Annex 2 — 건설산업기본법 시행령

287349 · 2026-06-23

■ Enforcement Decree of the Framework Act on Construction Industry [Appendix 2] <Amended Oct. 1, 2025> [The amended provision of Subparagraph 2, Item (g) of Annex 2 of Presidential Decree No. 31328 (December 29, 2020) is valid until December 31, 2023, pursuant to the provisions of Article 2 of the Addenda to the same Act] Registration Standards for Construction Business (Related to Article 13) 1. Registration Standards for Business Categories Performing General Construction Works ┌─────────┬─────────────────────┬────────────┐ │Construction Sector │TechnicalCapability │Capital │ ├─────────┼─────────────────────┼─────┬──────┤ │A. Civil Engineering Business │2 persons who fall under any of the following │Corporate │500 million won this │ │ │including soil under the “Construction Technology Promotion Act” │ │on │ │ │At least 6 construction engineers of entry-level or higher in the timber field ├─────┼──────┤ │ │1) Civil Engineer under the "National Technical Qualifications Act" │Individual │1 billion won │ │ │2) In the civil engineering field pursuant to the “Construction Technology Promotion Act” │ │or later │ │ │Intermediate or higher construction engineer │ │ │ ├─────────┼─────────────────────┼─────┼──────┤ │B. Construction Business │2 persons who fall under any of the following │Corporate │350 million │ │ │Construction pursuant to the “Construction Technology Promotion Act” including │ │Won or more │ │ │At least 5 construction engineers of entry-level or higher in the shaft field ├─────┼──────┤ │ │Architectural Engineer pursuant to the National Technical Qualifications Act │Individual │700 million won │ │ │2) In the field of architecture pursuant to the "Construction Technology Promotion Act" │ │or later │ │ │Intermediate or higher construction engineer │ │ │ ├─────────┼─────────────────────┼─────┼──────┤ │. Civil Engineering and Construction Business│1) and 2), each including the persons under │Corporate │850 million │ │ │Beginner level or higher pursuant to the Technology Promotion Act (if the same Act │ │Won or more │ │ │Among Article 3, Item (c) of Annex 1 of the Enforcement Decree, Construction Finance and Finance, ├─────┼──────┤ │ │(excluding the fields of construction planning and construction information processing) of │Individual │1.7 billion won │ │ │11 or more construction engineers │ │or later │ │ │1) Among any of the following persons 2 │ │ │ │ │Construction of entry level or higher in the civil engineering field including names │ │ │ │ │5 or more technicians │ │ │ │ │ a) Civil Engineer pursuant to the National Technical Qualifications Act │ │ │ │ │ b) Civil engineering division pursuant to the "Construction Technology Promotion Act" │ │ │ │ │Intermediate or higher construction technician of the │ │ │ │ │2) Among any of the following persons 2 │ │ │ │ │Entry-level or higher construction in the architecture field including name │ │ │ │ │5 or more technicians │ │ │ │ │ a) Architectural Engineer pursuant to the "National Technical Qualifications Act" │ │ │ │ │ b) Building division pursuant to the "Construction Technology Promotion Act" │ │ │ │ │Intermediate or higher construction technician of the │ │ │ ├─────────┼─────────────────────┼─────┼──────┤ │d. Industrial·Environmental Equipment│entry level or higher pursuant to the "Construction Technology Promotion Act" (same │Corporate │850 million │ │ConstructionBusiness │Among Item 3, Subparagraph (c) of Annex 1 of the Enforcement Decree of the Act, construction financeㆍ │ │Won or more │ │ │Finance, Construction Planning, and Construction Information Processing fields are excluded ├─────┼──────┤ │ │) or a "National Technical Qualification │Individual │1.7 billion won │ │ │Construction, civil engineering, landscaping, mining resources, and equipment pursuant to the "Act"│ │or later │ │ │System, Metals & Materials, Chemical Engineering, Electrical & Electronics, Information & Communication, │ │ │ │ │Industry in the fields of safety management, environment, and energy │ │ │ │ │At least 12 persons holding technical qualifications of Engineer or higher. │ │ │ │ │, among any of the following persons │ │ │ │ │Must include 6 people. │ │ │ │ │1) Architecture, Civil Engineering pursuant to the "National Technical Qualifications Act", │ │ │ │ │Landscaping, Mining Resources, Machinery, Metals & Materials, Chemical Engineering, │ │ │ │ │Electrical & Electronics, Information & Communications, Safety Management, Environment & E │ │ │ │ │Holders of technical qualifications of Engineer or higher in the energy field │ │ │ │ │2) Intermediate level or higher pursuant to the "Construction Technology Promotion Act" │ │ │ │ │Construction Engineer │ │ │ ├─────────┼─────────────────────┼─────┼──────┤ │E. Landscaping Construction Business │1) Among any of the following persons 2 │Corporate │500 million won │ │ │including the name pursuant to the “Construction Technology Promotion Act” │ │or later │ │ │4 ​​construction engineers of entry-level or higher in the landscaping field ├─────┼──────┤ │ │on │Individual │1 billion won │ │ │ a) Landscape Architect pursuant to the National Technical Qualifications Act │ │or later │ │ │ b) Landscaping pursuant to the "Construction Technology Promotion Act" │ │ │ │ │Intermediate or higher construction technician of the │ │ │ │ │2) In the civil engineering field pursuant to the “Construction Technology Promotion Act” │ │ │ │ │At least 1 entry-level construction technician │ │ │ │ │3) In the field of architecture pursuant to the “Construction Technology Promotion Act” │ │ │ │ │At least 1 entry-level construction technician │ │ │ └─────────┴─────────────────────┴─────┴──────┘ 2. Registration Standards by Business Field for Specialized Construction Businesses ┌─────┬────┬──────────────┬──────────┬───────┐ │Construction Sector │Business Field│TechnicalCapability │Facilities·Equipment │Capital │ ├─────┼────┼──────────────┼──────────┼───┬───┤ │A. Groundwork│1) Earthwork │corresponding to any of the following │ │Corporate │150 million│ │SeongㆍPo │Company │is 2 or more of the people │ │and modification │10000 │ │Installation │ │a) to the “Construction Technology Promotion Act” │ │IN │or later │ │UP │ │(Chem │ │ │ │ │ │ │Applicable only to the drug management field │ │ │ │ │ │ │( │ │ │ │ │ │ │Sulin │ │ │ │ │ │ │b) Under the "National Technical Qualifications Act" │ │ │ │ │ │ │따른 관련 종목의 기술자 │ │ │ │ │ │ │QualifiedPerson │ │ │ │ │ ├────┼──────────────┤ │ │ │ │ │2) Packaging │a) to the “Construction Technology Promotion Act” │ │ │ │ │ │Construction │Civil Engineering Field Beginner Level according to │ │ │ │ │ │ │is │ │ │ │ │ │ │on │ │ │ │ │ │ │b) Under the "National Technical Qualifications Act" │ │ │ │ │ │ │따른 관련 종목의 기술자 │ │ │ │ │ │ │2 or more qualified persons │ │ │ │ │ ├────┼──────────────┤ │ │ │ │ │3) Boring │corresponding to any of the following │ │ │ │ │ │ㆍGra │is 2 or more of the people │ │ │ │ │ │Wootingㆍ │a) to the “Construction Technology Promotion Act” │ │ │ │ │ │filegong │Civil Engineering Field Beginner Level according to │ │ │ │ │ │Company │Construction Engineer on │ │ │ │ │ │ │b) Under the "National Technical Qualifications Act" │ │ │ │ │ │ │or │ │ │ │ │ │ │Professional Engineer in Geology and Geotechnical Engineering │ │ │ │ │ │ │da) Under the "National Technical Qualifications Act" │ │ │ │ │ │ │따른 관련 종목의 기술자 │ │ │ │ │ │ │QualifiedPerson │ │ │ │ ├─────┼────┼──────────────┼──────────┼───┼───┤ │or. Indoor gun│Interior Architecture│corresponding to any of the following │ │Corporate │150 million│ │ConstructionWork │Construction │is 2 or more of the people │ │and │10000 │ │UP │ │a) to the “Construction Technology Promotion Act” │ │Individual │or later │ │ │ │따른 건축 분야의 초급 │ │ │ │ │ │ │or more Construction Engineer │ │ │ │ │ │ │b) Under the "National Technical Qualifications Act" │ │ │ │ │ │ │따른 관련 종목의 기술자 │ │ │ │ │ │ │QualifiedPerson │ │ │ │ ├─────┼────┼──────────────┼──────────┼───┼───┤ │. Metal·│1) Metal │corresponding to any of the following │ │Corporate │150 million│ │Windows · │Structure │is 2 or more of the people │ │and │10000 │ │Roofㆍ │ㆍWindows │a) to the “Construction Technology Promotion Act” │ │Individual │or later │ │Buildings │ㆍGreenhouse │and │ │ │ │ │Assembler │Construction │Construction machine of beginner level or higher in the field │ │ │ │ │Business │ │Sulin │ │ │ │ │ │ │b) Under the "National Technical Qualifications Act" │ │ │ │ │ │ │따른 관련 종목의 기술자 │ │ │ │ │ │ │QualifiedPerson │ │ │ │ │ ├────┼──────────────┤ │ │ │ │ │2) Roof │corresponding to any of the following │ │ │ │ │ │Sheet Metalㆍ │is 2 or more of the people │ │ │ │ │ │Buildings │a) to the “Construction Technology Promotion Act” │ │ │ │ │ │Assembly Worker │and │ │ │ │ │ │Company │Construction equipment of beginner level or higher in the field │ │ │ │ │ │ │Sulin │ │ │ │ │ │ │b) Under the "National Technical Qualifications Act" │ │ │ │ │ │ │따른 관련 종목의 기술자 │ │ │ │ │ │ │QualifiedPerson │ │ │ │ ├─────┼────┼──────────────┼──────────┼───┼───┤ │Ra. Paintingㆍ│1) Painting │corresponding to any of the following │ │Corporate │150 million│ │Wet typeㆍ │Construction │is 2 or more of the people │ │and │10000 │ │Waterproofㆍ │ │a) to the “Construction Technology Promotion Act” │ │Individual │or later │ │Stonework │ │in the field of civil engineering and construction │ │ │ │ │UP │ │Construction Engineer of Beginner Level or Higher │ │ │ │ │ │ │b) Under the "National Technical Qualifications Act" │ │ │ │ │ │ │따른 관련 종목의 기술자 │ │ │ │ │ │ │QualifiedPerson │ │ │ │ │ ├────┼──────────────┤ │ │ │ │ │2) Wet │corresponding to any of the following │ │ │ │ │ │ㆍWaterproof │is 2 or more people │ │ │ │ │ │Construction │a) to the “Construction Technology Promotion Act” │ │ │ │ │ │ │in the field of civil engineering and construction │ │ │ │ │ │ │Construction Engineer of Entry Level or Higher │ │ │ │ │ │ │b) Under the "National Technical Qualifications Act" │ │ │ │ │ │ │따른 관련 종목의 기술자 │ │ │ │ │ │ │QualifiedPerson │ │ │ │ │ ├────┼──────────────┤ │ │ │ │ │3) Masonry │corresponding to any of the following │ │ │ │ │ │Company │is 2 or more of the people │ │ │ │ │ │ │a) to the “Construction Technology Promotion Act” │ │ │ │ │ │ │in the field of civil engineering and construction │ │ │ │ │ │ │Construction Engineer of Entry Level or Higher │ │ │ │ │ │ │b) Under the "National Technical Qualifications Act" │ │ │ │ │ │ │따른 관련 종목의 기술자 │ │ │ │ │ │ │QualifiedPerson │ │ │ │ ├─────┼────┼──────────────┼──────────┼───┼───┤ │E. Jo Gyeong-sik│1) Landscaping │corresponding to any of the following │ │Corporate │150 million│ │Re/City │Planting Worker │is 2 or more people │ │and │10000 │ │Seolmulgong │Company │a) to the “Construction Technology Promotion Act” │ │Individual │or later │ │Business │ │따른 조경 분야의 초급 │ │ │ │ │ │ │Construction Engineer │ │ │ │ │ │ │b) Under the "National Technical Qualifications Act" │ │ │ │ │ │ │따른 관련 종목의 기술자 │ │ │ │ │ │ │QualifiedPerson │ │ │ │ │ ├────┼──────────────┤ │ │ │ │ │2) Landscaping │corresponding to any of the following │ │ │ │ │ │Facilities │is 2 or more people │ │ │ │ │ │InstallationWorker │a) to the “Construction Technology Promotion Act” │ │ │ │ │ │Company │따른 조경 분야의 초급 │ │ │ │ │ │ │Construction Engineer │ │ │ │ │ │ │b) Under the "National Technical Qualifications Act" │ │ │ │ │ │ │따른 관련 종목의 기술자 │ │ │ │ │ │ │QualifiedPerson │ │ │ │ ├─────┼────┼──────────────┼──────────┼───┼───┤ │Bar. Rebar ·│Rebar·Cone│corresponding to any of the following │ │Corporate │150 million│ │Concrete │Crete Work│is 2 or more of the people │ │and │10000 │ │T Construction │Company │a) to the “Construction Technology Promotion Act” │ │Individual │or later │ │UP │ │in the field of civil engineering and construction │ │ │ │ │ │ │Construction Engineer of Entry Level or Higher │ │ │ │ │ │ │b) Under the "National Technical Qualifications Act" │ │ │ │ │ │ │따른 관련 종목의 기술자 │ │ │ │ │ │ │QualifiedPerson │ │ │ │ ├─────┼────┼──────────────┼──────────┼───┼───┤ │Company. Structure│StructureSeason│corresponding to any of the following │ │Corporate │150 million│ │Dissolutionㆍ │Body/Scaffolding│is 2 or more of the people │ │and │10000 │ │Scaffolding │Construction │a) to the “Construction Technology Promotion Act” │ │Individual │or later │ │Business │ │따른 토목ㆍ건축ㆍ광업 │ │ │ │ │ │ │field(Chemicals Management field │ │ │ │ │ │ │Limited to) Beginner level or higher │ │ │ │ │ │ │Construction Engineer │ │ │ │ │ │ │b) Under the "National Technical Qualifications Act" │ │ │ │ │ │ │따른 관련 종목의 기술자 │ │ │ │ │ │ │QualifiedPerson │ │ │ │ ├─────┼────┼──────────────┼──────────┼───┼───┤ │Ah. Upper·Lower│Water Supply & Sewerage│corresponding to any of the following │ │Corporate │150 million│ │Water Supply │Equipment Construction│is 2 or more of the people │ │and │10000 │ │Non-Gongsa │ │a) to the “Construction Technology Promotion Act” │ │Individual │or later │ │UP │ │in the mechanical and civil engineering fields │ │ │ │ │ │ │Construction Engineer of Beginner Level or Higher │ │ │ │ │ │ │b) Under the "National Technical Qualifications Act" │ │ │ │ │ │ │따른 관련 종목의 기술자 │ │ │ │ │ │ │QualifiedPerson │ │ │ │ ├─────┼────┼──────────────┼──────────┼───┼───┤ │Ja. Railwayㆍ│Railway·Track│a) for any one of the following │(A) Transport Track │Corporate │150 million│ │orbital │Pottery │1 of the people being victimized │Car(MotorCar │ │10000 │ │Business │ │including 「Construction Technology Promotion │, │ │or later │ │ │ │field of civil engineering pursuant to the " │traction capacity 25 ├───┼───┤ │ │ │Entry-level or higher Construction Engineer 2 │Ton Lee Sang-in │Individual │300 million won │ │ │ │Name or more │as done │ │or later │ │ │ │ (1) In the “National Technical Qualifications Act” │determines) 1 │ │ │ │ │ │according to │or more │ │ │ │ │ │wood Knight │(Na) Trolley │ │ │ │ │ │ (2) 「Construction Technology Promotion Act」 │(trolley: soil │ │ │ │ │ │in the civil engineering field │etc. transport vehicle │ │ │ │ │ │Intermediate or higher construction engineer │refers to the amount │ │ │ │ │ │b) Under the “Construction Technology Promotion Act” │and, loading │ │ │ │ │ │따른 기계 분야의 초급 │of 10 tons │ │ │ │ │ │At least one construction engineer │thing that is a prize │ │ │ │ │ │on │-limited │ │ │ │ │ │C) Welding Craftsman · Special Welding Machine │) 4 major this │ │ │ │ │ │Including 1 skilled worker 「National │on │ │ │ │ │ │pursuant to the "Technical Qualifications Act" │(Da) Tie Tamper │ │ │ │ │ │Acquisition of technical qualifications for related items │(tie │ │ │ │ │ │2 or more beneficiaries │tamper: iron │ │ │ │ │ │ │to gravel │ │ │ │ │ │ │Dazing Jang │ │ │ │ │ │ │said about rain │ │ │ │ │ │ │) 2nd generation this │ │ │ │ │ │ │on │ │ │ │ │ │ │(d) open the rail │ │ │ │ │ │ │The characteristic of combining │ │ │ │ │ │ │Manual Welding Equipment │ │ │ │ │ │ │[Flasher │ │ │ │ │ │ │welding (fire │ │ │ │ │ │ │For flower sticks │ │ │ │ │ │ │(Connect) · Gas │ │ │ │ │ │ │Crimping Weld │ │ │ │ │ │ │(Gas Pressure Welding)] │ │ │ │ │ │ │1 or more │ │ │ │ │ │ │(Ma) Yangrogi(揚 │ │ │ │ │ │ │Route: Rail │ │ │ │ │ │ │lifting the frame │ │ │ │ │ │ │device to say │ │ │ │ │ │ │) 1 unit │ │ │ │ │ │ │or later │ │ │ ├─────┼────┼──────────────┼──────────┼───┼───┤ │. Steel ball│Steel Structure│corresponding to any of the following │ │Corporate │150 million│ │Jomulgong │WaterConstruction │is 4 or more people │ │ │100000 │ │Business │ │a) to the “Construction Technology Promotion Act” │ │ │or later │ │ │ │and │ ├───┼───┤ │ │ │Construction machine of beginner level or higher in the field │ │Individual │300 million won │ │ │ │Sulin │ │ │or later │ │ │ │b) Under the "National Technical Qualifications Act" │ │ │ │ │ │ │따른 관련 종목의 기술자 │ │ │ │ │ │ │QualifiedPerson │ │ │ │ ├─────┼────┼──────────────┼──────────┼───┼───┤ │K. Underwater ·│1) Underwater │a) to the “National Technical Qualifications Act” │(A) Next chapter │Corporate │150 million│ │Dredging Worker │Construction │, Diving Expert │all ratios │and │10000 │ │Business │ │Technician or Diving Craftsman │Table including START │Individual │or later │ │ │ │1 or more people │Noodle Supply Type │ │ │ │ │ │b) to any one of the following │Diving Equipment 2 │ │ │ │ │ │1 or more of the victims │Set or worse │ │ │ │ │ │ (1) 「Construction Technology Promotion Act」 │ ① Diving Helmet │ │ │ │ │ │Mechanical and Civil Engineering Division according to START │(KMB or │ │ │ │ │ │ya's Beginner or Higher Construction Log │Super │ │ │ │ │ │Sulin │Lite-17to │ │ │ │ │ │ (2) In the “National Technical Qualifications Act” │Limited) │ │ │ │ │ │따른 관련 종목의 기술 │ ② Air Compressor │ │ │ │ │ │Qualified Person │ ③ Awards·Water │ │ │ │ │ │ │Mid-communication device │ │ │ │ │ │ │ ④ Lifeline │ │ │ │ │ │ │Integrated (Low pressure port │ │ │ │ │ │ │Hose, Depth │ │ │ │ │ │ │Cycle Hose, Call │ │ │ │ │ │ │Wire Each │ │ │ │ │ │ │200 meters or more │ │ │ │ │ │ │equipped with all STARTs │ │ │ │ │ │ │Limited to as │ │ │ │ │ │ │) │ │ │ │ │ │ │(Na) Scuba Diving │ │ │ │ │ │ │5 sets │ │ │ │ │ │ │or later │ │ │ │ ├────┼──────────────┼──────────┤ │ │ │ │2) Dredging │a) in any one of the following │(A) The following quasi │ │ │ │ │Construction │1 of the people being subjected to │Seal line 2 │ │ │ │ │ │including 「Construction Technology Promotion │Species abnormal │ │ │ │ │ │field of civil engineering pursuant to the " │ ① Pump type semi- │ │ │ │ │ │Construction Engineer of Entry Level or Higher 3 │Snowline(Power 2000 │ │ │ │ │ │Name or more │horsepower or more │ │ │ │ │ │ (1) In the “National Technical Qualifications Act” │limited to │ │ │ │ │ │따른 토목기사 │) │ │ │ │ │ │ (2) 「Construction Technology Promotion Act」 │ ② Grab │ │ │ │ │ │in the civil engineering field │(grab) formula quasi- │ │ │ │ │ │Intermediate or higher construction engineer │Seal line(Capacity 6 │ │ │ │ │ │b) to any one of the following │cubic meters │ │ │ │ │ │1 of the people being victimized │or higher │ │ │ │ │ │including 「Construction Technology Promotion │) │ │ │ │ │ │in the machine field according to the "START method" │ ③ Differ │ │ │ │ │ │Entry-level or higher Construction Engineer 2 │(dipper) type │ │ │ │ │ │Name or more │Dredging vessel(Capacity │ │ │ │ │ │ (1) In the “National Technical Qualifications Act” │5 cubic meters │ │ │ │ │ │따른 건설기계설비기사 │or higher │ │ │ │ │ │ (2) 「Construction Technology Promotion Act」 │) │ │ │ │ │ │에 따른 건설기계 분야 │ ④ Bukkit │ │ │ │ │ │Intermediate or higher construction technology of START │(bucket) type │ │ │ │ │ │IN │Dredging(Power │ │ │ │ │ │ │2000hp or more │ │ │ │ │ │ │as │ │ │ │ │ │ │determines) │ │ │ │ │ │ │(Na) Preliminary (Power │ │ │ │ │ │ │200hp │ │ │ │ │ │ │thing that is a prize │ │ │ │ │ │ │-limited │ │ │ │ │ │ │) 1 or more vessels │ │ │ │ │ │ │(Da) Anchor Barge │ │ │ │ │ │ │(anchor │ │ │ │ │ │ │barge: TOP │ │ │ │ │ │ │Wheel Anchor │ │ │ │ │ │ │Cargo Carrier │ │ │ │ │ │ │, │ │ │ │ │ │ │Power 100m │ │ │ │ │ │ │Power or more │ │ │ │ │ │ │as one │ │ │ │ │ │ │determine) 1 vessel │ │ │ │ │ │ │or later │ │ │ ├─────┼────┼──────────────┼──────────┼───┼───┤ │Elevator│1) Elevator │pursuant to the "National Technical Qualifications Act" │ │Corporate │150 million│ │ㆍCableway │Pre-installation │Holders of technical qualifications in related fields │ │and │10000 │ │Construction │Construction │2 or more people │ │Individual │or later │ │ ├────┼──────────────┼──────────┤ │ │ │ │2) Cableway │a) to the “Construction Technology Promotion Act” │(A) Crane(Steel │ │ │ │ │Installation │Mechanical, Civil, and Safety Officers according to START │weight 50 │ │ │ │ │Company │matters of beginner level or higher in this field │Ton or more │ │ │ │ │ │At least one construction technician each │as done │ │ │ │ │ │b) Under the "National Technical Qualifications Act" │determines) 1 │ │ │ │ │ │따른 관련 종목의 기술자 │or more │ │ │ │ │ │2 or more qualified persons │(B) Electric Welder │ │ │ │ │ │ │(Output │ │ │ │ │ │ │30KVA │ │ │ │ │ │ │As it is a START award │ │ │ │ │ │ │(limited) 1 │ │ │ │ │ │ │or more │ │ │ │ │ │ │(Da) Power Winch │ │ │ │ │ │ │(Driving │ │ │ │ │ │ │winch: Metal │ │ │ │ │ │ │heavy object │ │ │ │ │ │ │Bump it up │ │ │ │ │ │ │or pulling │ │ │ │ │ │ │Power machine │ │ │ │ │ │ │says) 1 │ │ │ │ │ │ │or more │ │ │ │ │ │ │(D) Generator 1 │ │ │ │ │ │ │or more │ │ │ ├─────┼────┼──────────────┼──────────┼───┼───┤ │Part. Machinery Setup│1) Machine │corresponding to any of the following │ │Corporate │150 million│ │B/A │Fixture │is 2 or more people. In this case │ │and │10000 │ │S Corporation │Company │In the "Construction Technology Promotion Act" │ │Individual │or later │ │UP │ │따른 기계 분야의 초급 이상 │ │ │ │ │ │ │Construction engineer or │ │ │ │ │ │ │Technical Qualification Holder(「Mechanical Equipment │ │ │ │ │ │ │Item 1, Subparagraph 2 of Annex 2 of the Enforcement Decree of the Act │ │ │ │ │ │ │Any one of items 1) through 4) │ │ │ │ │ │ │, │ │ │ │ │ │ │determines) including at least one person │ │ │ │ │ │ │must. │ │ │ │ │ │ │a) to the “Construction Technology Promotion Act” │ │ │ │ │ │ │in the mechanical and construction fields │ │ │ │ │ │ │Construction Engineer of Entry Level or Higher │ │ │ │ │ │ │b) Under the "National Technical Qualifications Act" │ │ │ │ │ │ │따른 관련 종목의 기술자 │ │ │ │ │ │ │QualifiedPerson │ │ │ │ │ ├────┼──────────────┼──────────┤ │ │ │ │2) Gas │a) to the “National Technical Qualifications Act” │(A) Leakage Test │ │ │ │ │Facility Construction │따른 가스산업기사 이상 │Facility │ │ │ │ │Company(1 │, │(b) Pressure Test │ │ │ │ │species) │engaged in gas-related work │Facility │ │ │ │ │ │5 years of practical experience (Practical experience │(D) Magnetic Pressure │ │ │ │ │ │is under the "National Technical Qualifications Act" │Recorder │ │ │ │ │ │따른 자격을 취득하기 전 │(D) Gas Leak │ │ │ │ │ │and experience acquired after │Detector │ │ │ │ │ │(including all) greater than or equal to │(M) Air Breathing │ │ │ │ │ │1 or more people │or work │ │ │ │ │ │b) to any one of the following │output │ │ │ │ │ │1 or more of the victims │My Mas │ │ │ │ │ │ (1) 「Construction Technology Promotion Act」 │Q │ │ │ │ │ │in the civil engineering field │(bar) bolt and │ │ │ │ │ │Construction Engineer of Beginner Level or Higher │Ampere Meter │ │ │ │ │ │ (2) In the “National Technical Qualifications Act” │(Ammeter) │ │ │ │ │ │also │(사) Insulation Resistance │ │ │ │ │ │is for Gas Technician or higher │Measuring Instrument │ │ │ │ │ │Technical Qualification Holder │(500V 1,000 │ │ │ │ │ │) In any one of the following │Up to MΩ Side │ │ │ │ │ │1 or more of the people being victimized │can determine │ │ │ │ │ │ (1) In the “National Technical Qualifications Act” │is as │ │ │ │ │ │-based Welding Craftsman · Special │Limited) │ │ │ │ │ │Welding Technician or Piping │Other sides │ │ │ │ │ │Technician with Craftsmanship or higher │Jeonggi[Son │ │ │ │ │ │QualifiedPerson │Calipers │ │ │ │ │ │ (2) Engaged in gas-related work │(son │ │ │ │ │ │5 years or less of practical experience │calipers: Ah │ │ │ │ │ │and Korea Gas Safety Corporation │The moon │ │ │ │ │ │gas inspection conducted by the company │yeo thickness or │ │ │ │ │ │Construction Manager Training │Measure the diameter │ │ │ │ │ │Person who has completed START │is the mechanism │ │ │ │ │ │ │says)ㆍ │ │ │ │ │ │ │Inner and outer diameters │ │ │ │ │ │ │Chrometer │ │ │ │ │ │ │(NaewoeGyeongmi │ │ │ │ │ │ │Fine measuring instrument) │ │ │ │ │ │ │· Ultrasound side │ │ │ │ │ │ │Regular · Die │ │ │ │ │ │ │AllGauge │ │ │ │ │ │ │(gear │ │ │ │ │ │ │type measuring instrument) │ │ │ │ │ │ │·Coating Film Measurement │ │ │ │ │ │ │etc.] │ │ │ │ │ │ │(A) Various pressures │ │ │ │ │ │ │Total │ │ │ │ │ │ │(자) become standard │ │ │ │ │ │ │is a thermometer │ │ │ ├─────┼────┼──────────────┼──────────┼───┼───┤ │H. Gas ·│1) Gas │corresponding to any of the following │(A) Leakage Test │ │ │ │Nanbanggong │FacilityConstruction │is one or more of the people │Facility │ │ │ │Business │Company(2 │a) to the “National Technical Qualifications Act” │(B) Magnetic Pressure │ │ │ │ │species) │and Gas Technician or higher │Recorder │ │ │ │ │ │qualification, Korea │(Da) Gas Leakage │ │ │ │ │ │Implemented by the Safety Corporation │Detector │ │ │ │ │ │Contractor Training Course this │ │ │ │ │ │ │A person who completed │ │ │ │ │ │ │b) At the Korea Gas Safety Corporation │ │ │ │ │ │ │General facility safety officer implementing │ │ │ │ │ │ │Those who have completed the CEO training │ │ │ │ │ │ │, at the Korea Gas Safety Corporation │ │ │ │ │ │ │Construction worker training course │ │ │ │ │ │ │Person who has completed START │ │ │ │ │ │ │) The Korea Gas Safety Corporation actually │ │ │ │ │ │ │Gas facility construction management │ │ │ │ │ │ │Person who has completed the training │ │ │ │ │ │ │AM │ │ │ │ │ ├────┼──────────────┼──────────┤ │ │ │ │2) Gas │corresponding to any of the following │(A) Leakage Test │ │ │ │ │Facility Construction │is one or more of the people │Facility │ │ │ │ │Company(3 │a) in any one of the following │(B) Magnetic Pressure │ │ │ │ │species) │Acquire the technical qualification to be obtained │Recorder │ │ │ │ │ │, Korea Gas Safety Corporation │(Da) Gas Leak │ │ │ │ │ │에서 실시하는 온수보일 │Detector │ │ │ │ │ │Rush Construction Worker Training or │ │ │ │ │ │ │Hot Water Boiler Installation Manager Jayang │ │ │ │ │ │ │Person who has completed sex education │ │ │ │ │ │ │ (1) In the “National Technical Qualifications Act” │ │ │ │ │ │ │or │ │ │ │ │ │ │Hot Water Underfloor Heating Technician Lee Sang-ui │ │ │ │ │ │ │Qualified Person │ │ │ │ │ │ │ (2) At the Korea Gas Safety Corporation │ │ │ │ │ │ │General facility safety implementing │ │ │ │ │ │ │Manager Training · Urban │ │ │ │ │ │ │Gas Facility Safety Manager Yang │ │ │ │ │ │ │Sex Education·Sales Facility Safety │ │ │ │ │ │ │Manager Training or │ │ │ │ │ │ │Facility Safety Manager Yang │ │ │ │ │ │ │Person who has completed sex education │ │ │ │ │ │ │ (3) Heating work (Type 1) or │ │ │ │ │ │ │Main focus on Heating Construction (Class 2) │ │ │ │ │ │ │Person registered in the START field │ │ │ │ │ │ │b) At the Korea Gas Safety Corporation │ │ │ │ │ │ │gas facility construction officer implementing │ │ │ │ │ │ │Those who have completed the CEO training │ │ │ │ │ │ │Person │ │ │ │ │ │ │d) Heating work (Type 1) or heating │ │ │ │ │ │ │Technical Capability of Defense Defense Works (Type 2) │ │ │ │ │ │ │, Korea Gas Safety │ │ │ │ │ │ │carried out by the construction │ │ │ │ │ │ │Boiler Installation Manager Training School │ │ │ │ │ │ │complete training, and hot water boil │ │ │ │ │ │ │Completed rush installer training │ │ │ │ │ │ │person │ │ │ │ │ ├────┼──────────────┼──────────┤ │ │ │ │3) Heating │corresponding to any of the following │1 Hydrostatic Tester │ │ │ │ │Construction(No. │is 2 or more people │or later │ │ │ │ │1 type) │a) to the “National Technical Qualifications Act” │ │ │ │ │ │ │따른 관련 종목의 기술자 │ │ │ │ │ │ │QualifiedPerson │ │ │ │ │ │ │b) Under the “Construction Technology Promotion Act” │ │ │ │ │ │ │(same law │ │ │ │ │ │ │Enforcement Decree Annex 1 Item 3, Subparagraph (c) │ │ │ │ │ │ │Construction Finance & Finance, Construction │ │ │ │ │ │ │Planning and Construction Information Processing Division │ │ │ │ │ │ │Construction machine of (excluding STARTya) │ │ │ │ │ │ │Sulin │ │ │ │ │ │ │) Practical work of construction in related fields │ │ │ │ │ │ │for more than 3 years │ │ │ │ │ │ │Minister of Trade, Industry and Energy or State │ │ │ │ │ │ │as determined by the Minister of Land, Infrastructure and Transport │ │ │ │ │ │ │Person who has completed the scheduled training │ │ │ │ │ ├────┼──────────────┼──────────┤ │ │ │ │4) Heating │Technical Capability of Heating Construction (Class 1) │1 Hydrostatic Tester │ │ │ │ │Construction(No. │을 갖춘 사람 중 1명 이상 │or later │ │ │ │ │2 types) │ │ │ │ │ │ ├────┼──────────────┼──────────┤ │ │ │ │5) Heating │corresponding to any of the following │(A) Gas Analysis │ │ │ │ │Construction(No. │is one or more of the people │Unit 1 │ │ │ │ │3 types) │a) to the "National Technical Qualifications Act" │on │ │ │ │ │ │(Gold │(Na) Advertising Thermometer │ │ │ │ │ │Fast Processing · Metal Materials · Metal │(光高溫計: │ │ │ │ │ │Smelting·Ceramic Technology·Function │On with brightness │ │ │ │ │ │Limited to the field) Article │Measuring the degree │ │ │ │ │ │and construction equipment of Master Craftsman level or higher │machine say │ │ │ │ │ │Sulin │) 1 unit │ │ │ │ │ │b) Under the "National Technical Qualifications Act" │or later │ │ │ │ │ │and │(Da) Thermoelectric type also │ │ │ │ │ │Construction Technology at the Master Craftsman Level or Higher │is a resistive │ │ │ │ │ │IN │as START │ │ │ │ │ │da) Under the "National Technical Qualifications Act" │Measurement Range │ │ │ │ │ │따른 에너지관리기사 이 │is 1,200℃ │ │ │ │ │ │Construction Engineer on │or more on │ │ │ │ │ │d) Practical work of construction in related fields │Degree measuring instrument 1 │ │ │ │ │ │for more than 3 years │or more │ │ │ │ │ │Minister of Trade, Industry and Energy or State │(d) Temperature Measurement │ │ │ │ │ │As determined by the Minister of Land, Infrastructure and Transport │range is 300℃ │ │ │ │ │ │Person who has completed the scheduled training │Table of less than or equal to │ │ │ │ │ │ │Surface temperature measurement │ │ │ │ │ │ │1 or more units │ │ │ │ │ │ │(Ma) Sonjacal │ │ │ │ │ │ │Rippers and │ │ │ │ │ │ │Micromi │ │ │ │ │ │ │1 unit each │ │ │ │ │ │ │or more │ │ │ │ │ │ │(Bar) Compressive Strength │ │ │ │ │ │ │1 testing machine │ │ │ │ │ │ │or more │ │ │ │ │ │ │(Inc.) Korea Industry │ │ │ │ │ │ │specification │ │ │ │ │ │ │Specified refractory │ │ │ │ │ │ │degree(耐火度: │ │ │ │ │ │ │Heat resistant │ │ │ │ │ │ │is the degree │ │ │ │ │ │ │says) time │ │ │ │ │ │ │Suitable for testing │ │ │ │ │ │ │Refractoriness │ │ │ │ │ │ │1 measuring instrument │ │ │ │ │ │ │or more │ │ │ ├─────┼────┼──────────────┼──────────┼───┼───┤ │Geo. Facilities│ │pursuant to the "Construction Technology Promotion Act" │(A) Visual Inspection │Corporation │200 million won │ │Maintenance │ │Entry-level in Civil Engineering or Construction │Equipment: Magnifying Glass │and │or more │ │Reup │ │4 ​​people │Instruments · Telescopes │Personal │ │ │ │ │or more │and crack width │ │ │ │ │ │ │Measurement Brown Rice │ │ │ │ │ │ │around │ │ │ │ │ │ │(B) Non-destructive │ │ │ │ │ │ │for the experiment │ │ │ │ │ │ │Next Chapter │ │ │ │ │ │ │non │ │ │ │ │ │ │ ① Rebound Hardness │ │ │ │ │ │ │(反撥硬度: │ │ │ │ │ │ │Jumping │ │ │ │ │ │ │According to height │ │ │ │ │ │ │Hardness │ │ │ │ │ │ │MTQ2a4f03856d598b4400934Refers to START)Side │ │ │ │ │ │ │Regular 1 unit │ │ │ │ │ │ │on │ │ │ │ │ │ │ ② sound waves this │ │ │ │ │ │ │Measurement using │ │ │ │ │ │ │Equipment: Hammerㆍ │ │ │ │ │ │ │Chain 1 unit │ │ │ │ │ │ │on │ │ │ │ │ │ │ ③ Ultrasound │ │ │ │ │ │ │The side using │ │ │ │ │ │ │1 formal equipment │ │ │ │ │ │ │or later │ │ │ │ │ │ │(D) Magnetic Induction │ │ │ │ │ │ │InspectionEquipment: │ │ │ │ │ │ │Concrete │ │ │ │ │ │ │Coverage Measurement Device │ │ │ │ │ │ │1 to 2 │ │ │ │ │ │ │on │ │ │ │ │ │ │(d) of electricity │ │ │ │ │ │ │Corrosion inspection │ │ │ │ │ │ │CEO Equipment: Con │ │ │ │ │ │ │CreteElectric │ │ │ │ │ │ │Resistance Measurement Device │ │ │ │ │ │ │value │ │ │ │ │ │ │(resistivity), │ │ │ │ │ │ │Potential Difference Measurement │ │ │ │ │ │ │device(half │ │ │ │ │ │ │cell │ │ │ │ │ │ │potential) │ │ │ │ │ │ │Each 1 unit │ │ │ │ │ │ │on │ │ │ │ │ │ │[Presidential Decree No. 31328 │ │ │ │ │ │ │(December 29, 2020) │ │ │ │ │ │ │Attached Table 2, Subparagraph 2, Item G of │ │ │ │ │ │ │The amended provisions of the same Act │ │ │ │ │ │ │Provisions of Article 2 of the Addenda │ │ │ │ │ │ │2023 │ │ │ │ │ │ │Until December 31st │ │ │ │ │ │ │effective] │ │ │ └─────┴────┴──────────────┴──────────┴───┴───┘ Remarks 1. Technical Capability a. Persons corresponding to technical personnel are on regular employment (in the case of engaging in other businesses, on Must be a person who (limited to cases where there is no hindrance to work) and a "National Technical Personnel Persons whose qualifications have been suspended pursuant to the "Strict Regulations Act" and persons whose duties have been suspended pursuant to the "Construction Technology Promotion Act" Construction engineers who have received a disposition are excluded. b. Among the tables above, the scope of holders of technical qualifications in related fields pursuant to the "National Technical Qualifications Act" is It shall be in accordance with the provisions determined by the Minister of Land, Infrastructure and Transport. . Among the tables above, holders of technical qualifications in related fields pursuant to the "National Technical Qualifications Act" are "National 6 months conducted at a vocational competency development training facility pursuant to the "Lifelong Vocational Competency Development Act" Persons who have completed a vocational training course in a related field of at least [length] or [length] years of experience in a related field [] A person who has been engaged in the work for 3 years or more and is affiliated with an association or other business designated by the Minister of Land, Infrastructure and Transport A person recognized by the organization as having the ability may be substituted. d. Civil engineering as a registration standard for civil engineering business, building construction business, or civil and building construction business, or refers to construction engineers in the architectural field (civil engineers, engineers of intermediate level or higher in the civil engineering field, One of the following (excluding architectural engineers and technicians of intermediate level or higher in the field of architecture) is May be substituted by a construction engineer of entry-level or higher in the field of machinery or safety management. E. A person registered for civil engineering business or civil engineering and construction business [regarding] the "Promotion of water reuse and Construction of a wastewater reuse facility pursuant to Article 2, Subparagraph 7 of the Act on Support for... In cases where technical personnel who can be jointly utilized are subject to the "National Technical Qualifications Act," One civil engineer is deemed to already be qualified. B. Among the business contents of the main field of Heating Construction (Type 1), gas boilers (「Energy Utilization Rationalization (Limited to cases where it is equipment subject to inspection pursuant to Article 39, Paragraph 1 of the Act) a person intending to construct In addition, Ram shall have at least one person holding a technical qualification in the gas field pursuant to the "National Technical Qualifications Act" and must be equipped with at least one airtightness test facility, one self-recording pressure gauge, and one gas leak detector . 2. Facilities & Equipment a. The equipment in the table above must be registered as self-owned, and among the equipment in the table above, 「Railway Type approval pursuant to Article 26 of the Safety Act, detailed safety diagnosis pursuant to Article 38-12 of the same Act, Inspection pursuant to Article 13, Paragraph 1 of the "Construction Machinery Management Act" or Article 7 of the "Ship Safety Act" Equipment subject to inspection pursuant to the provisions of Articles 1 to 10 is, as stipulated in the relevant statutes The equipment must have completed type approval, precise safety diagnosis, or inspection. However, heating In the case of Class 3 construction work, leased equipment may be used as a substitute. B. The equipment in the table above is recognized as having performance equal to or greater than that of the equipment in question. . 3. Capital a. In the case of a corporation other than a joint-stock company, contributed capital shall be considered capital. b. When capital stock is greater than the amount obtained by subtracting total liabilities from total assets, total liabilities from total assets shall be the capital stock. In this case, the calculation of total assets and total liabilities shall be [ ] "Company It shall be in accordance with the accounting standards pursuant to Article 5 of the Act on External Audits of etc. . Interior construction business, metal, window/door, roofing, and building assembly business, painting, wet, waterproofing, A person engaged in the stone masonry business who [possesses] a Master Craftsman in the construction field pursuant to the National Technical Qualifications Act In the case of a limited liability company, the minimum capital requirement for the relevant industry shall be reduced by half. d. In addition to the provisions of subparagraphs a through c, the standards and methods for calculating capital are [ ] It shall be as determined by the Minister of Trade.