
┃ │③Plastering·Tile │1Year ┃
┃ │ │ ┃
┃ │④Waterproof │3Year ┃
┃ │ │ ┃
┃ │⑤Stamp │1Year ┃
┃ │ │ ┃
┃ │⑥Masonry Works·Brickwork │2Year ┃
┃ │ │ ┃
┃ │⑦Window Installation │1Year ┃
┃ │ │ ┃
┃ │⑧Roof │3Year ┃
┃ │ │ ┃
┃ │⑨Sheet Metal │1Year ┃
┃ │ │ ┃
┃ │⑩ Hardware (excluding steel frames corresponding to Nos. 1 through 14 │2Year ┃
┃ │) │ ┃
┃ │ │ ┃
┃ │⑪ Reinforced concrete (corresponding to the provisions of Nos. 1 through 14 │3Year ┃
┃ │(excluding reinforced concrete) and concrete pavement │ ┃
┃ │ │ ┃
┃ │⑫Water Supply & Drainage·Utility Tunnel·Underground Reservoir·Heating & Cooling·Ventilation·Air │2Year ┃
┃ │Harmonization · Automatic Control · Gas · Smoke Exhaust Equipment │ ┃
┃ │ │ ┃
┃ │⑬Elevator and Lifting Equipment Installation │3Year ┃
┃ │ │ ┃
┃ │⑭Boiler Installation │1Year ┃
┃ │ │ ┃
┃ │Building facilities other than ⑮⑫ㆍ⑭ │1Year ┃
┃ │ │ ┃
┃ │ Asphalt Paving │2Year ┃
┃ │ │ ┃
┃ │boring │1Year ┃
┃ │ │ ┃
┃ │Building Assembly(Assembly of columns and load-bearing walls of a building │1Year ┃
┃ │and others, and this is in accordance with subparagraph 14) │ ┃
┃ │ │ ┃
┃ │GreenhouseInstallation │2Year ┃
┗━━━━━━━━━┷━━━━━━━━━━━━━━━━━━━━━━━━━━┷━━┛
Remarks: For construction projects involving the combination of two or more types of work in the table above, the defect liability period is [defect]
Except where liability cannot be distinguished, defects for each detailed work type
sit shall be the warranty liability period.