Form 4 — 전기안전관리법 시행규칙
287605 · 2026-07-01
■ Enforcement Rules of the Electric Safety Management Act [Attachment Form No. 4] <Amended Oct. 1, 2025>
Pre-use Inspection Application Form
※ The applicant does not fill out sections with a dark background. (front)
───────────────┬───────┬─────────────────────────────────────────
Receipt Number │Date of Receipt │Processing Period
───────────────┴───────┴─────────────────────────────────────────
─────┬───────────────┬───────────────────────────────────────────
Applicant │Representative Name │Telephone Number
├───────────────┼───────────────────────────────────────────
│Company Name or Trade Name │Business Registration Number
├───────────────┴───────────────────────────────────────────
│Address
─────┴───────────────────────────────────────────────────────────
─────┬───────────────┬───────────────────────────────────────────
Contractor │Representative Name │Telephone Number
│?? │
├───────────────┼───────────────────────────────────────────
│Company Name or Trade Name │Electrical Construction Business Registration Number First 호
├───────────────┴───────────────────────────────────────────
│Address
─────┴───────────────────────────────────────────────────────────
──────────────┬──────────────────────────────────────────────────
Regarding electrical facilities to be inspected │
Workplace Name and Location │
──────────────┼──────────────────────────────────────────────────
Electrical Equipment Usage and Industries │
──────────────┼──────────────────────────────────────────────────
Electrical Equipment Overview │
──────────────┼──────────────────────────────────────────────────
Construction process to be inspected │
──────────────┼──────────────────────────────────────────────────
DesiredTestDate │ Year month day
──────────────┼──────────────────────────────────────────────────
Desired Inspection Date │ Year month day
──────────────┴──────────────────────────────────────────────────
In accordance with Article 9 of the Electric Safety Management Act and Article 6, Paragraph 5 of the Enforcement Rules of the same Act, I hereby apply for a pre-use inspection as stated above.
Year month day
Applicant (Signature or seal)
Korea Electrical Safety Corporation To
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
──────┬──────────────────────────────────────────────┬───────────
Attached Documents │ 1. Copy of Construction Plan Approval or Report Acceptance (excluding cases of low-voltage private electrical facilities) 1 copy │Fee
│ 2. Design documents pursuant to Article 2, Subparagraph 3 of the Electric Power Technology Management Act and pursuant to Article 12-2, Paragraph 4 of the Electric Power Technology Management Act │「Electrical Safety Management Act」
│Confirmation of Assignment of Supervisor (Applicable only to installation work for low-voltage private electrical facilities, and low-voltage private electrical facilities │In accordance with Article 42, climate
│) 1 copy │By the Ordinance of the Ministry of Energy and Environment
│ 3. Documents verifying in-house supervision (Applicable only when the Electrical Safety Manager conducts in-house supervision) 1 copy │The amount to be determined
│ 4. One copy of the Certificate of Reporting the Appointment of Electrical Safety Manager │
│ 5. Documents required for conducting pre-use inspections as notified by the Minister of Climate, Energy and Environment │
──────┴──────────────────────────────────────────────┴───────────
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
How to write
─────────────────────────────────────────────────────────────────
In the Electrical Equipment Overview section, enter the type and capacity of the electrical equipment.
─────────────────────────────────────────────────────────────────
210㎜×297㎜[White Paper (80g/㎡)]
(rear)
━━━━━━━━━━━━━━━━━━━━━━━━
━━━━━━━━━━━━━━━━━━━━━━━━
ProcessingProcedure
────────────────────────
This application will be processed as follows.
┌───────────┬──────────┐
│Applicant │ProcessingAgency │
│ ├──────────┤
│ │Korea Electrical Safety Corporation│
├───────────┼──────────┤
│ │ │
│┌───────┐ │ ┌──────┐│
││Fill out application form │ │ ▶│Receipt 수 ││
││ ├──┼─ │ ││
││ │ │ │ ││
│└───────┘ │ └────┬─┘│
│ │ │ │
│ │ │ │
│ │ │ │
│ │ │
│ │ ▼ │
│ │ ┌──────┐│
│ │ │Review 토 ││
│ │ │ ││
│ │ │ ││
│ │ └────┬─┘│
│ │ │ │
│ │ │ │
│ │ │ │
│ │ │
│ │ ▼ │
│ │ ┌──────┐│
│ │ │Check ││
│ │ └────┬─┘│
│ │ │ │
│ │ │ │
│ │ │ │
│ │ │
│ │ ▼ │
│┌───────┐ │ ┌──────┐│
││Notification of Inspection Results │◀ │ │Conclusion jeong ││
││ │ ─┼──┤ ││
││ │ │ │ ││
│└───────┘ │ └──────┘│
│ │ │
└───────────┴──────────┘
210㎜×297㎜[White Paper (80g/㎡)]