Form 1 — 부동산개발사업 관리 등에 관한 법률 시행규칙
280167 · 2025-11-28
■ Enforcement Rules of the Act on the Management, etc. of Real Estate Development Projects [Attachment Form No. 1]
[ ] Business Plan, etc. for a Real Estate Development Project report
[ ] Progress Status of a Real Estate Development Project
※ The reporting person must not complete shaded fields. (Page 1 of 6)
※ Please read the instructions on page 6 before filling out the form, and [ ] Mark the applicable box with a check mark.
────────────────────┬───────────────────────┬─────────────────────
Receipt Number │Receipt Date & Time │Processing Period Immediate
│ │
────────────────────┴───────────────────────┴─────────────────────
1. Project Implementer
──────────────────────────────────────────────────────────────────
────────────┬─────────────────────────────────────────────────────
Name of Project Implementer │
────────────┼────┬───┬───────────┬────────┬────────┬──────────────
Project Implementer Type │Single │Joint │Special Purpose Corporation │Other │BusinessOperator │
├────┼───┼───────────┼────────┤Registration number │
│[ ] │[ ]│[ ] │ │ │
────────────┼────┴───┴───────────┴────────┼────────┼──────────────
Location of principal office │ │DateOfEstablishment │
────────────┼──────────────────┬──────────┴────┬───┴──────────────
Financial Status (100 million KRW) │TotalAssets │Total Liabilities │TotalCapital
├──────────────────┼───────────────┼──────────────────
│ │ │
────────────┼──────────────────┼───────────────┼──────────────────
Reporter │Name(Position) │Telephone Number │Email Address
├──────────────────┼───────────────┼──────────────────
│ │ │
────────────┴──────────────────┴───────────────┴──────────────────
1-1. Status of Project Implementer Composition (Complete if there are two or more members of the project implementer)
─────┬─────────┬─────────┬───────────┬────────────┬───────────────
SerialNumber│CompanyName │Business Registration Number │Contribution Amount (100 million KRW) │Shareholding Ratio(%) │Purpose of Participation
│ │ │ │ ├──────┬────────
│ │ │ │ │Classification │Details
─────┼─────────┼─────────┼───────────┼────────────┼──────┼────────
│ │ │ │ │ │
─────┼─────────┼─────────┼───────────┼────────────┼──────┼────────
│ │ │ │ │ │
─────┼─────────┼─────────┼───────────┼────────────┼──────┼────────
│ │ │ │ │ │
─────┴─────────┴─────────┴───────────┴────────────┴──────┴────────
1-2. Status of Construction Contractors
────┬────┬───┬──────────────────┬──────────────────────┬───┬──────
Serial │ConstructionCompanyName│BusinessOperator│Contract │Credit Enhancement │Structure │Bankruptcy etc.
Number │(Company Name)│Register │ ├────────────┬─────────┤Adjust │Whether
│ │Number │ │Guaranteed Completion of Construction │Other credit enhancements │Status │
│ │ ├────┬─────┬───────┼───┬────┬───┼──────┬──┤ │
│ │ │Contract │Contract │Construction │Commitment │Due │Overdue │Reinforcement │Reinforcement│ │
│ │ │ContractDate │Amount(100 million KRW)│Period │Status │Extension │Status │Whether │Content│ │
────┼────┼───┼────┼─────┼───────┼───┼────┼───┼──────┼──┼───┼──────
│ │ │ │ │ │[ ]│ │[ ]│[ ] │ │[ ]│[ ]
────┼────┼───┼────┼─────┼───────┼───┼────┼───┼──────┼──┼───┼──────
│ │ │ │ │ │[ ]│ │[ ]│[ ] │ │[ ]│[ ]
────┴────┴───┴────┴─────┴───────┴───┴────┴───┴──────┴──┴───┴──────
1-3. Status of Trust Companies
───┬──────┬───┬────────────────────────────┬────────────┬───┬─────
Series│Name of Trust Company │Finance │Trust Agreement │Credit Enhancement │Structure │Bankruptcy etc.
Number│ │Institution ├──────────────┬────┬────────┼────┬───────┤Adjust │Status
│ │Code │TrustType │Contract │Trust │Reinforcement │Reinforcement │Status │
│ │ ├────┬─────────┤Period │Maintenance │Status │Content │ │
│ │ │Classification │Other details │ │ │ │ │ │
───┼──────┼───┼────┼─────────┼────┼────────┼────┼───────┼───┼─────
│ │ │ │ │ │ │[ ] │ │[ ]│[ ]
───┼──────┼───┼────┼─────────┼────┼────────┼────┼───────┼───┼─────
│ │ │ │ │ │ │[ ] │ │[ ]│[ ]
───┴──────┴───┴────┴─────────┴────┴────────┴────┴───────┴───┴─────
1-4. Status of Guarantee Institutions
───┬────────────┬───────────────────────┬─────────────────────────
Serial│Name of Guarantee Institution │Guarantee Method │Warranty Details
Number│ ├─────────────┬─────────┼────────────┬────────────
│ │Classification │Other details │Guarantee Amount(100 million KRW) │Scope of Guarantee
───┼────────────┼─────────────┼─────────┼────────────┼────────────
│ │ │ │ │
───┼────────────┼─────────────┼─────────┼────────────┼────────────
│ │ │ │ │
───┼────────────┼─────────────┼─────────┼────────────┼────────────
│ │ │ │ │
───┴────────────┴─────────────┴─────────┴────────────┴────────────
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
(Page 2 of 6)
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
2. Business Plan
─────────────────────────────────────
────────┬────────────────────────────
Project Name │
────────┼────────────────────────────
ProjectLocation │
────────┼───────────┬────────────────
BusinessType │Land Development Project │Building Construction Project
├───────────┼────────────────
│[ ] │[ ]
────────┼───────────┴────────────────
Legal Basis │
────────┼────────┬───────┬───────────
Business Method │Private Development │Public Development │Joint Private-Public Development
├────────┼───────┼───────────
│[ ] │[ ] │[ ]
────────┼────────┼───────┼───────────
ProjectPeriod │Total Project Period (Excluding Operation Period)│Construction Period │Other
├────────┼───────┼───────────
│Year Month~ Year Month( (Months)│Year Month~ Year Month( (Months)│
────────┼─────┬──┴──┬────┴┬──────────
Total Project Cost (100 million KRW)│Total │Land Cost │Construction Cost │Other
├─────┼─────┼─────┼──────────
│ │ │ │
│ ├─────┴──┬──┴──────────
│ │Equity │External Capital
│ ├────────┼─────────────
│ │ │
────────┼─────┴─────┬──┴─────────────
Project Scale(㎡) │Land Area │Building Gross Floor Area
├───────────┼────────────────
│ │
────────┼────┬─────┬┴─┬─────┬────────
Implementation Schedule │SecuringSite│Authorization/Permission│Sales│Start of construction │Completion
├────┼─────┼──┼─────┼────────
│ │ │ │ │
────────┴────┴─────┴──┴─────┴────────
2-1. Land Development Project Plan
─────────┬────────┬─────┬────────────
Classification │Area (㎡) │Composition Ratio(%) │Number of Parcels
─────────┼────────┼─────┼────────────
Total │ │ │
─────────┼────────┼─────┼────────────
Residential Land │ │ │
┌───────┼────────┼─────┼────────────
│ │ │ │
─┴───────┼────────┼─────┼────────────
CommercialLand │ │ │
┌───────┼────────┼─────┼────────────
│ │ │ │
─┴───────┼────────┼─────┼────────────
IndustrialLand │ │ │
┌───────┼────────┼─────┼────────────
│ │ │ │
─┴───────┼────────┼─────┼────────────
··· │ │ │
┌───────┼────────┼─────┼────────────
│ │ │ │
─┴───────┴────────┴─────┴────────────
2-2. Building Construction Project Plan
────────────┬───┬────┬─────┬─────────
Classification │Land1 │Land2 │Land3 │…
────────────┼───┼────┼─────┼─────────
Zoning │ │ │ │
───┬────────┼───┼────┼─────┼─────────
Land│(Representative)LotNumber │ │ │ │
├────────┼───┼────┼─────┼─────────
│Site Area (㎡) │ │ │ │
───┼────────┼───┼────┼─────┼─────────
Building│Building Area(㎡) │ │ │ │
├───┬────┼───┼────┼─────┼─────────
│Use │Main Use │ │ │ │
│ ├────┼───┼────┼─────┼─────────
│ │Ancillary Use│ │ │ │
├───┼────┼───┼────┼─────┼─────────
│Gross Floor Area│Ground │ │ │ │
│(㎡) ├────┼───┼────┼─────┼─────────
│ │Underground │ │ │ │
│ ├────┼───┼────┼─────┼─────────
│ │Total │ │ │ │
├───┼────┼───┼────┼─────┼─────────
│Number of floors │Ground │ │ │ │
│ ├────┼───┼────┼─────┼─────────
│ │Underground │ │ │ │
├───┴────┼───┼────┼─────┼─────────
│Floor Area Ratio(%) │ │ │ │
├────────┼───┼────┼─────┼─────────
│Building Coverage Ratio(%) │ │ │ │
├────────┼───┼────┼─────┼─────────
│Number of Households (Units) │ │ │ │
───┴────────┴───┴────┴─────┴─────────
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
(Page 3 of 6)
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
3. Funding Status
──────────────────────────────────────────────────────────────────
───────────┬──────────────────────────────────────────────────────
Equity Capital (100 million KRW) │Debt Capital
├───────────────────────────┬──────────────────────────
│FinancialInstitution │Other
├──────┬───────┬────────────┼─────────┬─────────┬──────
│Committed Amount (100 million KRW)│Balance(100 million KRW) │Number of Participants │Contract Amount(100 million KRW) │Balance(100 million KRW) │Number of Participating Parties
───────────┼──────┼───────┼────────────┼─────────┼─────────┼──────
│ │ │ │ │ │
───────────┴──────┴───────┴────────────┴─────────┴─────────┴──────
3-1. Detailed Status by Financial Institution1
───┬────┬────┬─────────┬─────────────┬─────────────────┬──────────
Serial│Order of Repayment Priority│Finance │Classification │Type │Detailed Conditions │Collateral
Number│ │Financial Institutions, etc. ├───┬─────┼───────┬─────┼───┬────┬───┬────┼──┬───┬───
│ │Name │Classification │Other │Classification │Other │Amount │All-in │Interest Rate │Period │Type│Object│Detail
│ │ │ │Details │ │Details │(billion won)│(All-in)│(%) │(Start, │ │ │Contents
│ │ │ │ │ │ │ │(%) │ │Maturity) │ │ │
───┼────┼────┼───┼─────┼───────┼─────┼───┼────┼───┼────┼──┼───┼───
│ │ │ │ │ │ │ │ │ │ │ │ │
───┼────┼────┼───┼─────┼───────┼─────┼───┼────┼───┼────┼──┼───┼───
│ │ │ │ │ │ │ │ │ │ │ │ │
───┼────┼────┼───┼─────┼───────┼─────┼───┼────┼───┼────┼──┼───┼───
│ │ │ │ │ │ │ │ │ │ │ │ │
───┴────┴────┴───┴─────┴───────┴─────┴───┴────┴───┴────┴──┴───┴───
3-2. Detailed Status by Financial Institution2
───┬──────┬─────────────┬─────────────┬────────────┬──────────────
Serial│Financial institutions, etc. │Extension of Maturity │Outstanding Balance │Delinquency │Loss of benefit of time
Number│Name ├─────┬───────┼─────┬───────┼────────┬───┼─────────┬────
│ │Number of extensions │Loss of Benefit of Time (Acceleration) │Balance(100 million KRW)│ReasonForIncreaseDecrease │Whether │on │Status │on
───┼──────┼─────┼───────┼─────┼───────┼────────┼───┼─────────┼────
│ │ │ │ │ │[ ] │ │[ ] │
───┼──────┼─────┼───────┼─────┼───────┼────────┼───┼─────────┼────
│ │ │ │ │ │[ ] │ │[ ] │
───┼──────┼─────┼───────┼─────┼───────┼────────┼───┼─────────┼────
│ │ │ │ │ │[ ] │ │[ ] │
───┴──────┴─────┴───────┴─────┴───────┴────────┴───┴─────────┴────
4. Project Implementation Status
──────────────────────────────────────────────────────────────────
──────────────────────────────────────────────────────────────────
4-1. Project Preparation Stage
───────┬─────────────────┬────────────────────────────────────────
Agreement Signing │Date of Agreement │Parties to the Agreement
├─────────────────┼──────────────────────┬─────────────────
│ │ │
───────┼─────────────────┼──────────────────────┼─────────────────
Special Purpose Corporation│Special Purpose Corporation Type │Name │Date of Incorporation Registration
Establishment of a Special Purpose Corporation, etc. ├─────────────────┼──────────────────────┼─────────────────
│ │ │
───────┼─────────────────┴──────┬───────────────┴────────┬────────
Securing Land │Land Acquisition Method │Seller │Land Acquisition Rate (%)
├───────┬─────────┬──────┼───────────────┬────────┤
│Expropriation or Use│Acquisition by Purchase (Sale) │Other │Private │Public │
├───────┼─────────┼──────┼───────────────┼────────┼────────
│[ ] │[ ] │ │[ ] │[ ] │
├───────┼─────────┼──────┴───────────────┼────────┴──┬─────
│Contract Date │Final Payment Date │Transaction Amount(100 million KRW) │Composition (%) │Whether Payment Has Been Made
│ │ ├───┬──────────────────┼───────┬───┤
│ │ │Total Amount│ │Equity │External Capital│
├───────┼─────────┼───┼──────────────────┼───────┼───┼─────
│ │ │Down Payment│ │[ ] │[ ]│[ ]
│ │ ├───┼──────────────────┼───────┼───┼─────
│ │ │IntermediatePayment│ │[ ] │[ ]│[ ]
│ │ ├───┼──────────────────┼───────┼───┼─────
│ │ │Zan gold│ │[ ] │[ ]│[ ]
├───────┼─────────┴───┴──────────────────┴───────┴───┴─────
│Whether Legal Rights Have Been Secured│If Securing Legal Rights Is Delayed
│ ├─────────┬──────────────────────┬─────────────────
│ │DelayStatus │ReasonForDelay │Details
├───────┼─────────┼──────────────────────┼─────────────────
│[ ] │[ ] │ 1.Contract-related disputes [ ] │
│ │ │ 2.Financial Factors such as Financing [ ] │
│ │ │ 3.Delay in authorization/permission, etc. [ ] │
│ │ │ 4.Complaints and other reasons [ ] │
───────┴───────┴─────────┴──────────────────────┴─────────────────
──────────────────────────────────────────────────────────────────
Major progress regarding project preparation
───────┬─────────────────┬────────────────────────────────────────
Date │Title │Content
───────┼─────────────────┼────────────────────────────────────────
│ │
───────┼─────────────────┼────────────────────────────────────────
│ │
───────┼─────────────────┼────────────────────────────────────────
│ │
───────┴─────────────────┴────────────────────────────────────────
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
(Page 4 of 6)
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
4-2. Authorization/Permission Stage
──────────┬─────┬────────────────────────────────────────────
Classification │Progress Stage │Details of Authorization, Permission, and Deliberation
│(Cumulative) ├───────────┬───────────────┬───────┬────────
│ │Detailed Status │ApplicationDate │Whether Additional Materials Are Required* │ApprovalDate
──────────┼─────┼───────────┼───────────────┼───────┼────────
Designation of Zone (District) │[ ] │ │ │[ ] │
──────────┼─────┼───────────┼───────────────┼───────┼────────
Selection of Project Implementer │[ ] │ │ │[ ] │
──────────┼─────┼───────────┼───────────────┼───────┼────────
ProjectImplementationPlan │[ ] │ │ │[ ] │
──────────┼─────┼───────────┼───────────────┼───────┼────────
Construction Execution │[ ] │ │ │[ ] │
──────────┼─────┼───────────┼───────────────┼───────┼────────
Completion and Approval for Use│[ ] │ │ │[ ] │
──────────┴─────┴───────────┴───────────────┴───────┴────────
Matters Delayed in Authorization, Permits, Deliberations, etc. (※ Must be completed if supplementation is required)
───────────────┬──┬──────────────────────────────────────────
Relevant Procedure │Date│Details
───────────────┼──┼──────────────────────────────────────────
│ │
├──┼──────────────────────────────────────────
│ │
├──┼──────────────────────────────────────────
│ │
───────────────┼──┼──────────────────────────────────────────
│ │
├──┼──────────────────────────────────────────
│ │
├──┼──────────────────────────────────────────
│ │
───────────────┴──┴──────────────────────────────────────────
─────────────────────────────────────────────────────────────
Key Progress
───┬──────────────┬──────────────────────────────────────────
on│Title │Contents
───┼──────────────┼──────────────────────────────────────────
│ │
───┼──────────────┼──────────────────────────────────────────
│ │
───┼──────────────┼──────────────────────────────────────────
│ │
───┼──────────────┼──────────────────────────────────────────
│ │
───┼──────────────┼──────────────────────────────────────────
│ │
───┴──────────────┴──────────────────────────────────────────
4-3. Construction Phase
──────┬──────────────┬─────────────────────┬─────────────────
Status of Commencement of Construction │Date of Commencement Notice │Scheduled Start Date │DateOfConstruction
├──────────────┼─────────────────────┼─────────────────
│ │ │
──────┼───────┬──────┼─────────────────────┼─────┬───────────
Delay in Commencement of Construction │DelayStatus │Date of Notification of Postponement of Construction Commencement│ReasonForDelay │Details │ScheduledResumptionDate
├───────┼──────┼─────────────────────┼─────┼───────────
│[ ] │ │1. Administrative and legal issues such as authorization and permits [ ] │ │
│ │ │2.Financial Issues such as Financing [ ] │ │
│ │ │3.Project Cost (Construction Cost) Problem [ ] │ │
│ │ │4.Business Plan Change [ ] │ │
│ │ │5.Complaints and other reasons [ ] │ │
──────┴───────┴──────┴─────────────────────┴─────┴───────────
──────┬──────────────┬───────────────────────────────────────
Before construction starts │Conversion to Main Project Financing (Drawdown) │Delay in Conversion to Main Project Financing (Drawdown)
Main Project Financing ├───────┬──────┼─────┬─────────────────────┬───────────
Conversion (Drawdown)│Whether Converted (Drawn Down)│Date of Conversion (Drawdown)│Delay Status │ReasonForDelay │Details
├───────┼──────┼─────┼─────────────────┬───┼───────────
│[ ] │ │[ ] │1.Delay in land acquisition │[ ]│
│ │ │ │2.Delay in authorization/permission │[ ]│
│ │ │ │3. Delay in Selecting and Contracting with a Contractor │[ ]│
│ │ │ │4.Failure to meet financial institution screening criteria │[ ]│
│ │ │ │5.Delay in securing presale guarantee │[ ]│
│ │ │ │6.Market Environment and External Factors │[ ]│
│ │ │ │7.Other │[ ]│
──────┴───────┴──────┴─────┴─────────────────┴───┴───────────
─────────────────────────────────────────────────────────────
Key progress regarding the commencement of construction
──────┬──────────────┬───────────────────────────────────────
Date │Title │Content
──────┼──────────────┼───────────────────────────────────────
│ │
──────┼──────────────┼───────────────────────────────────────
│ │
──────┼──────────────┼───────────────────────────────────────
│ │
──────┼──────────────┼───────────────────────────────────────
│ │
──────┼──────────────┼───────────────────────────────────────
│ │
──────┴──────────────┴───────────────────────────────────────
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
(Page 5 of 6)
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
4-4. Construction and Completion Phase
───┬─────────┬────────────────────────────────────────
Construction│Work Progress Rate (%) │Suspension of Construction
├────┬────┼────┬─────┬────────────────┬─────┬──────
│Plan │actual │Whether Construction Is Suspended│Date of Suspension │Reason for Suspension │Details │ScheduledResumptionDate
├────┼────┼────┼─────┼────────────────┼─────┼──────
│ │ │[ ] │ │1.Administrative and Legal Issues [ ] │ │
├────┴────┤ │ │2.Financial Issues such as Financing [ ] │ │
│Reason for construction delay │ │ │3.Project Cost (Construction Cost) Problem [ ] │ │
├─────────┤ │ │4. Accidents Involving Property or Personal Injury [ ] │ │
│ │ │ │5.Complaints and other reasons [ ] │ │
───┼─────┬───┴────┼─────┴────────────────┴─────┴──────
Completion│Estimated Completion Date│CompletionDate │Completion Delay
│(Planned) │(Actual) ├─────┬────────────────┬─────┬──────
│ │ │DelayStatus │ReasonForDelay │Details │Estimated Completion Date
├─────┼────────┼─────┼────────────────┼─────┼──────
│ │ │[ ] │1.Process Delay [ ] │ │
│ │ │ │2.Administrative and Legal Issues [ ] │ │
│ │ │ │3.Complaints and other reasons [ ] │ │
───┴─────┴────────┴─────┴────────────────┴─────┴──────
──────────────────────────────────────────────────────
Key Progress Reports on Construction and Completion
───┬──────────────┬───────────────────────────────────
Date│Title │Contents
───┼──────────────┼───────────────────────────────────
│ │
───┼──────────────┼───────────────────────────────────
│ │
───┼──────────────┼───────────────────────────────────
│ │
───┼──────────────┼───────────────────────────────────
│ │
───┼──────────────┼───────────────────────────────────
│ │
───┼──────────────┼───────────────────────────────────
│ │
───┴──────────────┴───────────────────────────────────
4-5. Presale Status
4-5-1. Sale (Presale) of Developed Land
──────┬──────────┬──────────┬─────┬──────────┬────────
Classification │All │Sale Plan │Sale (Presale)│Sale Completed │Sale Amount
├────┬─────┼────┬─────┤Start Date ├────┬─────┤(Cumulative, 100 million KRW)
│Area(㎡)│Number of Parcels (Pieces)│Area(㎡)│Number of Parcels (Pieces)│ │Area(㎡)│Number of plots(pieces)│
──────┼────┼─────┼────┼─────┼─────┼────┼─────┼────────
Total │ │ │ │ │ │ │ │
──────┼────┼─────┼────┼─────┼─────┼────┼─────┼────────
Residential Land│ │ │ │ │ │ │ │
┌────┼────┼─────┼────┼─────┼─────┼────┼─────┼────────
│ │ │ │ │ │ │ │ │
├────┼────┼─────┼────┼─────┼─────┼────┼─────┼────────
│ │ │ │ │ │ │ │ │
─┴────┼────┼─────┼────┼─────┼─────┼────┼─────┼────────
CommercialLand│ │ │ │ │ │ │ │
┌────┼────┼─────┼────┼─────┼─────┼────┼─────┼────────
│ │ │ │ │ │ │ │ │
├────┼────┼─────┼────┼─────┼─────┼────┼─────┼────────
│ │ │ │ │ │ │ │ │
─┴────┼────┼─────┼────┼─────┼─────┼────┼─────┼────────
IndustrialLand│ │ │ │ │ │ │ │
┌────┼────┼─────┼────┼─────┼─────┼────┼─────┼────────
│ │ │ │ │ │ │ │ │
├────┼────┼─────┼────┼─────┼─────┼────┼─────┼────────
│ │ │ │ │ │ │ │ │
─┴────┼────┼─────┼────┼─────┼─────┼────┼─────┼────────
··· │ │ │ │ │ │ │ │
┌────┼────┼─────┼────┼─────┼─────┼────┼─────┼────────
│ │ │ │ │ │ │ │ │
─┴────┴────┴─────┴────┴─────┴─────┴────┴─────┴────────
4-5-2. Sale (Presale) of Building Development Projects
───────┬────────┬────────────┬─────┬──────────┬───────
Classification │All │Sale Plan │Sale (Presale)│Sale Completed │Sale Amount
├────┬───┼──────┬─────┤Start Date ├────┬─────┤(Cumulative, 100 million KRW)
│Building │NumberOfHouseholds│Building │NumberOfHouseholds │ │Building │NumberOfHouseholds │
│ │(Number of Units)│ │(Number of Units) │ │ │(Number of Units) │
───────┼────┼───┼──────┼─────┼─────┼────┼─────┼───────
Total │ │ │ │ │ │ │ │
───────┼────┼───┼──────┼─────┼─────┼────┼─────┼───────
Multi-unit housing │ │ │ │ │ │ │ │
───────┼────┼───┼──────┼─────┼─────┼────┼─────┼───────
Commercial │ │ │ │ │ │ │ │
───────┼────┼───┼──────┼─────┼─────┼────┼─────┼───────
Industrial │ │ │ │ │ │ │ │
───────┼────┼───┼──────┼─────┼─────┼────┼─────┼───────
··· │ │ │ │ │ │ │ │
───────┴────┴───┴──────┴─────┴─────┴────┴─────┴───────
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
(Page 6 of 6)
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
Pursuant to Article 5(1) or Article 7(1) of the Act on the Management, etc. of Real Estate Development Projects and
Article 2(1) of its Enforcement Rule, I hereby report the business plan, etc. or project progress status as stated above.
Year month day
Reporter (Signature or seal)
Minister of Land, Infrastructure and Transport To:
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
─────┬───────────────────────────────────┬─────────────────────────
Attached Documents│ Supporting documents related to the business plan, etc. (copies of authorization/permission documents, copies of various contracts, etc.) │Fee
│ │No
─────┴───────────────────────────────────┴─────────────────────────
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
How to fill out
───────────────────────────────────────────────────────────────────
1. In item 1-1, Composition of Project Implementer, enter the number corresponding to the applicable purpose of participation in the classification field and describe
the specific details of participation in the details field.
①Construction Investor (CI), ②Operation Investor (OI), ③Financial Investor (FI)
2. For the restructuring status in items 1-2 and 1-3, mark the applicable box if the company is undergoing corporate rehabilitation proceedings under the Debtor Rehabilitation and Bankruptcy Act,
management by the lead creditor bank under a voluntary agreement, or joint creditor management (workout) under the Corporate Restructuring Promotion Act.
] Mark the applicable box.
3. For the bankruptcy status in items 1-2 and 1-3, mark the applicable box if the company has been dissolved or is undergoing or has completed liquidation
under the Commercial Act, or is undergoing or has completed bankruptcy proceedings under the Debtor Rehabilitation and Bankruptcy Act. ] Mark the applicable box.
4. In item 1-3, Status of Trust Companies, enter the number corresponding to the applicable trust type; if Other is selected, enter the trust type
in the Other Details field.
①Borrowing-type land trust, ②Management-type land trust, ③Land collateral trust, ④Others
5. In item 1-3, Status of Trust Companies, specify the method and details of credit enhancement; if that method is a commitment to guaranteed completion,
also state whether the completion deadline has been extended or has passed.
6. In item 1-4, Status of Guarantee Institutions, specify the guarantees for the development project and enter the number corresponding to the applicable guarantee type.
If Other is selected, describe the details in the Other Details field.
①PF Guarantee, ②Presale Guarantee, ③Others
7. Under the Other field for the project period in item 2, enter the period of operation if the project is operated after construction begins, or the planned date of liquidation
if the implementing corporation is to be liquidated, etc.
8. 2. In the land cost column of the total project cost in the business plan, enter the sum of land costs (including compensation amounts, purchase prices, etc.) and development costs, etc.
9. 2-1. Land Development Project Plan and 2-2. Construction Project Plan shall be prepared by modifying or adding fields according to the classification of the relevant development project plan.
10. 3-1. In the Repayment Priority column of Detailed Status by Financial Institution 1, enter the applicable type among the following repayment priority types with the number.
①Senior, ②Mezzanine, ③Subordinate, ④Single
11. In item 3-1, Detailed Status by Financial Institution 1, enter the number corresponding to the applicable classification type; if Other is selected, enter
the details in the Other Details field.
① Loan, ② Securitization, ③ Other
12. 3-1. In the 'Classification of Type' column of Detailed Status by Financial Institution 1, enter the applicable type from the following types with the number, and if 'Other' is selected, other
Write the details in the details section.
① Bridge Loan, ② Main Project Financing (PF), ③ Other
13. In item 3-2, Detailed Status by Financial Institution 2, enter additional financial details corresponding to item 3-1; ensure that the financial institution names
and serial numbers match those in item 3-1.
14. In item 4-2, Authorization and Permission Stage, mark the applicable box where a request for supplementation or a rejection has been received,
including where the deliberation outcome requires revision and renewed deliberation. ] Mark the applicable box.
15. In items 4-5-1 and 4-5-2, modify or add fields according to the type of development project plan
when completing the form.
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━