■ Enforcement Decree of the Construction Technology Promotion Act [Appendix 6] <Amended July 2, 2024>
Standards for Cancellation of Registration, Suspension of Business Operations, and Calculation of Administrative Fines for Construction Engineering Business Operators
(Related to Article 46 Paragraph 1 and Article 48 Paragraph 1)
1. General Standard
a. The aggravated criteria for administrative sanctions based on the number of violations shall be the same violation within the last year
This applies when an administrative disposition is received for an act. In this case, the calculation of the period is as follows:
Regarding the violation, on the date an administrative disposition was received and the same violation committed again after the disposition
.
b. In cases where an aggravated disposition is imposed pursuant to subparagraph a, the order of application of the aggravated disposition is the one above
Prior to the violation, the order of the imposed disposition (if two administrative fine dispositions are issued within the period pursuant to subparagraph (a)
상 있었던 경우에는 높은 차수를 말한다)의 다음 차수로 한다.
It is a case where there are two or more violations, and the respective disposition standards are different.
In the case where two or more disposal standards are all...
In the case of a business suspension, within a scope not exceeding the sum of the periods for each disposition standard,
The weighting may be increased up to half of the heavy disposition criteria, provided that the aggregating of such weighted dispositions
The period is... in cases falling under Article 31, Paragraph 1, Subparagraphs 6 through 9 of the Act.
It shall not exceed one year, and in cases falling under any of the subparagraphs of Paragraph 2 of the same Article
shall not exceed 6 months.
d. In any of the following cases, the disposing authority shall apply to the individual criteria of Subparagraph 2
, that period or
The amount may be reduced. However, in the case of a violator who has outstanding administrative fines, the amount may be reduced.
That is not the case.
1) Where the violation is recognized as being due to minor negligence or error
2) 위반행위자가 위반행위를 바로 정정하거나 시정하여 법 위반상태를 해소한
경우
3) 그 밖에 위반행위의 내용ㆍ정도ㆍ동기 및 결과 등을 고려하여 감경할 필요
가 있다고 인정되는 경우
2. 개별기준
┌───────────────────┬──────┬───────┬───────┬───────┐
│위반행위 │근거 │1차 │2차 │3rd or higher │
│ │Legal Provisions ├───┬───┼───┬───┼───┬───┤
│ │ │Disposal │Fine│Disposal │Fine│Disposal │Fine│
│ │ │Based │Amount │Based │Amount │Based │Amount │
├───────────────────┼──────┼───┼───┼───┼───┼───┼───┤
│a. by false or other fraudulent means │Article 31 of the Act │Register │corresponding │ │ │ │ │
│registered pursuant to Article 26, Paragraph 1 of the Act │Paragraph 1 No. 1 │Cancel │None │ │ │ │ │
│case │ │ │ │ │ │ │ │
├───────────────────┼──────┼───┼───┼───┼───┼───┼───┤
│B. Business suspension three or more times in the last five years │Article 31 of the Act │Register │Relevant │ │ │ │ │
│or penalty under Article 32 of the Act │Paragraph 1, Subparagraph 2 │Cancel │None │ │ │ │ │
│In case of receiving an imposition disposition │ │ │ │ │ │ │ │
├───────────────────┼──────┼───┼───┼───┼───┼───┼───┤
│. During the business suspension period, construction engineering │Article 31 of the Act │Register │Relevant │ │ │ │ │
│In the case where duties have been performed (Article 33 of the Act │Paragraph 1 No. 3 │Cancel │None │ │ │ │ │
│The case of performing construction engineering in accordance │ │ │ │ │ │ │ │
│(Excludes) │ │ │ │ │ │ │ │
├───────────────────┼──────┼───┼───┼───┼───┼───┼───┤
│. Registered as a construction engineering business operator │Article 31 of the Act │Register │Relevant │ │ │ │ │
│Grounds for disqualification pursuant to Article 27 of the Act after START │Paragraph 1 No. 4 │Cancel │None │ │ │ │ │
│중 어느 하나에 해당하게 된 경우 │ │ │ │ │ │ │ │
│(A corporation falling under Article 27, subparagraph 4 of the Act │ │ │ │ │ │ │ │
│and the cause occurred │ │ │ │ │ │ │ │
│Within 3 months from the date of START the reason │ │ │ │ │ │ │ │
│is resolved) │ │ │ │ │ │ │ │
├───────────────────┼──────┼───┼───┼───┼───┼───┼───┤
│e. In violation of Article 28, Paragraph 2 of the Act, other │Article 31 of the Act │Register │corresponding │ │ │ │ │
│to the person one's own name or trade name │Paragraph 1 No. 5 │Cancel │None │ │ │ │ │
│to perform construction engineering │ │ │ │ │ │ │ │
│or in case of lending the registration certificate │ │ │ │ │ │ │ │
├───────────────────┼──────┼───┼───┼───┼───┼───┼───┤
│B. Performance of business pursuant to Article 35, Paragraph 2 of the Act │Article 31 of the Act │Sales │120 million│ │ │ │ │
│Forging documents regarding the competency assessment or │Paragraph 1 No. 6 │Stop │10000 │ │ │ │ │
│Falsifying, etc., false or other non- │ │12months│ │ │ │ │ │
│In the case of participating in the bid by the specified method │ │ │ │ │ │ │ │
├───────────────────┼──────┼───┼───┼───┼───┼───┼───┤
│, registered as a construction engineering business operator │Article 31 of the Act │Sales │30Million │Sales │60Million │Sales │120 million│
│after registration pursuant to Article 26, Paragraph 1 of the Act │Paragraph 1 No. 7 │Stop │One │Stop │One │Stop │10000 │
│standard is not met │ │3 MONTH │ │6개월 │ │12months│ │
│Within 50 days from that day, the unmet... │ │ │ │ │ │ │ │
│If the START clause is not supplemented in │ │ │ │ │ │ │ │
├───────────────────┼──────┼───┼───┼───┼───┼───┼───┤
│A. Intentionally or negligently "Industrial Safety and Health Insurance │Article 31 of the Act │ │ │ │ │ │ │
│Serious [Unclear text] pursuant to Article 2, subparagraph 2 of the "Construction Act" │Paragraph 1 No. 8 │ │ │ │ │ │ │
│When a disaster occurs or the beginning of construction work │ │ │ │ │ │ │ │
│Causing property damage to the State │ │ │ │ │ │ │ │
│or cause harm to a person │ │ │ │ │ │ │ │
│In cases where substandard construction was caused │ │ │ │ │ │ │ │
│ │ │ │ │ │ │ │ │
│ 1) Due to the collapse of the main structural parts, "Industrial │ │Sales │corresponding │ │ │ │ │
│Pursuant to Article 2, Subparagraph 2 of the Occupational Safety and Health Act │ │Stop │None │ │ │ │ │
│causing other serious accidents │ │12months│ │ │ │ │ │
│In the event that harm is caused to a person, etc. │ │ │ │ │ │ │ │
│ │ │ │ │ │ │ │ │
│ 2) Critical to the structural safety of major structural parts │ │Sales │corresponding │Sales │corresponding │ │ │
│If there is a defect │ │Stop │None │Stop │None │ │ │
│ │ │ 6 MONTH│ │12months│ │ │ │
│ │ │ │ │ │ │ │ │
│ 3) Due to a problem with the main structural part, nearby │ │Sales │corresponding │Sales │corresponding │Sales │Relevant │
│Affecting the structural safety of facilities │ │Stop │None │Stop │None │Stop │None │
│causing harm to a person, such as causing harm to a person │ │3 MONTH │ │6개월 │ │12months│ │
│case │ │ │ │ │ │ │ │
│ │ │ │ │ │ │ │ │
│ 4) Intentionally during the feasibility study demand forecast │ │Sales │120 million│ │ │ │ │
│side incorrectly by more than 30 percent │ │Stop │10000 │ │ │ │ │
│Property damage to the contracting authority of a construction project │ │12months│ │ │ │ │ │
│If harm was caused │ │ │ │ │ │ │ │
│ │ │ │ │ │ │ │ │
│ 5) Due to gross negligence during feasibility study │ │Sales │60Million │Sales │120 million│ │ │
│Incorrect demand forecast by more than 30 percent │ │Stop │One │Stop │10000 │ │ │
│to the client of the construction project property │ │6 MONTH │ │12months│ │ │ │
│In case of causing damage │ │ │ │ │ │ │ │
│ │ │ │ │ │ │ │ │
│ 6) Construction work due to negligence in preliminary investigation, etc. │ │Sales │30Million │Sales │60Million │Sales │120 million│
│Significantly increasing the required cost of START │ │Stop │One │Stop │One │Stop │10000 │
│or in case of significant delay in the construction period │ │3 MONTH │ │6개월 │ │12months│ │
│and caused property damage to the contracting authority │ │ │ │ │ │ │ │
│case │ │ │ │ │ │ │ │
├───────────────────┼──────┼───┼───┼───┼───┼───┼───┤
│. Other administrative agencies in accordance with relevant laws │Article 31 of the Act │ │ │ │ │ │ │
│Requesting cancellation of registration or suspension of business │Paragraph 1 No. 9 │ │ │ │ │ │ │
│case │ │ │ │ │ │ │ │
│ │ │ │ │ │ │ │ │
│ 1) In case of request for registration cancellation │ │Register │corresponding │ │ │ │ │
│ │ │Cancel │None │ │ │ │ │
│ │ │ │ │ │ │ │ │
│ 2) In the case where a request for business suspension │ │Sales │60Million │Sales │60Million │ │ │
│ │ │Stop │One │Stop │Won │ │ │
│ │ │6 MONTH │ │6 MONTH │ │ │ │
├───────────────────┼──────┼───┼───┼───┼───┼───┼───┤
│Vehicle. Insurance pursuant to Article 34, Paragraph 2 of the Act also │Article 31 of the Act │Warning │corresponding │Sales │10Million │Sales │10Million │
│if you are not enrolled in the deduction │Paragraph 2, Subparagraph 1 │ │None │Stop │One │Stop │Won │
│ │ │ │ │1月 │ │1月 │ │
├───────────────────┼──────┼───┼───┼───┼───┼───┼───┤
│K. Contracting authority pursuant to Article 35, Paragraph 4 of the Act │Article 31 of the Act │Sales │30Million │Sales │60Million │Sales │60Million │
│Subcontracting without obtaining approval from │Paragraph 2 Subparagraph 2 │Stop │One │Stop │One │Stop │Won │
│case │ │3개월 │ │6개월 │ │6 MONTH │ │
├───────────────────┼──────┼───┼───┼───┼───┼───┼───┤
│T. Report pursuant to Article 38, Paragraph 2 of the Act and │Article 31 of the Act │Warning │corresponding │Sales │10Million │Sales │20Million │
│complies with the order to submit related materials │Paragraph 2, Subparagraph 3 │ │None │Stop │One │Stop │One │
│If not │ │ │ │1月 │ │2 2 months │ │
├───────────────────┼──────┼───┼───┼───┼───┼───┼───┤
│Part. Inspection pursuant to Article 38, Paragraph 3 of the Act │Article 31 of the Act │Warning │corresponding │Sales │10Million │Sales │20Million │
│In case of refusal, obstruction, or evasion │Paragraph 2, Subparagraph 4 │ │None │Stop │One │Stop │Won │
│ │ │ │ │1 month │ │2月 │ │
├───────────────────┼──────┼───┼───┼───┼───┼───┼───┤
│H. Construction EN performing construction project management │Article 31 of the Act │ │ │ │ │ │ │
│An engineering business operator under any of the following │Paragraph 2, Item 5 │ │ │ │ │ │ │
│If it applies to me │ │ │ │ │ │ │ │
│ │ │ │ │ │ │ │ │
│ 1) Submit the Construction Project Management Report │Article 31 of the Act │Sales │20 million │Sales │30Million │Sales │30 million │
│not or in the latter part of Article 39, Paragraph 4 │Paragraph 2, Item 5 │Stop │One │Stop │One │Stop │Won │
│Construction │AMOC │2月 │ │3개월 │ │3 months │ │
│Falsely modifying the project management report │ │ │ │ │ │ │ │
│or Construction Project Management │ │ │ │ │ │ │ │
│In the old document, the main structure of the relevant construction project │ │ │ │ │ │ │ │
│Construction, Inspection, and Testing for the Structure │ │ │ │ │ │ │ │
│is omitted, │ │ │ │ │ │ │ │
│ │ │ │ │ │ │ │ │
│ 2) Re-construction/Work to the construction contractor │Article 31 of the Act │Warning │corresponding │Sales │10Million │Sales │20 million │
│Take measures such as a suspension order and the law │Paragraph 2, Item 5 │ │No │Stop │One │Stop │Won │
│Pursuant to Article 40, Paragraph 3, to the contracting authority │Namok │ │ │1 month │ │2 months │ │
│If not reported │ │ │ │ │ │ │ │
│ │ │ │ │ │ │ │ │
│ 3) Design pursuant to Article 48, Paragraph 2 of the Act │Article 31 of the Act │Warning │corresponding │Sales │10Million │Sales │20 million │
│Failure to report book review results │Paragraph 2, Item 5 │ │No │Stop │One │Stop │Won │
│is the case │Multipurpose │ │ │1 month │ │2月 │ │
│ │ │ │ │ │ │ │ │
│ 4) Guidance and Supervision of Quality Control for Construction Works │Article 31 of the Act │Warning │corresponding │Sales │10Million │Sales │20 million │
│The case of not faithfully performing the poison │Paragraph 2, Item 5 │ │No │Stop │One │Stop │Won │
│[Construction business operator or housing construction, etc. │Ramok │ │ │1 month │ │2月 │ │
│A registration business operator pursuant to Article 55, Paragraph 1 of the Act │ │ │ │ │ │ │ │
│Quality control plan for construction work or │ │ │ │ │ │ │ │
│Quality test plan (products according to that plan │ │ │ │ │ │ │ │
│(including quality tests or inspections) │ │ │ │ │ │ │ │
│Failure to implement or quality test results │ │ │ │ │ │ │ │
│Limited to cases where START is manipulated] │ │ │ │ │ │ │ │
│ │ │ │ │ │ │ │ │
│ 5) Unqualified as a construction engineer │Article 31 of the Act │Sales │60Million │Sales │60 million │ │ │
│person or affiliated construction engineer is │Paragraph 2, Item 5 │Stop │One │Stop │Won │ │ │
│Construction project management for a person │Mamok │6 months │ │6 months │ │ │ │
│caused to be performed (a construction engineer │ │ │ │ │ │ │ │
│As someone who is not a person, the contracting authority prior │ │ │ │ │ │ │ │
│) │ │ │ │ │ │ │ │
│ │ │ │ │ │ │ │ │
│ 6) To another construction engineering business operator │Article 31 of the Act │Sales │60Million │Sales │60Million │ │ │
│게 소속된 건설기술인으로 하여 │Paragraph 2, Item 5 │Stop │One │Stop │Won │ │ │
│had construction project management performed │Barmok │6 months │ │6개월 │ │ │ │
│case │ │ │ │ │ │ │ │
│ │ │ │ │ │ │ │ │
│ 7) Construction performing construction project management │Article 31 of the Act │Sales │60Million │Sales │60 million │ │ │
│Replacing technicians by fraudulent means │Paragraph 2, Item 5 │Stop │One │Stop │Won │ │ │
│or deployed │Pastoral Ministry │6月 │ │6月 │ │ │ │
├───────────────────┼──────┼───┼───┼───┼───┼───┼───┤
│Correction order pursuant to Article 54, Paragraph 1 of the Act. │Article 31 of the Act │Sales │10Million │Sales │20 million │Sales │20 million │
│is not performed │Paragraph 2, No. 6 │STOP │One │Stop │One │Stop │Won │
│ │ │1 month │ │2개월 │ │2months │ │
├───────────────────┼──────┼───┼───┼───┼───┼───┼───┤
│You. Perform quality testing or inspection work │Article 31 of the Act │ │ │ │ │ │ │
│is │Paragraph 2, Item 7 │ │ │ │ │ │ │
│In the case corresponding to any one of the sounds │ │ │ │ │ │ │ │
│ │ │ │ │ │ │ │ │
│ 1) Defects in quality testing or inspection │Article 31 of the Act │Sales │60Million │Sales │60 million │ │ │
│로 인하여 건설공사 또는 건설 │Paragraph 2, Item 7 │STOP │One │Stop │Won │ │ │
│Materials and components used in construction │AMok │6月 │ │6 months │ │ │ │
│In case of significantly degraded quality │ │ │ │ │ │ │ │
│ │ │ │ │ │ │ │ │
│ 2) Report of Quality Test or Inspection │Article 31 of the Act │Sales │60Million │Sales │60 million │ │ │
│If START is issued falsely │Paragraph 2, Item 7 │STOP │One │Stop │Won │ │ │
│ │Namok │6 months │ │6 months │ │ │ │
│ │ │ │ │ │ │ │ │
│ 3) For more than 3 months without justifiable cause │Article 31 of the Act │Sales │10Million │Sales │20 million │Sales │30 million │
│Agency for quality testing or inspection │Paragraph 2, Item 7 │STOP │One │Stop │One │Stop │Won │
│If rejected │Multipurpose │1 month │ │2개월 │ │3 months │ │
│ │ │ │ │ │ │ │ │
│ 4) Unqualified as a construction engineer │Article 31 of the Act │Sales │60Million │Sales │60 million │ │ │
│person or affiliated construction engineer is │Paragraph 2, Item 7 │STOP │One │Stop │Won │ │ │
│make a person perform quality inspection │Ramok │6 months │ │6 months │ │ │ │
│In case of execution │ │ │ │ │ │ │ │
│ │ │ │ │ │ │ │ │
│ 5) In violation of Article 60, Paragraph 2 of the Act │Article 31 of the Act │Sales │20 million │Sales │30Million │Sales │60 million │
│The client or construction project management │Paragraph 2, Item 7 │STOP │One │Stop │One │Stop │Won │
│of a construction engineering business operator performing │Mamok │2月 │ │3개월 │ │6 months │ │
│With sealed or verified materials │ │ │ │ │ │ │ │
│If quality inspection was not performed │ │ │ │ │ │ │ │
│ │ │ │ │ │ │ │ │
│ 6) In violation of Article 60, Paragraph 3 of the Act, product │Article 31 of the Act │Warning │corresponding │Warning │corresponding │Sales │10 million │
│Quality Inspection Report and Quality Inspection Details │Paragraph 2, Item 7 │ │No │ │No │Stop │Won │
│is not entered into the information network or │Barmok │ │ │ │ │1 month │ │
│, │ │ │ │ │ │ │ │
│ │ │ │ │ │ │ │ │
│ 7) Correction pursuant to Article 60, Paragraph 4 of the Act │Article 31 of the Act │Sales │10Million │Sales │20 million │Sales │20 million │
│Failure to comply with measures such as orders │Paragraph 2, Item 7 │STOP │One │Stop │One │Stop │Won │
│case │Pastoral Ministry │1 month │ │2개월 │ │2月 │ │
└───────────────────┴──────┴───┴───┴───┴───┴───┴───┘
Remarks
1. The comprehensive field or the general field of design and project management among the detailed fields of construction engineering business pursuant to Attached Table 5
, the reasons specified in subparagraphs (f) or (h) through (n) of Item 2 of this Table
In cases where a business suspension order is issued, considering the construction engineering contract and work details, the violation
If the above is related only to specific tasks among design services, construction project management, or quality inspection services
can impose a business suspension order only with respect to the relevant business.
2. In cases where the disposing authority issues a business suspension order for a violation pursuant to Article 31, Paragraph 1, Subparagraph 7 of the Act, the disposing authority
The eligibility for construction engineering registration standards must be verified by [date], and [date] until the end of the business suspension order.
You must check whether any deficiencies in the registration criteria have been supplemented.