Annex 2 — 개발제한구역의 지정 및 관리에 관한 특별조치법 시행령

287065 · 2026-07-01

■ Enforcement Decree of the Special Measures Act on the Designation and Management of Development Restriction Zones [Appendix 2] <Amended Apr. 14, 2026> Detailed criteria for authorization or notification (related to Article 22) 1. General Standards a. Install on the minimum necessary scale to minimize damage to the development restricted area must. B. Air pollution, water pollution, soil pollution, noise, vibration, and dust in the relevant area and its surrounding areas Environmental pollution, ecosystem destruction, or the occurrence of harm caused by dust, etc., must not be anticipated . However, the prevention of environmental pollution, prevention of harm, landscaping, creation of green spaces, and buffer zones This shall not apply in cases where conditions such as installation are attached. . Whether there is historical, cultural, or local value in the relevant area and its surrounding areas The station must not be damaged. d. In cases of altering the characteristics of the land or felling trees, elevation, slope, forest's The condition, height of nearby roads, and drainage must be taken into consideration. E. Installation of urban planning facilities, construction of buildings pursuant to the main text of Article 11, Paragraph 1, Subparagraph 5 of the Act and land alteration, if a management plan has not been established or established If it violates the contents of the management plan, the installation, etc. shall not be permitted . f. Forest land or land-leveling farmland is a site for the construction of buildings or the installation of structures . However, in cases where it does not lead to disorderly development, etc., the Mayor/County Governor/ This is not the case if the District Head approves. d. In cases where the site area for constructing a building is less than 60 square meters, the building Construction shall not be permitted. However, the reconstruction or rebuilding of existing buildings This shall not apply in the case of consolidation. Ah. Permeability (allowing water to seep in) so that rainwater can easily seep into the ground Properties) Paving must be performed. However, if permeable paving is difficult, the Mayor, County Governor, or District This is not the case if the Commissioner approves. . Disaster prevention districts pursuant to the "Act on Planning and Utilization of National Land," "Natural Disaster Countermeasures Natural disaster risk improvement zones pursuant to the “Act” and the “Act on the Prevention of Disasters on Steep Slopes” Construction of buildings shall not be permitted in areas at risk of collapse pursuant to . However, this shall not apply if safety and flood prevention measures have been established. . In the case of dividing land, the reason for division, number of parcels, etc., shall be in accordance with Article 11, Paragraph 1, Subparagraph 3 of the Act Land use and protection of development restriction zones included in the development restriction zone management plan pursuant to It must comply with matters concerning the prior matters. In this case, the necessary matters regarding the division of land The clause may be determined by the ordinances of the city, county, or district. K. Pursuant to Item 5 of Attached Table 1, village community, residents of 5 years or more, residents of 10 years or more, at the time of designation Matters concerning the succession of facilities that limit installation eligibility to residents, etc., of the facility's Considering the purpose of permission and the conditions of the jurisdiction, it may be determined by the ordinance of the city, county, or district. There is. T. Matters concerning the ratio of the installation area of ​​ancillary facilities to the main use facilities are the facility's allowance Considering the purpose and conditions of the jurisdictional area, it may be determined by the ordinance of the city, county, or district . 2. Construction of buildings or installation of structures a. Constructed with a building coverage ratio of 60 percent or less, a height of 5 stories or less, and a floor area ratio of 300 percent or less. b. Notwithstanding subparagraph (a), in the case of constructing a residential building or neighborhood living facility, the following It shall be in accordance with either of the following. However, in accordance with Item 5, Subparagraph (c)① or Subparagraph (d)C) of the same item in Annex 1 (the Mayor, County Governor, or District Head of the public interest project After recognizing the need to retain it for implementation, the ownership is transferred to the public project implementer. including cases where the right is transferred. The same applies hereinafter in this subparagraph) a building (building and In the case of constructing a new building (only applicable if full ownership of the land has been secured) The number of floors and gross floor area of ​​the relevant building shall be up to the number of floors and gross floor area of ​​the building at the time of demolition. . 1) When constructing with a building coverage ratio of 60% or less: Height 3 stories or less, Floor Area Ratio 300 percent or less, including existing area, gross floor area of ​​232 square meters (resident at the time of designation The person is 300 square meters or less. In this case, if the resident at the time of designation has a gross floor area of ​​232 square meters Cases where construction up to a gross floor area of ​​300 square meters is permitted exceeding shall be limited to one instance. 2) In the case of construction with a building coverage ratio of 20% or less: height 3 stories or less, floor area ratio 100 percent or less Notwithstanding subparagraph (a), if the Minister of National Defense recognizes it as necessary for the execution of military operations National defense and military facilities (limited to cases for the purpose of military security) are subject to the Ministry of Land, Infrastructure and Transport The height standards for buildings or structures pursuant to subparagraph (a) following consultation with the Minister of Trade, Industry and Energy May not be applied. d. The implementation of a public interest project pursuant to Subparagraph c)① of Item 5, Subparagraph (c) of the same subparagraph in Attached Table 1 In order to preserve existing housing or existing neighborhood facilities and to newly housing or neighborhood facilities In the case of constructing new residential facilities, the public project implementer [refers to] existing housing or existing neighborhood living facilities Other land within the development restricted area corresponding to the site area where the facility is retained is paddy field or dry field · Must be changed to an orchard or other land category not intended for the construction of buildings . E. In cases where buildings of the same use exist on two or more parcels, those parcels shall be combined into one can be combined into a single parcel. In this case, housing and neighborhood living facilities are subparagraph 2) (of settlement districts In the case of multi-family housing, it must comply with the standards of Article 26, Paragraph 1, Subparagraph 2, Item (b), and In the case of construction as a residential building, the number of units shall not exceed the existing number of residential units. f. Among buildings or structures, infrastructure with a total floor area of ​​1,500 square meters or more Facilities that are or have a land alteration area of ​​5,000 square meters or more are subject to the "National Land's " Notwithstanding Article 35 of the Enforcement Decree of the Act on Planning and Use of Urban Planning and Utilization, as an urban planning facility shall be implemented. However, if otherwise separately stipulated in Attached Table 1, it shall be done in accordance with . d. For areas where roads, water supply, and sewage systems are not installed, in principle Construction of a building (including land alteration for the purpose of constructing a building) shall not permit. However, in cases where it does not lead to disorderly development, etc. This shall not apply in cases recognized by the Mayor, County Governor, or District Head. A. For buildings or structures for which construction is permitted under the Act or this Decree, "Old Signboards, etc. may be installed in compliance with the "Act on the Management of External Advertising Materials, etc." A lawfully constructed building may be rebuilt, reconstructed, or majorly repaired, and the law or Extensions may be made if they comply with the provisions of this Decree. 3. Change of land use and stacking of goods a. The area of ​​land alteration is twice the building area of ​​a structure and the floor area of ​​a structure . However, in any of the following cases, it shall be the corresponding area. 1) Livestock barns and comprehensive rice processing plants shall not exceed 3 times the floor area 2) In the case of preparing a site for the construction of a house or neighborhood living facility, the 330 square meters or less, including zone area. However, Appendix 1 Item 5 Subparagraph c)① or Demolition due to the implementation of a public project pursuant to the same subparagraph (Matter D of Item D) (Mayor/County Governor/ After the head of the district office recognizes the need to retain it for the implementation of a public interest project, public Includes cases where ownership is transferred to the project implementer. Hereinafter, in this subsection... A building that has become (only in cases where ownership of both the building and the land was secured) ), the developed area of ​​the relevant site shall be the site surface at the time of demolition can do up to. 3) In relation to buildings and structures in Annex 1, land under this Decree and other statutes In cases where the installation of facilities involving a change of land use is separately stipulated, that regulation Allowed range in START 4) In the case of a damaged land restoration project pursuant to Article 4-2 of the Act, the restoration project's former Stations All b. When changing the land's characteristics pursuant to Item (a), the area of ​​the remaining land of the relevant parcel In cases where it becomes less than 60 square meters, the land characteristics including the remaining land Changes may be made. However, in cases where land division was carried out prior to the change of land characteristics, Even though it could have been subdivided in accordance with the area of ​​land alteration pursuant to subparagraph (a) in the , This shall not apply in cases where the area is divided in excess of the START area. . Buildings under each item of Article 12, Paragraph 1, Subparagraph 1 of the Act (livestock sheds, temporary structures for construction use and temporary structures for construction Land alteration surface for the construction or installation of structures (excluding facilities) If the area exceeds 200 square meters, 1/100 of the area of ​​land alteration Landscaping, including planting trees, must be carried out on the area corresponding to 5 or higher. However, [provided] [Attached Table] Facilities related to animals and plants pursuant to Subparagraph (a) of Item 5 and agricultural and fishery products pursuant to Subparagraph (b) of the same item Change of land characteristics for the construction of storage and management facilities or the installation of structures may be determined otherwise by the ordinances of the city, county, or district. a. For public projects implemented in a development restricted area, a site (where buildings or structures exist In the case where a part of (referring to land) is incorporated, a new building site equivalent to the incorporated area Land alteration may be performed in connection with the development. In this case, land that is not incorporated The newly created area adjacent to the site alone is insufficient for the minimum facility area in accordance with relevant laws and regulations. If the minimum standard area is not met, the site may be expanded up to that minimum standard area. There is. E. In the case where the land subject to land alteration is soft ground, its thickness and width Investigation of groundwater levels, etc., and testing of ground bearing capacity, settlement, and uplift The land must be improved by methods such as replacement, compaction, and drainage through START. B. Slopes or cuts resulting from embankment and excavation (earth cutting) accompanying land alteration Safety measures, such as the installation of retaining walls or stone embankments, must be taken for open surfaces. d. The extraction of soil and rock shall comply with the following standards. 1) The surrounding situation, traffic, and natural landscape must be comprehensively considered. 2) Sight area of ​​railways, expressways, national roads, and arterial roads connecting to urban areas , the extraction of soil and rock shall not be permitted unless it is an emergency measure due to a disaster is defined. In this case, the line of sight for railways and expressways is 2 kilometers from the railway or expressway The area within , and the line of sight for national and arterial roads is 1 km from national and arterial roads. Refers to an area within meters. Ah. The storage of goods may only be done on land that has been converted into building land, and at the storage area of ​​goods refers to temporary structures for the simple management of goods within the range of a gross floor area of ​​20 square meters or less . 4. Relocation and Establishment of Relocation Complexes a. The scale of a relocation complex pursuant to Article 12, Paragraph 1, Subparagraph 3 of the Act shall be 20 or more housing units . However, in an area within 2 kilometers of the building subject to relocation or resettlement, If there is no settlement area, or if relocation is to be accepted due to the topography or other conditions of nearby settlement areas In cases where it is not possible, and the Mayor, County Governor, or District Head designates the location of the relocation complex , it can be 10 or more. b. Relocation pursuant to Article 12, Paragraph 1, Subparagraph 2 of the Act and relocation complex pursuant to Subparagraph 3 of the same Paragraph It may be established only within the area of ​​the city, county, or district that has jurisdiction over the demolition site. However, if the demolition site If there are no settlement areas within the development restriction zone of the competent city, county, or district, or if the settlement area within the competent region In cases where the demand for relocation cannot be accommodated in the Rock District, or for the creation of a resettlement complex If there is no designated site, consult with the adjacent mayor, county head, or district head, and · Permission may be granted for the relocation or the creation of resettlement complexes in the districts of counties and districts. . In any of the following cases, relocation in relation to a public interest project Must not be permitted. 1) As part of relocation measures due to public projects, the acquisition of land, etc. for public projects Pursuant to Article 78 of the Act on Income and Compensation, the project implementer outside the development restriction zone In the case where housing relocation measures have been established via START 2) As part of measures regarding public interest projects, the "Acquisition of land, etc. for public interest projects and When a project implementer pursuant to the "Act on Compensation" moves a house outside the development restriction zone (regardless of their name, such as livelihood measures, etc.) If lip is done d. Relocation or moving based on a building that no longer exists due to destruction, etc. The construction of a complex that has been demolished due to the implementation of a public project shall not be permitted. However, Buildings and buildings newly constructed pursuant to Subparagraph c) ② of Item 5 of Annex 1 shall not be subject to this rule. nihada. E. After the establishment of a resettlement complex or the relocation of a building, the former land belongs to another person Except in cases where it is owned by [the company] or incorporated into a public project, the land category is [field]· By changing the land category to paddy field, orchard, or other uses not for the construction of buildings must. 5. Relocation of factories or religious facilities pursuant to Article 12, Paragraph 1, Subparagraph 3-2 of the Act a. Religious facilities must fall under Item 6 of Annex 1 of the Enforcement Decree of the Building Act. B. In the event of intending to relocate a factory or religious facility, the following standards must be complied with. 1) The area of ​​the city, county, or district where the existing factory or religious facility is located must be constructed. However, in the case of a factory, consultation with the adjacent mayor, county head, or district head Permission for relocation to the area of ​​that city, county, or district (limited to adjacent Eup, Myeon, or Dong) can do. 2) High-quality farmland (farmland where agricultural production infrastructure such as land consolidation and irrigation facilities is established) and It must be a non-forest area. 3) located 500 meters or more away from the boundary of a national river pursuant to Article 7 of the River Act Must be a START region. 4) It must be an area where there is no need to install a new access road. 5) Areas where there is no need to install new trunk supply facilities such as electricity, water, and gas should.