Annex 8 — 건설기술 진흥법 시행령

286847 · 2026-06-09

■ Enforcement Decree of the Construction Technology Promotion Act [Table 8] <Amended Mar. 5, 2024> Standards for Management of Penalty Points in Construction Works, etc. (Related to Article 87, Paragraph 5) 1. The meanings of the terms used in this table are as follows. a. "Penalty points" refers to the penalty point measurement standards under Subparagraph 5 applied by the measuring agency to companies and construction engineers, etc. . b. "Company" means a construction business operator pursuant to subparagraphs 1 through 3 of Article 53, Paragraph 1 of the Act, housing Registered construction business operators and construction engineering business operators (in accordance with the first part of Article 23, Paragraph 4 of the Architects Act) refers to (including the founder of an architectural firm). "Construction engineers, etc." refers to construction engineers employed by a company and those referred to in Article 2, Paragraph 1 of the "Architects Act." . la.┌──────┬───────────────────────────────┐ "Major structural parts" means structural parts corresponding to any of the following tables and equivalents │Classification │Main Structural Parts │ ├──────┼───────────────────────────────┤ │Building │Load-bearing walls, columns, floors, beams, roofs, foundations, main stairs │ ├──────┼───────────────────────────────┤ │Plant │Foundation, Equipment Supporter │ ├──────┼───────────────────────────────┤ │Bridge │Foundation, Abutment, Pier, Girder, Concrete Slab, Frame Structure, Bridge │ │ │Bearings, main towers, cable sections, anchorage sections │ ├──────┼───────────────────────────────┤ │tunnel │Shotcrete, Rock Bolts, Steel Supports, Reinforced Concrete Lining, Segment Lining │ │ │ning, Invert Concrete, Portal Slope │ ├──────┼───────────────────────────────┤ │Road │Roadway, median strip, side road, cut section, fill section │ ├──────┼───────────────────────────────┤ │Railway │Concrete track, platform, underground station structure, underpass, underpass, female │ │ │Passageway │ ├──────┼───────────────────────────────┤ │Airport │Runway, taxiway, apron │ ├──────┼───────────────────────────────┤ │Waste·Disposal│Foundation, Concrete Structure, Equipment Supporter │ │Water Treatment Plant │ │ ├──────┼───────────────────────────────┤ │Water & Sewerage │Reinforced concrete structure, steel structure, water tunnel, pipe joint │ ├──────┼───────────────────────────────┤ │Sewer/Wastewater │Water tank structure, sluice gate structure, pump station structure │ │Treatment Plant │ │ ├──────┼───────────────────────────────┤ │Drainage Pump Station │Sedimentation tank, absorption tank, discharge tank, inflow gate, discharge gate, culvert, clearance │ ├──────┼───────────────────────────────┤ │Ports & Fishing Ports │Concrete floor slab, concrete sheet pile, retaining wall, steel pile, steel sheet pile, │ │ │Superstructure, Vertical section, Concrete block, Caisson, Rubble slope, Breakwater, Equipment│ │ │Chobu │ ├──────┼───────────────────────────────┤ │Stream │Estuary dam, weir, sluice gate body, gate frame, embankment, revetment │ ├──────┼───────────────────────────────┤ │dam │Main body, spillway, foundation, both sides, spillway sluice gate, intake structure │ ├──────┼───────────────────────────────┤ │Retaining Wall │Ground, foundation, front, drainage facilities, upper slope │ ├──────┼───────────────────────────────┤ │Cut Slope │Upper natural slope, slope, lower slope, protection facilities, reinforcement facilities, during drainage treatment │ │ │Installation, facilities within separation distance │ ├──────┼───────────────────────────────┤ │Utility District │Common Utility Main Body │ ├──────┼───────────────────────────────┤ │cableway │Upper anchor, lower anchor, support, cable │ └──────┴───────────────────────────────┘ It refers to a structural member that performs a major functional role as a START. e. "Other structural parts" refers to structural parts that are not major structural parts. B. "Major facility plan" refers to cities and counties pursuant to the "Act on Planning and Utilization of National Land" Management plan, installation of facilities pursuant to the "Special Act on the Safety and Maintenance of Facilities" Plans for installation, maintenance, or improvement, land use plans for individual projects, and other projects Refers to the plan for the installation of essential facilities to achieve the purpose. d. "Other facility plans" refers to facility plans that are not major facility plans. A. "Major structures" refers to structures included in the major facility plan. J. "Other structures" means structures that are not major structures. . "Drainage facilities" refers to drainage pipes, drainage structures, drainage equipment, etc., for rainwater and sewage Refers to facilities for drainage, and including other drainage facilities necessary at the construction site. . K. "Waterproofing facility" refers to asphalt, sealing material, epoxy, cement mortar, synthetic resin, etc. for waterproofing, moisture-proofing, refers to a facility that prevents leakage. Ta. "Construction machinery and equipment" refers to machinery and equipment operated by power, as defined in the "Industrial Safety and Health Act" Hazardous or dangerous machinery and equipment pursuant to Article 80, Paragraph 1, and Article 2 of the Construction Machinery Management Act Construction machinery pursuant to Paragraph 1, Item 1, and other machinery primarily used in construction work · refers to the mechanism. Part. "Allowable crack width of a structure" refers to the durability, watertightness, serviceability, and Refers to the allowable crack width for maintaining pipes, etc. H. "Reconstruction" refers to defective parts resulting from structural damage, etc., after the construction of the object of construction Referring to the complete demolition and reconstruction, or the carrying out of overall repair and reinforcement. . In "repair and reinforcement," repair refers to restoring or improving the durability performance of a facility. Referring to the mechanical properties such as load-bearing capacity or stiffness of members or structures, reinforcement refers to... refers to restoring or improving performance. . "Minor repair" refers to restoring function or improving a defective part through simple repairs. refers to causing. more. "Demand forecasting" refers to the determination of whether to proceed with construction work, the scale of facilities, and surrounding areas affected by the construction work To utilize data analysis techniques such as estimation models for the analysis of impact on the region, etc. , transportation demand, aviation-induced demand, aviation diversion demand, demand for domestic, industrial, and agricultural water, refers to forecasting power generation demand, etc. 2. Penalty Points Applicable The measuring agency shall, in cases corresponding to the deficiencies specified in the penalty point measurement criteria of Subparagraph 5 and related thereto . However, in accordance with relevant laws and regulations, construction work Cases in which any of the following dispositions have been received in relation to the company's insolvency shall be excluded. a. Suspension of business pursuant to Article 24 of the Act b. Cancellation of registration or suspension of business pursuant to Article 31 of the Act . Suspension of business and cancellation of registration pursuant to Articles 82 and 83 of the Framework Act on the Construction Industry a. Cancellation of registration or suspension of business pursuant to Article 8 of the Housing Act E. Restrictions on bidder eligibility pursuant to Article 27 of the Act on Contracts to Which the State is a Party [Article 5, Subparagraph (a) 1)a)ㆍb), Subparagraph 11)a), Subparagraph 14)c), Subparagraph 15)a), Subparagraph 16) and 18), and construction engineering firms that have performed construction engineering poorly Targeting business operators only] B. Revocation or suspension of qualification pursuant to Article 16 of the National Technical Qualifications Act d. Any dispositions pursuant to the provisions of subparagraphs (a) through (f) imposed in accordance with other relevant laws and regulations Administrative disposition doing START 3. Penalty Point Calculation Method a. From the sum of all penalty points received by the company or construction engineer, etc. during the relevant half-year, the half-yearly [ ] The score minus the deduction points is set as the corresponding semi-annual penalty point. B. The total penalty points are the sum of the semi-annual penalty points of the relevant company or construction engineer, etc. over the past two years It shall be the value divided by 2. 4. Penalty Application Criteria a. Pursuant to Article 53, Paragraph 2 of the Act, the contracting authority [may] [regarding] the entry [regarding] companies and construction engineers, etc. that have received penalty points When conducting the preliminary screening of eligibility for participation, points shall be deducted according to the classifications in the table below, provided that this If it is unsuitable to apply the standard, a separate standard may be established. ┌──────────┬─────────┐ │Total Penalty Points │Deducted points (points) │ ├──────────┼─────────┤ │1점 이상 2점 미만 │0.2 │ ├──────────┼─────────┤ │2점 이상 5점 미만 │0.5 │ ├──────────┼─────────┤ │5점 이상 10점 미만 │1 │ ├──────────┼─────────┤ │10점 이상 15점 미만 │2 │ ├──────────┼─────────┤ │15점 이상 20점 미만 │3 │ ├──────────┼─────────┤ │20점 이상 │5 │ └──────────┴─────────┘ B. The cumulative penalty points shall be applied starting from the day two months after the last day of each half-year. Penalty points are carried over even if construction engineers, etc. change the industry in which they work. 5. Penalty Point Measurement Criteria Penalty points for companies and construction engineers, etc., for each individual unit of substandard work according to the criteria in each of the following subparagraphs shall be imposed respectively. However, limited to companies or construction engineers, etc. in the tables of each of the following items . ┌──┬─────────────────────────────────┬──┐ A. Criteria for Measuring Penalty Points for Construction Business Operators, Registered Housing Construction Operators, and Construction Engineers │Number│Major Non-performing Details │Penalty Point│ ├──┼─────────────────────────────────┼──┤ │1) │Defectiveness in earthworks │ │ │ │ │ │ │ │ a) Foundation excavation and cutting (earth cutting) and filling (earth filling), etc. (hereinafter referred to as "earthworks") │3 │ │ │) differently from the design documents (including relevant standards; hereinafter the same) │ │ │ │In the case where soil collapse occurs │ │ │ │ │ │ │ │ b) In the case where ground subsidence occurs due to earthwork being performed differently from the design documents │2 │ │ │ │ │ │ │ c) Soil collapse or ground subsidence caused by negligence in the construction and management of earthworks │1 │ │ │occurs, │ │ ├──┼─────────────────────────────────┼──┤ │2) │Occurrence of cracks in concrete surface │ │ │ │ │ │ │ │ a) When cracks larger than the allowable crack width of the structure occurred in the main structural parts │3 │ │ │Failure to perform crack management for repair and reinforcement, including cause analysis such as START or structural review, │ │ │ │In cases where repair and reinforcement (specific repair and reinforcement plan established ) │ │ │ │case is excluded. (The same applies hereinafter in this number) case where │ │ │ │ │ │ │ │ b) If a crack larger than the allowable crack width of the structure occurs in other structural parts │2 │ │ │However, cause analysis such as structural review and crack management for repair and reinforcement are performed │ │ │ │In cases where it is not done or repairs/reinforcement are not performed │ │ │ │ │ │ │ │ ) Cracks smaller than the allowable crack width of the structure occurred in the main structural parts │1 │ │ │However, management regarding the progression of cracks and failure to perform repair and reinforcement │ │ │ │case │ │ │ │ │ │ │ │ d) Cracks smaller than the allowable crack width of the structure occur in other structural parts │0.5 │ │ │However, management regarding the progression of cracks and repair/reinforcement were not carried out │ │ │ │, │ │ ├──┼─────────────────────────────────┼──┤ │3) │Occurrence of concrete material segregation │ │ │ │ │ │ │ │ a) Although rebar exposure occurred in the main structural parts, repair and reinforcement (rebar exposure │3 │ │ │or identify the location of material separation to provide a specific repair and reinforcement plan │ │ │ │Cases where [the same applies hereinafter in this number] were not performed are excluded. │ │ │ │U │ │ │ │ │ │ │ │ b) Rebar exposure occurred in other structural parts, but repairs and reinforcement were not performed │2 │ │ │If not │ │ │ │ │ │ │ │ c) Material segregation of 0.1㎡ or more in main structural parts and other structural parts │1 │ │ │In cases where appropriate repair and reinforcement measures were not taken despite │ │ ├──┼─────────────────────────────────┼──┤ │4) │Defects in the arrangement and assembly of reinforcing bars and the assembly, welding, and construction conditions of steel structures │ │ │ │ │ │ │ │ a) Repair and reinforcement required in 3 or more locations per member due to poor construction of major structural parts │3 │ │ │If necessary │ │ │ │ │ │ │ │ b) In cases where repair or reinforcement is required due to poor construction of major structural parts │2 │ │ │ │ │ │ │ c) Cases where repair or reinforcement is required due to poor construction of other structural parts │1 │ ├──┼─────────────────────────────────┼──┤ │5) │Defective drainage condition │ │ │ │ │ │ │ │ a) By constructing the drainage facilities differently from the design documents and local conditions, the drainage device │2 │ │ │If ability is lost │ │ │ │ │ │ │ │ b) By constructing the drainage facilities differently from the design documents and local conditions, the drainage device │1 │ │ │If function is impaired │ │ │ │ │ │ │ │ ) There is a concern that damage such as flooding may occur due to poor management of drainage facilities │0.5 │ │ │exists │ │ ├──┼─────────────────────────────────┼──┤ │6) │Leakage due to waterproofing failure │ │ │ │ │ │ │ │ a) If leakage occurs in the waterproofing facility and repair/reinforcement of 1/2 or more of the waterproofing area │2 │ │ │Steel (excluding cases where a specific repair and reinforcement plan has been established. Hereinafter │ │ │ │(same as this number) if needed │ │ │ │ │ │ │ │ b) In cases where repair or reinforcement is required due to leakage in waterproofing facilities │1 │ │ │ │ │ │ │ c) In cases where repair or reinforcement is required due to poor construction of waterproofing facilities │0.5 │ ├──┼─────────────────────────────────┼──┤ │7) │Construction project management engineers (if construction project management engineers are not assigned at each construction stage │ │ │ │In cases where it is not required, it refers to the construction supervisor. The same applies hereinafter in this number) │ │ │ │, │ │ │ │ │ │ │ │ a) Review and confirmation by a construction project management engineer regarding the main structural parts │3 │ │ │In the case of construction without START │ │ │ │ │ │ │ │ b) Review and confirmation by a construction project management engineer regarding other structural parts │2 │ │ │In the case of construction performed without receiving START │ │ │ │ │ │ │ │ c) Delaying the implementation of instructions by a construction project management engineer without justifiable reason │1 │ │ │is performed │ │ ├──┼─────────────────────────────────┼──┤ │8) │Negligence in preparing construction detail drawings │ │ │ │ │ │ │ │ a) Due to negligence in preparing construction detail drawings for the main structural parts, re-posting │3 │ │ │If a ball is needed │ │ │ │ │ │ │ │ b) Neglecting the preparation of construction detail drawings for major structural parts, resulting in repairs │2 │ │ │· Reinforcement (excluding minor repairs and reinforcements. The same applies hereinafter in this number) │ │ │ │is required, │ │ │ │ │ │ │ │ d) Neglecting the preparation of construction detail drawings for other structural parts [ │1 │ │ │If reinforcement is required │ │ ├──┼─────────────────────────────────┼──┤ │9) │Process sluggishness due to negligence in process management │ │ │ │ │ │ │ │ a) to make up for the delayed schedule from the construction project management engineer │1 │ │ │Failed to establish measures without justifiable grounds after being requested to do so │ │ │ │case │ │ │ │ │ │ │ │ b) Construction is being delayed due to negligence in process management, but without justifiable reason │0.5 │ │ │If countermeasures are insufficient │ │ ├──┼─────────────────────────────────┼──┤ │10) │Temporary structures under each subparagraph of Article 101-2, Paragraph 1 (hereinafter referred to as "temporary structures") │ │ │ │Defective installation status │ │ │ │ │ │ │ │ a) In the event that a construction accident occurs due to faulty installation of a temporary structure │3 │ │ │ │ │ │ │ b) Defective installation of temporary structures (preparation of construction plan and construction detail drawings │2 │ │ │Repair and reinforcement (including cases where minor repair and reinforcement are not performed) │ │ │ │(Exclude) If necessary │ │ ├──┼─────────────────────────────────┼──┤ │11) │Negligence in safety management measures at construction sites │ │ │ │ │ │ │ │ a) In the event that a serious construction accident occurs pursuant to Article 105, Paragraph 3 │3 │ │ │ │ │ │ │ b) In the case where required corrective actions are not implemented as a result of a regular safety inspection │3 │ │ │or failure to conduct regular safety inspections within the period without justifiable reason │ │ │ │, │ │ │ │ │ │ │ │ c) The head of the contracting authority or licensing agency regarding the safety management plan Article 98 │2 │ │ │Matters requiring supplementation despite a conditionally favorable determination under Paragraph 5, Subparagraph 2 │ │ │ │or various construction uses │ │ │ │failed to install safety facilities, etc. in accordance with the safety management plan │ │ │ │In case of concern for accidents │ │ ├──┼─────────────────────────────────┼──┤ │12) │Insufficient establishment and implementation of quality control plans or quality test plans │ │ │ │ │ │ │ │ a) The head of the contracting authority or licensing agency [regarding] the quality control plan or quality test │2 │ │ │A conditional appropriate determination was made regarding the plan pursuant to Article 90, Paragraph 2, Subparagraph 2. │ │ │ │If construction proceeds without supplementing necessary matters or requirements, │ │ │ │ │ │ │ │ b) Quality testing and inspection differently from the quality control plan or quality testing plan │1 │ │ │MTQ36257fe1277c294d00246 If START is performed │ │ ├──┼─────────────────────────────────┼──┤ │13) │Insufficient securing of test laboratory size, test equipment, or construction engineers │ │ │ │ │ │ │ │ a) Test laboratories and test equipment in accordance with the quality control plan or quality test plan │3 │ │ │If construction engineers are not equipped or are assigned to perform quality control duties │ │ │ │If not │ │ │ │ │ │ │ │ b) In cases where the placement standards for test rooms, test equipment, or construction engineers are not met, │2 │ │ │A construction engineer performing quality control duties, other than those listed in each subparagraph of Article 91, Paragraph 3 │ │ │ │without the approval of the head of the contracting authority or licensing agency │ │ │ │case │ │ │ │ │ │ │ │ d) Persons who have not completed the education and training pursuant to Article 20, Paragraph 2 of the Act Quality │1 │ │ │In the case of assigning a construction engineer performing management │ │ │ │ │ │ │ │ d) Leaving a malfunction of test equipment unattended (except where replacement equipment is available) │0.5 │ │ │if the test cannot be conducted or if equipment past its validity period is used │ │ │ │case │ │ ├──┼─────────────────────────────────┼──┤ │14) │Defective condition of management of construction materials and machinery and equipment │ │ │ │ │ │ │ │ a) Construction equipment that does not meet the standards or has not received approval from the contracting authority │3 │ │ │In case of bringing in or using systems, equipment, or major materials │ │ │ │ │ │ │ │ b) Construction machinery and equipment installed or dismantled differently from the installation standards │2 │ │ │case │ │ │ │ │ │ │ │ d) In cases where the quality is affected due to poor storage conditions of materials │1 │ ├──┼─────────────────────────────────┼──┤ │15) │Negligence in the concrete pouring and curing process │ │ │ │ │ │ │ │ a) If concrete mix design is not performed or verified, con │3 │ │ │If a concrete pouring plan has not been established, the timing of formwork removal or │ │ │ │If the pouring sequence is not observed, or if the standards are intentionally exceeded, Ready-mix │ │ │ │In the case of averaging down on cones │ │ │ │ │ │ │ │ b) Slump test, salt content test, compressive strength test or curing management │1 │ │ │If not performed, record the production/arrival time or pouring completion time. │ │ │ │· If not managed │ │ ├──┼─────────────────────────────────┼──┤ │16) │Defective site management conditions of ready-mix concrete plants (including asphalt concrete plants) │ │ │ │ │ │ │ │ a) If the weighing device is not calibrated or if the standard is intentionally exceeded │3 │ │ │In the case of diluting ready-mix concrete │ │ │ │ │ │ │ │ b) If aggregates are not stored separately by specification or the aggregate management status is [unclear] │2 │ │ │In the event of inhalation, do not operate the automatic recording device or fail to store the recording paper. │ │ │ │In the case where it is not done, if the production temperature of the asphalt concrete falls below the standard │ │ │ │ │ │ │ │ d) In the case where quality testing is inadequate or equipment defects are neglected │1 │ ├──┼─────────────────────────────────┼──┤ │17) │Poor condition of asphalt paving and compaction │ │ │ │ │ │ │ │ a) In cases where the test paving prescribed in the specifications has not been performed │2 │ │ │ │ │ │ │ b) In case of insufficient field compaction density or pavement thickness │1 │ │ │ │ │ │ │ d) If the mixture temperature control standard is not met or is exceeded, flatness measurement │0.5 │ │ │If the result exceeds the specification standard │ │ ├──┼─────────────────────────────────┼──┤ │18) │Construction different from the design documents │ │ │ │ │ │ │ │ a) Requiring reconstruction due to major structural components being constructed differently from the design documents │3 │ │ │case │ │ │ │ │ │ │ │ b) Repair and reinforcement due to construction of major structural parts differently from the design documents (minor │2 │ │ │Repair and reinforcement are excluded. (The same applies hereinafter in this number) if necessary │ │ │ │ │ │ │ │ d) If other structural parts are constructed differently from the design documents, repair and reinforcement │1 │ │ │If necessary │ │ ├──┼─────────────────────────────────┼──┤ │19) │Defect in measurement management │ │ │ │ │ │ │ │ a) If measuring equipment is not installed or the measuring equipment is not operating │2 │ │ │is the case │ │ │ │ │ │ │ │ b) The number of measurements stipulated in the design documents (including matters discussed at the time of contract) │1 │ │ │In case of underestimation or incorrect measurement │ │ │ │ │ │ │ │ d) In cases where measurement management is neglected, such as exceeding the measurement deadline │0.5 │ └──┴─────────────────────────────────┴──┘ ┌──┬─────────────────────────────────┬──┐ B. Construction project management service providers and construction project managers performing construction project management during the construction phase │Number│주요 부실내용 │Penalty Point│ ├──┼─────────────────────────────────┼──┤ │1) │Negligence in verifying at each stage whether construction was carried out in accordance with the design documents │ │ │ │ │ │ │ │ a) Failure to perform review and verification procedures for major structural parts or design │3 │ │ │If re-construction is required due to deviation from the drawings │ │ │ │ │ │ │ │ b) Failure to perform review and verification procedures for major structural parts or design │2 │ │ │Repair and reinforcement made differently from the drawings (excluding minor repairs and reinforcement. │ │ │ │(as in this number below) if required │ │ │ │ │ │ │ │ d) Failure to perform review and verification procedures for other structural parts or │1 │ │ │In cases where repair or reinforcement is required due to deviation from the drawings │ │ │ │ │ │ │ │ d) In other cases where verification inspection is omitted or due to delay in inspection work, ... │0.5 │ │ │In the event of a disruption in the planned process (based on the monthly planned process, 10% or less │ │ │ │refers to cases where a disruption occurs. The same applies hereinafter) │ │ ├──┼─────────────────────────────────┼──┤ │2) │Negligence in reviewing construction detail drawings │ │ │ │ │ │ │ │ a) Failure to perform the review procedure for construction detail drawings of major structural parts or the │3 │ │ │If re-construction is required due to deviation from the established standards │ │ │ │ │ │ │ │ b) Failure to perform the review procedure for construction detail drawings of major structural parts or │2 │ │ │Repair and reinforcement in a manner different from the relevant standards (excluding minor repairs and reinforcements │ │ │ │. (The same applies to this number below) If required, │ │ │ │ │ │ │ │ d) Failure to perform the review procedure for other structural construction detail drawings or │1 │ │ │In cases where repair or reinforcement is required differently from the relevant standards │ │ ├──┼─────────────────────────────────┼──┤ │3) │Negligence in inspection of completed work and final inspection pursuant to Article 59, Paragraph 3, Subparagraph 10 │ │ │ │ │ │ │ │ a) In the event that major structural parts require reconstruction after inspection │3 │ │ │ │ │ │ │ b) If repair or reinforcement of major structural parts is required after inspection │2 │ │ │ │ │ │ │ c) In cases where matters requiring repair or reinforcement of other structural parts arise after inspection │1 │ │ │ │ │ │ │ d) In the event that the planned process is disrupted due to inspection delays │0.5 │ ├──┼─────────────────────────────────┼──┤ │4) │Construction plan of a construction business operator or registered housing construction business operator (hereinafter referred to as the "Contractor") │ │ │ │Negligence in verifying pre-management │ │ │ │ │ │ │ │ a) If the safety management plan has not been reviewed and verified, the periodic safety inspection │3 │ │ │An institution that does not perform regular inspections or is not designated as a safety inspection agency │ │ │ │In cases where a safety inspection was conducted but corrective instructions, etc. were not issued, periodic safety │ │ │ │If the implementation of corrective action requirements is not confirmed as a result of the inspection │ │ │ │ │ │ │ │ b) If the contractor fails to submit the safety management plan for more than 1 month without justifiable reason │2 │ │ │In the case where there was a delay but necessary corrective measures were not taken │ │ ├──┼─────────────────────────────────┼──┤ │5) │Negligence in reviewing and verifying design changes │ │ │ │ │ │ │ │ a) Failure to take action after verifying the design documents, resulting in the main structural parts after construction │2 │ │ │In case a reason for design change occurs │ │ │ │ │ │ │ │ b) Other structures after construction due to failure to take measures after verifying the design documents │1 │ │ │In the event that a reason for a design change occurs in the START section or when reflecting design changes │ │ │ │If not │ │ │ │ │ │ │ │ d) Delaying the review of design changes without justifiable reason [due to] the planned process │0.5 │ │ │, │ │ ├──┼─────────────────────────────────┼──┤ │6) │Negligence in reviewing construction plans and schedules │ │ │ │ │ │ │ │ a) Due to the failure to issue corrective instructions, etc. after reviewing the construction plan and schedule, major │2 │ │ │If re-construction of the grandfather is required │ │ │ │ │ │ │ │ b) Due to the failure to issue corrective instructions, etc. after reviewing the construction plan and schedule, major districts │1 │ │ │Repair and reinforcement of the structure (excluding minor repair and reinforcement. Hereinafter referred to in this number │ │ │ │) if needed │ │ │ │ │ │ │ │ d) Failure to issue corrective instructions, etc., after reviewing the construction plan and schedule, other │0.5 │ │ │In cases where repair or reinforcement of structural parts is required or a delay occurs in the planned schedule │ │ │ │or approval of changes to the construction plan and schedule due to design change factors │ │ │ │If not performed in accordance with relevant standards │ │ ├──┼─────────────────────────────────┼──┤ │7) │Establishment of a quality control plan or quality test plan and review of test results │ │ │ │Thorough │ │ │ │ │ │ │ │ a) Failure to conduct a review of the plans or test results submitted by the contractor │3 │ │ │In cases where the contractor does not have a test laboratory or test equipment, or the quality control officer │ │ │ │Even though construction engineers performing the duties were not assigned, the rectification... │ │ │ │MTQ36257fe1277c294d00358 If START, etc. are not performed │ │ │ │ │ │ │ │ b) Execute the review procedure for the plans or test results submitted by the Contractor │2 │ │ │Cases requiring repair or reinforcement due to failure to do so or acting differently from relevant standards │ │ │ │or construction machinery performing laboratory, test equipment or quality control duties │ │ │ │If the qualifications of a technician fall below the standards, or if the person performing quality control duties... │ │ │ │A construction engineer performing tasks other than those listed in each subparagraph of Article 91, Paragraph 3, with the contracting authority or license/authorization │ │ │ │Even though it was performed without the approval of the head of the institution, corrective instructions, etc. were not issued │ │ │ │is the case │ │ │ │ │ │ │ │ d) Omitting some items during quality testing or insufficient number of tests │1 │ │ │If corrective instructions, etc. were not issued despite execution │ │ │ │ │ │ │ │ d) Leaving a malfunction of test equipment unattended (excluding cases where replacement equipment is available │0.5 │ │ │Even if the test cannot be conducted or the equipment's validity period has expired │ │ │ │If a stop instruction, etc. is not given │ │ ├──┼─────────────────────────────────┼──┤ │8) │Negligence in reviewing and verifying the conformity of construction materials and machinery/equipment │ │ │ │ │ │ │ │ a) Failure to implement necessary measures regarding the introduction and use of construction machinery and equipment │2 │ │ │Not meeting standards or not having received approval from the contracting authority, etc. │ │ │ │In cases where construction machinery or equipment is used │ │ │ │ │ │ │ │ b) Major materials (rebar, steel frames, ready-mix concrete, asphalt concrete, etc., which are essential at construction sites│1 │ │ │Failure to implement the quality verification procedures of (referring to materials used) or │ │ │ │or related standards │ │ │ │ │ │ │ │ d) Failure to implement quality verification procedures for other materials or failure to comply with relevant standards and │0.5 │ │ │If done differently │ │ ├──┼─────────────────────────────────┼──┤ │9) │Negligence in reviewing documents submitted by the contractor and delay in processing │ │ │ │ │ │ │ │ a) If there is a disruption to the planned schedule due to delay in processing submitted documents without justifiable reason │2 │ │ │When it occurs or repair/reinforcement is required │ │ │ │ │ │ │ │ b) Failure to perform the review procedure for submitted documents without justifiable grounds or related │1 │ │ │Repair and reinforcement performed differently from the standards (excluding minor repairs and reinforcement) │ │ │ │is required, │ │ │ │ │ │ │ │ d) Failure to perform the review procedure for submitted documents without justifiable reason or related │0.5 │ │ │If a delay in the planned schedule occurs due to deviation from the standard END │ │ ├──┼─────────────────────────────────┼──┤ │10) │Maintenance of records or reporting on the scope of work of construction project management pursuant to Article 59 │ │ │ │neglect │ │ │ │ │ │ │ │ a) Failure to implement record-keeping or reporting procedures or differs from relevant standards │2 │ │ │...causing repair and reinforcement (excluding minor repair and reinforcement) to be required │ │ │ │case │ │ │ │ │ │ │ │ b) Failure to implement record-keeping or reporting procedures or deviations from relevant standards │1 │ │ │, │ │ ├──┼─────────────────────────────────┼──┤ │11) │Negligence in construction project management duties, etc. │ │ │ │ │ │ │ │ a) In the event of unqualified or insufficient personnel of construction project management engineers (construction │2 │ │ │Applicable only to construction project management service providers) │ │ │ │ │ │ │ │ b) In the case where a construction project management engineer leaves the site without permission (construction project │2 │ │ │Applies only to management technicians) │ │ ├──┼─────────────────────────────────┼──┤ │12) │The matter of deciding to perform construction project management duties during the pre-qualification screening for bidders │ │ │ │Arbitrary change of construction project management engineer or negligence in management (Construction project management service business │ │ │ │(Applies only to users) │ │ │ │ │ │ │ │ a) In the case of replacing a construction project management engineer without obtaining approval from the client │2 │ │ │Right, in the case where 50% or more of the construction project management engineers have been replaced (the relevant construction site │ │ │ │In the case of placement in a position for 3 years or more, in the case of retirement, enlistment, immigration, or death, Q │ │ │ │In cases where medical treatment for 3 months or more is required due to illness or injury, 3 months or more public │ │ │ │In the event that the commencement of construction is delayed or the progress is suspended, or in other cases where the contracting authority must │ │ │ │Cases deemed necessary are excluded. (The same applies hereinafter in this number) │ │ │ │ │ │ │ │ b) A construction project management engineer in the same field three or more times without substantial reason │1 │ │ │If replaced │ │ ├──┼─────────────────────────────────┼──┤ │13) │Negligence in measures to address various civil complaints related to the execution of construction │ │ │ │ │ │ │ │ a) The rights of nearby residents due to the occurrence of environmental pollution (water pollution, pollution, or noise) │2 │ │ │In cases where collective complaints arise due to the infringement of interests, without justifiable grounds │ │ │ │If preventive measures were not taken │ │ │ │ │ │ │ │ b) Regarding construction management, such as soil erosion and flooding during the execution of construction, civil complaints │1 │ │ │In the case where a cause has occurred and preventive measures have not been taken │ │ ├──┼─────────────────────────────────┼──┤ │14) │Negligence in implementing instructions from the contracting authority │ │ │ │ │ │ │ │ a) The contracting authority's guidance due to changes in specifications or project plans, etc. │2 │ │ │Repair and reinforcement due to failure to implement requirements (excluding minor repairs and reinforcement) │ │ │ │) If this is required │ │ │ │ │ │ │ │ b) The contracting authority's guidance due to changes in specifications or project plans, etc. │1 │ │ │In the event that a delay occurs in the planned schedule due to failure to implement the requirements │ │ ├──┼─────────────────────────────────┼──┤ │15) │Among the duties pursuant to Article 59, Paragraph 3, Subparagraph 3, the temporary structure, construction detail drawings and │ │ │ │Negligence in verifying whether it was installed in accordance with the contents of the fire station │ │ │ │ │ │ │ │ a) Temporary structures shall be installed in accordance with the construction detail drawings and specifications │3 │ │ │has not been checked │ │ │ │ │ │ │ │ b) Temporary structures shall be installed in accordance with the construction detail drawings and specifications │2 │ │ │In cases where compliant was confirmed despite not being START │ │ ├──┼─────────────────────────────────┼──┤ │16) │Construction project management supporting construction project management engineers stationed at the construction site │ │ │ │On-site construction status of technical personnel (hereinafter referred to as "technical support technical personnel" in this table) │ │ │ │Negligence in inspection │ │ │ │ │ │ │ │ a) The number of field inspections since performing duties as a technical support technician is │1 │ │ │Detailed standards determined and notified by the Minister of Land, Infrastructure and Transport pursuant to Article 59, Paragraph 7 │ │ │ │without justifiable reason │ │ │ │ │ │ │ │ b) The number of field inspections after performing duties as a technical support technician is │0.5 │ │ │Detailed standards determined and notified by the Minister of Land, Infrastructure and Transport pursuant to Article 59, Paragraph 7 │ │ │ │without justifiable reason │ │ ├──┼─────────────────────────────────┼──┤ │17) │Defect Liability Period Occurrence of Defect │ │ │ │ │ │ │ │ a) In relation to the scope of construction project management tasks during the construction phase, the "Construction Industry Standards and Regulations │2 │ │ │Three or more times within the defect liability period pursuant to Article 28, Paragraph 1 of the Act │ │ │ │(referring to defects pursuant to Article 82, Paragraph 1, Subparagraph 1 of the same Act. Hereinafter, this │ │ │ │) occurs, Article 93, Paragraph 1 of the same Act and │ │ │ │Defects occurring in the main structural parts of facilities pursuant to Article 88 of the Enforcement Decree of the Act │ │ │ │is included one or more times (applicable only to construction project management service providers │ │ │ │) │ │ │ │ │ │ │ │ b) Regarding the scope of construction project management tasks during the construction phase, the "Construction Industry Standards and Regulations │1 │ │ │If a defect occurs 3 times within the defect warranty period pursuant to Article 28, Paragraph 1 of this Act │ │ │ │In the event that an abnormality occurs (applicable only to construction project management service providers) │ │ ├──┼─────────────────────────────────┼──┤ │18) │Negligence in subcontract management │ │ │ │ │ │ │ │ a) Cases where illegal subcontracting was condoned or the validity review procedure for subcontracting │3 │ │ │Failure to comply with the [objective] or by acting differently from the relevant standards [construction industry basic standards] │ │ │ │business suspended or registration revoked pursuant to Article 82 or 83 of the Act │ │ │ │case │ │ │ │ │ │ │ │ b) Failure to perform the feasibility review procedure for subcontracting or related standards │2 │ │ │, a penalty surcharge or fine pursuant to the Framework Act on the Construction Industry │ │ │ │is imposed │ │ │ │ │ │ │ │ d) Failure to perform the feasibility review procedure for subcontracting or related standards │1 │ │ │, delays in the planned schedule or complaints may occur, or illegal │ │ │ │If an act occurs │ │ └──┴─────────────────────────────────┴──┘ Penalty measurement criteria for technical personnel ┌──┬─────────────────────────────────┬──┐ . Penalty point measurement standards for other construction engineering business operators and construction engineers, etc. │Number│주요 부실내용 │Penalty Point│ ├──┼─────────────────────────────────┼──┤ │1) │Errors in various on-site preliminary surveys or consultations with relevant agencies │ │ │ │ │ │ │ │ a) conducting on-site preliminary surveys or consultations with relevant agencies, etc., as specified in the Statement of Work │2 │ │ │is not done │ │ │ │ │ │ │ │ b) Conducted preliminary site surveys and consultations with relevant agencies, etc., as specified in the Statement of Work. │1 │ │ │but a reason for design change occurred due to incorrect selection of the investigation scope, etc. │ │ │ │Case │ │ ├──┼─────────────────────────────────┼──┤ │2) │Errors in Soil and Foundation Investigations │ │ │ │ │ │ │ │ a) Cases where soil and foundation investigations, such as boring specified in the Statement of Work, were not performed │3 │ │ │U │ │ │ │ │ │ │ │ b) Change of construction method due to errors in the soil and foundation investigations specified in the Statement of Work │1 │ │ │If a cause occurs │ │ ├──┼─────────────────────────────────┼──┤ │3) │Occurrence of grounds for design change due to errors in field surveying │ │ │ │ │ │ │ │ a) In the event that a change in the major facility plan occurs │2 │ │ │ │ │ │ │ b) In the event that a change in other facility plans occurs │1 │ ├──┼─────────────────────────────────┼──┤ │4) │Errors in structural or hydraulic calculations or lack of understanding regarding new technologies or new construction methods │ │ │ │ │ │ │ │ a) In the event that reconstruction of major structures occurs │3 │ │ │ │ │ │ │ b) Repair and reinforcement of major structures (excluding minor repairs and reinforcement. hereinafter ) │2 │ │ │(same as this number) if │ │ │ │ │ │ │ │ c) In the event that repair or reinforcement of other structures occurs │1 │ ├──┼─────────────────────────────────┼──┤ │5) │Incorrect calculation of quantities and construction costs (based on design prices) │ │ │ │ │ │ │ │ a) If the total construction cost changes by 10% or more │2 │ │ │ │ │ │ │ b) If the total construction cost changes by 5% or more │1 │ │ │ │ │ │ │ d) Construction costs by type of work, such as earthworks and drainage works, changed by 10% or more │0.5 │ │ │(limited to types of work corresponding to 10% or more of the total construction cost) │ │ ├──┼─────────────────────────────────┼──┤ │6) │Negligence in preparing design documents │ │ │ │ │ │ │ │ a) omission of parts of the design documents or failure to meet relevant standards │3 │ │ │When reconstruction or repair/reinforcement (excluding minor repair/reinforcement) occurs │ │ │ │is performed │ │ │ │ │ │ │ │ b) Failure to consider the specificity of the construction, regional conditions, or construction methods, etc., at the site │2 │ │ │In cases where it does not suit the actual situation or construction is difficult │ │ │ │ │ │ │ │ ) Delete <2024. 3. 5.> │ │ ├──┼─────────────────────────────────┼──┤ │7) │Incorrect material selection (materials selected in accordance with the result of written consultation with the contracting authority │ │ │ │(excluding cases where it is determined to be due to an error in material selection despite being decided) construction │ │ │ │Occurrence of default in START │ │ │ │ │ │ │ │ a) Failure to perform the procedure for reviewing the conformity of major material quality and specifications, or │3 │ │ │If re-construction is required due to deviation from relevant standards │ │ │ │ │ │ │ │ b) Failure to implement the procedure for reviewing the conformity of major material quality and specifications, or │2 │ │ │Repair and reinforcement in a manner different from relevant standards (excluding minor repairs and reinforcement) │ │ │ │. If (the same applies hereinafter in this number) is required, │ │ │ │ │ │ │ │ d) Failure to perform other procedures for reviewing the conformity of material quality and specifications │1 │ │ │or │ │ │ │case │ │ ├──┼─────────────────────────────────┼──┤ │8) │Negligence in work management of construction engineers participating in construction engineering │ │ │ │ │ │ │ │ a) When the construction engineer scheduled to participate performs actual construction engineering work │3 │ │ │If not participating or unqualified person participates │ │ │ │ │ │ │ │ b) If the stated scope of work of the participating construction engineer differs from the actual situation or supervision │1 │ │ │In the case of failure to comply with the instructions of the person without justifiable grounds │ │ ├──┼─────────────────────────────────┼──┤ │9) │The matter of deciding to perform construction project management duties during the pre-qualification screening for bidders │ │ │ │Arbitrary change of participating technical personnel in construction engineering or negligence in management (construction engineer │ │ │ │(Applies only to ring operators) │ │ │ │ │ │ │ │ a) without consulting the Client or without obtaining the Client's approval, construction │2 │ │ │In the event that participating engineering personnel are replaced, more than 50% of construction engineers │ │ │ │ring assigned to the relevant construction site for 3 years or more │ │ │ │In the case of retirement, enlistment, immigration, or death, or due to illness or injury, 3 months or less │ │ │ │If medical treatment is required, if the commencement of construction is delayed for more than 3 months, or │ │ │ │In the event that progress is suspended, or in other cases deemed necessary by the Contracting Authority │ │ │ │is excluded. The same applies to this number below) │ │ │ │ │ │ │ │ b) Construction engineering participating technical personnel in the same field without substantial reason 3 │1 │ │ │If replaced more than once │ │ ├──┼─────────────────────────────────┼──┤ │10) │Negligence in construction engineering duties, etc. │ │ │ │ │ │ │ │ a) In relation to the scope of duties, etc. of construction project management pursuant to Article 59, Paragraph 4 │2 │ │ │Exceeding the scheduled deadline due to negligence in duties, record keeping, or reporting │ │ │ │If supplementary design is required │ │ │ │ │ │ │ │ b) Due to the negligence of duty of a participating construction engineering engineer without justifiable reason │0.5 │ │ │In case of a delay in the planned schedule for design services │ │ ├──┼─────────────────────────────────┼──┤ │11) │Negligence in construction safety inspections │ │ │ │ │ │ │ │ a) Reports of periodic safety inspections and detailed safety inspections that are significantly different from the facts │3 │ │ │has been completed, if regular safety inspections or detailed safety inspections are not performed or │ │ │ │In the case of a construction accident occurring due to a deviation from relevant standards │ │ │ │ │ │ │ │ b) Failure to perform regular safety inspections or detailed safety inspections, or failure to comply with relevant standards │2 │ │ │과 다르게 하여 보수ㆍ보강이 필요한 경우 │ │ │ │ │ │ │ │ d) Failure to report the results within the deadline after a regular safety inspection or detailed safety inspection │1 │ │ │If not │ │ ├──┼─────────────────────────────────┼──┤ │12) │Causing damage to the contracting authority by poorly performing demand forecasting during the feasibility study │1 │ │ │In the case where the demand forecast was intentionally miscalculated by more than 30% │ │ └──┴─────────────────────────────────┴──┘ d. The measuring agency shall, upon obtaining confirmation from the relevant company (including the site representative) and construction engineers, etc. Penalty points are imposed based on the major deficiencies in accordance with the regulations from Item A to Item C, and the The results must be notified to the person subject to the penalty points. E. In cases where an auditing body requests disposition in relation to the relevant construction project, or the relevant company (Site Representative In the event that the person (including the person) or construction engineers, etc. refuses to confirm the defect, the request for disposition Defects may be measured and penalty points imposed based on evidence such as photographs or other materials. There is. B. Penalty Point Reduction Criteria 1) Construction contractors, registered housing construction operators, or construction engineers with no fatal accidents during the half-year period For ring operators, 20% of the penalty points imposed in the next half-year shall be reduced, and consecutive half-yearly If there are no fatal accidents, the penalty points imposed in the next half-year are reduced according to the following table. Decrease. ┌──────────────┬───┬───┬───┐ │Number of consecutive half-years without fatal accidents │2nd Half │3Semi-annual │4Semi-annual │ ├──────────────┼───┼───┼───┤ │Reduction rate │36% │49% │59% │ └──────────────┴───┴───┴───┘ 2) Construction business operators, registered housing construction operators, or construction For engineering business operators, ratio of sites without penalty points imposed compared to the number of semi-annually inspected sites (hereinafter referred to as the "Excellent Management Ratio") is 80% or higher, the corresponding Reduces penalty points imposed during the half-year, and the reduction points are the imposed penalty points (no imposed penalty points ), it shall be limited to the next half-year The penalty points for each half-year shall be reduced. In this case, if a joint venture is formed, the participating... The number of inspection sites is calculated considering the proportion. ┌───────┬──────────┬──────────┬────┐ │Excellent Management Ratio │80% or more ~ ​​less than 90% │90% or more ~ ​​less than 95% │Over 95%│ ├───────┼──────────┼──────────┼────┤ │ReductionScore │0.2 points │0.5 points │1point │ └───────┴──────────┴──────────┴────┘ 3) In cases where the grounds for reduction under 1) and 2) apply simultaneously, the reduction under 2) shall be applied first , and if there are remaining penalty points after reduction according to 2), reduce the penalty points according to 1 . 4) In cases where it is confirmed that penalty points were unfairly reduced, such as by delaying the reporting of a fatal accident , reduced penalty points are added in the next half-year. Company. Penalty point imposition deadline Is the measurement agency facing the expiration of the defect liability period pursuant to Article 28, Paragraph 1 of the Framework Act on the Construction Industry? Penalty points shall be imposed. However, in cases where the defect warranty liability period is separately stipulated in other laws, In the above, it shall be imposed until the end of the relevant warranty period. 6. Penalty Points Disclosure The Minister of Land, Infrastructure and Transport, pursuant to Article 53, Paragraph 3 of the Act, two months after the last day of each half-year , Discloses total penalty points, etc..