Form 12 — 수상레저기구의 등록 및 검사에 관한 법률 시행규칙
252615 · 2023-07-06
■ Enforcement Rule of the Act on the Registration and Inspection of Water Leisure Craft [Form 12]
Application for Trial Operation Permission
※ The applicant must not fill out sections with a dark background, and [ ] mark the applicable box with a check.
──────────┬───────────┬──────────────────┬──────────────────
Receipt Number │Receipt Date & Time │IssuanceDate │Processing Period 7 days
│ │ │
──────────┴───────────┴──────────────────┴──────────────────
───────┬─────────────────────────────┬──────────────────────
Applicant │Name │Resident Registration Number
│ │
├─────────────────────────────┼──────────────────────
│Address │Telephone Number
───────┴─────────────────────────────┴──────────────────────
───────┬─────────────────────────────┬──────────────────────
Operator │Name │Resident Registration Number
├─────────────────────────────┼──────────────────────
│Address │Telephone Number
───────┴─────────────────────────────┴──────────────────────
───────┬─────────────────────────────┬──────────────────────
Apply │Type of Craft │Name of Craft
Matters ├─────────────────────────────┴──────────────────────
│Purpose of Trial Operation
│ Construction [ ] modification[ ] Repair[ ]
├──────────────┬─────────────────────────────────────
│Departure │Trial Operation Area
├──────────────┴─────────────────────────────────────
│Trial Operation Period
│ Year month day ~ Year month day
───────┴────────────────────────────────────────────────────
────────────────────────────────────────────────────────────
Article 14 (1) of the Act on the Registration and Inspection of Water Leisure Craft, Article 11 (1) of its Enforcement Decree, and Article
10 (2) of its Enforcement Rule form the basis for this application for trial operation permission.
Year month day
Applicant (Signature or seal)
Head of Coast Guard Station
Mayor/County Governor/District Head Your
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
───────┬────────────────────────────────────────────┬───────
Attached Documents │ 1. One copy of the Trial Operation Plan │Fee
│ 2. One photograph each of the front, rear, left, and right sides of the power-driven water leisure craft used for trial operation │No
───────┴────────────────────────────────────────────┴───────
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
Important Notes
────────────────────────────────────────────────────────────
1. There are no restrictions on the size or format of the photograph of the power-driven water leisure craft, but the exterior of the said power-driven water leisure craft must be visible.
2. For the trial operation departure point, enter the address of the region where the power-driven water leisure craft actually departs.
3. The trial operation area is permitted only within 10 nautical miles in a straight line from the departure point.
4. The trial operation period shall not exceed 7 days, and operations may be conducted from 30 minutes before sunrise to 30 minutes after sunset.
────────────────────────────────────────────────────────────
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
Processing Procedure
────────────────────────────────────────────────────────────
┌──────┐ ┌───┐ ┌───┐ ┌────────────────┐ ┌───────┐ ┌────────┐
│Complete application │?│Accept │?│Review │?│Approval │?│Trial Operation Permit│?│Trial Operation Permit │
│ │ │ │ │ │ │ │ │Create │ │Issue │
└──────┘ └───┘ └───┘ └────────────────┘ └───────┘ └────────┘
Applicant Processing Agency: Coast Guard Station or City/County/District
────────────────────────────────────────────────────────────
210㎜×297㎜[White Paper (80g/㎡)]