Annex 1 — 건설근로자의 고용개선 등에 관한 법률 시행령
277395 · 2025-10-01
■ Enforcement Decree of the Act on the Improvement of Employment, etc. of Construction Workers [Attached Table 1] <Amended May 7, 2024>
Integrated Job Categories Subject to Classification and Management by Skill Grade of Construction Workers (Related to Article 4-3, Paragraph 2)
┌──┬───────┬────────────────────────────────────┐
│serial number│Integrated Occupation │Details │
├──┼───────┼────────────────────────────────────┤
│1 │Earthwork │Review of design documents for the purpose of constructing earthwork sections and structures in civil engineering works, │
│ │ │Conduct site survey, establish construction input and construction plans, and carry out soil excavation, trenching, │
│ │ │Work involving rock excavation, blasting, transportation, stacking, etc. │
├──┼───────┼────────────────────────────────────┤
│2 │Packaging │Work such as aggregate laying and road surface treatment in road paving and other construction projects │
│ │ │MTQ152e908843f1b13600646Working at START │
├──┼───────┼────────────────────────────────────┤
│3 │Orbit │A railway installed for operating a device that transports passengers, cargo, etc., │
│ │ │Installation, construction, maintenance, and repair of track facilities such as wire ropes, and │
│ │ │is the work of demolishing │
├──┼───────┼────────────────────────────────────┤
│4 │boring │Foundation design of structures or underground geological characteristics, properties, strength, and types of rocks │
│ │ │To analyze the above, collect samples of underground materials and verify/open soil conditions │
│ │ │Work that does the amount │
├──┼───────┼────────────────────────────────────┤
│5 │Dredging │by using and operating a dredger for the smooth entry and exit of vessels, installation of structures, etc. │
│ │ │Excavating sediments of seas, rivers, or lakes and soil and rocks of the original ground to determine │
│ │ │The work of disposing of dredged soil at a location │
├──┼───────┼────────────────────────────────────┤
│6 │Survey │Measuring the positions of certain points existing in space and investigating their characteristics │
│ │ │The work of representing in drawings and numbers, or reproducing locations on drawings on-site │
│ │ │(Taking photographs for surveying, producing maps, and drawings required for various construction projects │
│ │ │(including drafting, etc.) │
├──┼───────┼────────────────────────────────────┤
│7 │Formwork Carpentry │Fabrication of formwork and shoring for concrete pouring or earth retaining wall construction, │
│ │ │Work of assembling, installing, or dismantling │
├──┼───────┼────────────────────────────────────┤
│8 │Architectural Woodworking │Work involving the processing, installation, and repair of timber required for various construction projects inside and outside buildings │
├──┼───────┼────────────────────────────────────┤
│9 │Masonry │To construct vertical structures such as interior and exterior walls, columns, and fences of a building, bricks │
│ │ │Work involving stacking concrete blocks, etc., and performing finishing work │
├──┼───────┼────────────────────────────────────┤
│10 │Plaster │To enhance the aesthetics and soundproofing and moisture-proofing effects of the floors, interior and exterior walls, and ceilings of buildings │
│ │ │Mortar, plaster, gypsum plaster (gypsum paste material) and other │
│ │ │The work of applying plastering materials │
├──┼───────┼────────────────────────────────────┤
│11 │Discover │To improve the aesthetics of the interior and exterior of concrete walls of buildings, protruding parts │
│ │ │The work of removing, applying cement, and smoothing the finishing work │
├──┼───────┼────────────────────────────────────┤
│12 │Waterproof │To protect buildings from water and provide a pleasant environment, the structure's │
│ │ │To prevent water leakage by using waterproofing materials on floors, walls, roofs, etc. │
│ │ │The task of doing a task │
├──┼───────┼────────────────────────────────────┤
│13 │Caulking│Sealant for gaps and joints to block noise and prevent the ingress of foreign substances │
│ │ │The work of filling (sealant: liquid material for filling seams) │
├──┼───────┼────────────────────────────────────┤
│14 │Tile │The work of attaching tiles, such as tiles or astiles, to the surface of a structure │
├──┼───────┼────────────────────────────────────┤
│15 │Masonry │Breaking, shaping, and attaching stones to construct stone structures such as dams and retaining walls, or │
│ │ │The work of stacking │
├──┼───────┼────────────────────────────────────┤
│16 │Painting │To improve the aesthetics and durability of buildings, brushes, rollers, and spray guns │
│ │ │Using START (spray gun), etc., work areas and substrates according to function or purpose │
│ │ │Applying paint suitable for START │
├──┼───────┼────────────────────────────────────┤
│17 │Reinforcement │Cutting to reinforce concrete in construction works such as buildings, bridges, dams, etc., │
│ │ │Insert the fabricated or assembled reinforcing bars into the concrete mold or the place where concrete is to be poured │
│ │ │Fixing work │
├──┼───────┼────────────────────────────────────┤
│18 │Concrete │Installing formwork for pouring concrete or pouring, curing, and inspecting concrete │
│ │ │· Work of forming a concrete structure by repairing │
├──┼───────┼────────────────────────────────────┤
│19 │Windows │A design planned considering the structure, function, aesthetics, and safety of the interior and exterior of a building │
│ │ │Establish a construction plan according to the drawings, and windows, glass, curtain walls (partition walls), wood │
│ │ │The work of manufacturing or installing doors or windows made of wood, steel, window frames, etc. │
├──┼───────┼────────────────────────────────────┤
│20 │Scaffolding │During construction, maintenance, repair, alteration, and demolition work on buildings, structures, etc., at high places │
│ │ │Temporary structures installed to enable work (scaffolding, girders, work platforms, protection ) │
│ │ │Work involving the installation or dismantling of networks, etc. │
├──┼───────┼────────────────────────────────────┤
│21 │PanelAssembly │Polycarbonate panels or sandwich panels (different materials │
│ │ │in a sandwich form and bonding them with adhesive) cutting· │
│ │ │The work of forming and assembling metal plates that connect the walls or roofs of buildings by processing │
├──┼───────┼────────────────────────────────────┤
│22 │Spamming │Wallpaper made of materials such as paper, cloth, and plastic for the ceilings, walls, and floors of buildings, │
│ │ │The act of attaching windows, etc. using glue or adhesive │
├──┼───────┼────────────────────────────────────┤
│23 │Glass │The work of cutting glass to size and installing it on the interior and exterior walls of a building │
├──┼───────┼────────────────────────────────────┤
│24 │Sujang │Install carpet tiles, vinyl flooring, and wood flooring on wooden, concrete, etc. │
│ │ │Work │
├──┼───────┼────────────────────────────────────┤
│25 │Insulation │Restricting heat transfer in buildings, piping, etc. using insulation materials for temperature preservation, │
│ │ │Work involving preventing heat loss, etc. │
├──┼───────┼────────────────────────────────────┤
│26 │Plant │Plant facilities (energy facilities such as steel, oil, paper, chemical, nuclear and power generation │
│ │Insulation │refers to. The same applies hereinafter) stricter specifications and quality assurance than general construction work │
│ │ │Work of performing insulation work on piping, etc. according to requirements │
├──┼───────┼────────────────────────────────────┤
│27 │Roof │Construction plan for the uppermost part of a building to protect the interior space from the exterior │
│ │ │에 따른 지붕공사를 하는 일 │
├──┼───────┼────────────────────────────────────┤
│28 │Demolition │Crushing all or part of a structure, etc. for relocation, repair, or demolition │
│ │ │· Crushing · Cutting work │
├──┼───────┼────────────────────────────────────┤
│29 │Steel Structure │Considering the safety, constructability, and economic feasibility of structures, etc. designed with steel, steel plates, │
│ │ │Installing structural members such as steel pipes by methods such as welding or bolting │
│ │ │Work │
├──┼───────┼────────────────────────────────────┤
│30 │Construction Machinery │Water supply, sewage, drainage, cooling, heating, ventilation, automatic control, fire extinguishing, alarm, fire extinguishing water, etc. │
│ │Facility │Work of installing building facilities │
├──┼───────┼────────────────────────────────────┤
│31 │Construction Plumbing │molding, joints, etc. in sanitary, cooling, and heating facilities, etc., of factories, buildings, houses, etc. │
│ │ │Work involving connecting, assembling, installing, and repairing piping using the START method │
├──┼───────┼────────────────────────────────────┤
│32 │Boiler │for installing industrial and building heating boilers, │
│ │ │Work of installing heat exchangers, etc. │
├──┼───────┼────────────────────────────────────┤
│33 │Water Supply & Sewerage │Assembly and installation of pipes in water supply and sewage facilities by methods such as molding and joining │
│ │Piping │·Maintenance work │
├──┼───────┼────────────────────────────────────┤
│34 │Plant │To ensure that industrial equipment and environmental machinery and equipment meet their intended use, the construction's │
│ │Machinery & Equipment │Work involving the efficient execution of planning, management, construction, commissioning, etc. │
├──┼───────┼────────────────────────────────────┤
│35 │Plant │Construction plan and quality and safety plan to supply stable power to plant facilities │
│ │Electrical Installation │and the electrical │
│ │ │Work involving construction and completion inspection │
├──┼───────┼────────────────────────────────────┤
│36 │Plant │The work of installing various control devices for the efficient operation of industrial and environmental facilities │
│ │MeasurementEquipment │ │
├──┼───────┼────────────────────────────────────┤
│37 │Plant │Connecting piping to hazardous gas transfer pipes or plant facilities, assembly, installation, │
│ │Piping │Maintenance work │
├──┼───────┼────────────────────────────────────┤
│38 │Landscaping │After establishing a construction plan based on the design documents, considering site conditions, the trees │
│ │ │Work of planting or landscaping with other landscaping objects │
├──┼───────┼────────────────────────────────────┤
│39 │Logging │To obtain construction timber or create a construction area, wood is used for various power │
│ │ │The work of logging using logging tools such as saws or axes │
├──┼───────┼────────────────────────────────────┤
│40 │Construction Machinery │Operating construction equipment for civil engineering, building construction, factory construction, etc., to perform earthwork and │
│ │ │Work involving transportation operations, etc. │
├──┼───────┼────────────────────────────────────┤
│41 │General Machinery │Operating machinery and equipment for construction work such as civil engineering, building construction, and factories to perform transportation tasks, etc. │
│ │ │The task of doing START │
├──┼───────┼────────────────────────────────────┤
│42 │Dive │Welding structures underwater using equipment, materials, air, mixed gases, etc. │
│ │ │Cutting, installation, repair, or dismantling, safety inspection, blasting, marine rescue, extreme environments │
│ │ │Work involving diving, etc. │
├──┼───────┼────────────────────────────────────┤
│43 │National Heritage Construction │In order to preserve and pass on national heritage in its original form, the repair, restoration, and maintenance of national heritage │
│ │ │Taking measures to prevent rain and damage, etc. │
├──┼───────┼────────────────────────────────────┤
│44 │General Machinery & Equipment │Assembly, installation, and adjustment of general mechanical equipment (refrigeration and air conditioning equipment, etc.) and machinery (elevators, etc.), │
│ │ │Work involving inspection and maintenance │
├──┼───────┼────────────────────────────────────┤
│45 │pipe │Developed drawings according to the work plan to manufacture boilers, steel structures, metal vessels, etc. │
│ │ │The work of cutting, forming, or assembling metal plates, rods, tubes, etc., after preparing the START. │
├──┼───────┼────────────────────────────────────┤
│46 │Plant │Stricter specification and quality assurance requirements than general construction work in plant facilities │
│ │cancer │에 따라 강제구조물ㆍ압력용기를 가공, 제작ㆍ시공 및 보수하는 일 │
├──┼───────┼────────────────────────────────────┤
│47 │Duct(duct) │Forming and processing thin metal sheets for air conditioning equipment, cooling equipment, heating equipment, ventilation equipment, etc. │
│ │ │The task of installing the air passage of START │
├──┼───────┼────────────────────────────────────┤
│48 │Plant │Stricter specification and quality assurance requirements than general construction work in plant facilities │
│ │Duct │에 따라 덕트를 제작 또는 설치하는 일 │
├──┼───────┼────────────────────────────────────┤
│49 │General Welding │Welding work involving general steel, general equipment, or general piping, etc. │
├──┼───────┼────────────────────────────────────┤
│50 │Special Welding │a. Welding of alloy steel series metals using inert gas, etc. │
│ │ │or. to create thin-walled pipes, using inert gas, etc., at a rapid speed │
│ │ │Road welding work │
├──┼───────┼────────────────────────────────────┤
│51 │Plant │a. Welding hazardous gas transfer pipes and hazardous gas containers │
│ │welding │B. Welding work for plant equipment and plant piping │
│ │ │. Steel and steel pipes are welded using inert gas tungsten arc welding (TIG welding) or inert gas │
│ │ │Metal Arc Welding (MIG Welding) Work │
│ │ │d. Welding work on piping with a design pressure of 5 kg/cm² or higher │
├──┼───────┼────────────────────────────────────┤
│52 │Plant │a. Welding work on piping or pressure vessels with an operating pressure of 100 kg/cm² or more │
│ │Special Welding │b. Welding alloy steel or alloy steel using inert gas tungsten arc welding or inert │
│ │ │Work of gas metal arc welding │
├──┼───────┼────────────────────────────────────┤
│53 │Transmission & Substation │Transporting electricity generated at power plants to distant factories or general households │
│ │ │By installing steel towers or underground power conduits to supply power to an appropriate voltage, │
│ │ │Raising or lowering with START │
├──┼───────┼────────────────────────────────────┤
│54 │Distribution │a. Install supports on concrete poles, etc., of overhead distribution lines and underground conduits │
│ │ │Work of laying wires and installing STARTs │
│ │ │b. Work involving the installation, maintenance, and management of power distribution equipment such as transformers and switchgear │
├──┼───────┼────────────────────────────────────┤
│55 │InternalWiringElectric │Incoming power lines, power supply facilities (receiving, substation, backup power, etc.), at the place of electricity use, electric │
│ │ │Supply facilities (distribution, main lines, wiring, etc.), load facilities (power, lighting, heating, etc.) and fire protection │
│ │ │Work involving the construction, commissioning, maintenance, and repair of facilities, etc. │
├──┼───────┼────────────────────────────────────┤
│56 │Outdoor Electric │Electricity produced at power plants is delivered to user facilities such as homes, factories, and buildings. │
│ │ │Work of constructing transmission and distribution-related facilities for supplying power │
├──┼───────┼────────────────────────────────────┤
│57 │Railway Signal │In accordance with design documents, relevant laws, etc., installing new railway signal control facilities or operating lines │
│ │Control │Maintenance work on railway signal control facilities of START │
├──┼───────┼────────────────────────────────────┤
│58 │Information & Communication │For smooth communication, the basics of communication facilities (wireless devices, utility poles, various cables, etc.) │
│ │ │Work involving design, detailed design, equipment ordering, construction, testing, supervision, or maintenance, etc.│
├──┼───────┼────────────────────────────────────┤
│59 │Blasting │To safely and efficiently perform blasting operations at industrial sites │
│ │ │To this end, establish measures such as the handling and management of explosives, blasting design, and prevention of noise pollution. │
│ │ │and perform eco-friendly excavation work │
├──┼───────┼────────────────────────────────────┤
│60 │SafetyManagement │Identify risks associated with the installation and management of structures through disaster analysis and disaster │
│ │ │By applying and managing foundational technologies for prevention to safety measures for each construction type, safe and │
│ │ │Creating a pleasant working environment │
└──┴───────┴────────────────────────────────────┘