Form 6 — 건축물관리법 시행규칙
271531 · 2025-06-02
■ Enforcement Rules of the Building Management Act [Form No. 6-11] <Newly Inserted Aug. 4, 2022>
Building Demolition Site Safety Checklist
(Page 1 of 6)
───────────┬──────────────────────────────────────────
Demolition Equipment │□ Lifting demolition equipment onto the building
Whether Equipment Is Mounted │
│□ Do not lift demolition equipment onto the building
───────────┴──────────────────────────────────────────
Safety Management Checklist
──────┬────┬──────────────────────────┬───────┬───────
Buildings and │Structural Type│ │Date and Time of Inspection │
Dismantling site ├────┼──────────────────────────┼───┬───┼───────
Info │floors │ (Ground) (Underground) │Responsible │Affiliation │
├────┼──────────────────────────┤Inspector│ │
│Scope of Demolition│ │ ├───┼───────
├────┼──────────────────────────┤ │Position │
│Contractor │ │ ├───┼───────
│ │ │ │Contact│
├────┼┬───┬─────────────────────┤ ├───┼───────
│On-site manager││Contact│ │ │Name │(Signature)
├────┼┴───┴─────────────────────┤ ├───┼───────
│Construction Period│ Year month day ~ Year month ( (Daily) │ │Remarks │
├────┼──────────────────────────┤ │ │
│Site Address│ │ │ │
──────┴────┼──────────────────────────┼───┴───┴───────
Inspection Items │Inspection Details │Inspection Result
│ ├───┬───┬───────
│ │Titration │Inadequate│Inspector's Comments
───────────┼──────────────────────────┼───┼───┼───────
1. Decommissioning Plan and │? Dismantling Permit (Notification) Status [ ] Grant [ ] Report │ │ │
Decommissioning Supervisor ├──────────────────────────┼───┼───┼───────
│? Status of dismantling supervision contract conclusion [ ] Conclusion [ ] Not concluded │ │ │
├──────────────────────────┼───┼───┼───────
│? On-site presence of demolition supervisors [ ] Sangju [ ] Non-resident │ │ │
├──────────────────────────┼───┼───┼───────
│? Appropriateness of Supervision Work Log Contents and Lifecycle Information System │ │ │
│whether the supervision log is entered daily in the building life-cycle history information system │ │ │
├──────────────────────────┼───┼───┼───────
│? Appropriateness of the contents of the safety inspection checklist prepared by the supervisor │ │ │
───────────┼──────────────────────────┼───┼───┼───────
2. Preliminary Research │Demolition regarding the current status of the building, extension and renovation history, etc. │ │ │
│Whether the plan author conducted a preliminary site survey │ │ │
───────────┼──────────────────────────┼───┼───┼───────
3. Surrounding Environment Survey │Road conditions for the removal of waste prior to the demolition of buildings and │ │ │
│Review of Possibility of Damage in Areas Near Demolition Site │ │ │
│Whether │ │ │
├──────────────────────────┼───┼───┼───────
│? Installation of power, gas, and water supply facilities, information and communication cables, etc.│ │ │
│Whether the author of the decommissioning plan has confirmed the current status of the value │ │ │
───────────┼──────────────────────────┼───┼───┼───────
4. Temporary facilities and │Temporary facilities according to the demolition plan (external scaffolding, construction use │ │ │
Building Exterior Survey │Temporary fences, safety handrails, and worker safety passageways, etc.) Installation │ │ │
│appropriateness of installation locations │ │ │
├──────────────────────────┼───┼───┼───────
│? [Applicable only to cases where equipment is lifted for dismantling] Building Demolition │ │ │
│Whether external scaffolding is dismantled in a timely manner according to the process │ │ │
├──────────────────────────┼───┼───┼───────
│Interior materials at risk of separation or falling during building demolition · │ │ │
│Whether exterior materials are removed in advance │ │ │
───────────┴──────────────────────────┴───┴───┴───────
210mm×297mm[White Paper (80g/㎡)]
(Page 2 of 6)
┌─────────┬───────────────────────────┬──────────────────┐
│Inspection Items │Inspection Details │Inspection Result │
│ │ ├──┬───┬───────────┤
│ │ │Titration│Inadequate│Reviewer's Comments │
├─────────┼───────────────────────────┼──┼───┼───────────┤
│5. Structural Safety Plan │? Structural Safety Review Report [ ] Yes [ ] None │ │ │ │
│structural safety under the applicable standards ├───────────────────────────┼──┼───┼───────────┤
│Confirm │? [Applicable only when lifting equipment for disassembly] Jack Support(jack │ │ │ │
│ │support) Suitability of installation quantity and installation status │ │ │ │
│ ├───────────────────────────┼──┼───┼───────────┤
│ │? Compliance with the dismantling sequence specified in the dismantling plan │ │ │ │
│ ├───────────────────────────┼──┼───┼───────────┤
│ │? Suitability of Equipment Capacity (ton) │ │ │ │
│ ├───────────────────────────┼──┼───┼───────────┤
│ │? [Equipment Loading Only] Movement of Dismantling Equipment According to Dismantling Plan │ │ │ │
│ │Whether the movement path and the actual movement path coincide │ │ │ │
│ ├───────────────────────────┼──┼───┼───────────┤
│ │? Whether demolition debris is piled up on the slab (40cm or less │ │ │ │
│ │Storage Status) │ │ │ │
│ ├───────────────────────────┼──┼───┼───────────┤
│ │? Installation of openings and drains for debris removal│ │ │ │
│ │appropriateness of the locations of openings and debris chutes │ │ │ │
├─────────┼───────────────────────────┼──┼───┼───────────┤
│6. Safety Measures and │? Compliance with safety measures for workers and adjacent buildings │ │ │ │
│By-product processing ├───────────────────────────┼──┼───┼───────────┤
│ │? Pedestrian safety facilities installed at demolition sites and surrounding areas, │ │ │ │
│ │Appropriateness of management of fall protection nets and protective facilities, etc. │ │ │ │
│ │Status │ │ │ │
│ ├───────────────────────────┼──┼───┼───────────┤
│ │? Compliance with the "Noise and Vibration Control Act" │ │ │ │
│ ├───────────────────────────┼──┼───┼───────────┤
│ │? Establishment and implementation of preventive measures against fugitive dust │ │ │ │
│ ├───────────────────────────┼──┼───┼───────────┤
│ │? Establishment of waste treatment plan? Implementation status │ │ │ │
│ ├───────────────────────────┼──┼───┼───────────┤
│ │? Appropriateness of Response Measures in Case of Safety Accidents │ │ │ │
├─────────┼───────┬───────────────────┴──┴───┴───────────┤
│Overall Inspection Results │Emergency Safety Measures │[ ] Required [ ] Unnecessary │
│ ├───────┼──────────────────────────────────────┤
│ │Reinforcement Measures │[ ] Required [ ] Unnecessary │
│ ├───────┼──────────────────────────────────────┤
│ │Safety Diagnosis │[ ] Required [ ] Unnecessary │
├─────────┼───────┴──────────────────────────────────────┤
│Comments and Special Notes │ │
├─────────┴──────────────────────────────────────────────┤
│ ※ The inspector must take photos or videos, etc. of the building demolition site. │
│ ※ If matters requiring urgent action are discovered during the on-site inspection, the inspector must immediately implement safety measures. │
│. │
└────────────────────────────────────────────────────────┘
210mm×297mm[White Paper (80g/㎡)]
(Page 3 of 6)
──────────────────
Safety Checklist
────────┬─────────
In addition to │
Safety Management │
additionally │
requiring verification │
Matters │
────────┴─────────
(Page 4 of 6)
───────────────────────────
Exterior Survey of Temporary Facilities and Buildings
─────────┬──┬──────────────
Classification │Photo│Remarks
│ │(Situation description, etc.)
─────────┼──┼──────────────
Temporary Fence │ │
and │ │
Temporary Sound Barrier │ │
Installation Status │ │
─────────┼──┼──────────────
Pedestrian │ │
Safety Measures │ │
State │ │
─────────┼──┼──────────────
Falling object prevention │ │
Action Status │ │
─────────┼──┼──────────────
Exterior Scaffolding │ │
Status │ │
─────────┼──┼──────────────
Material with risk of falling off │ │
Removal Status │ │
─────────┼──┼──────────────
Other Matters │ │
─────────┴──┴──────────────
(Page 5 of 6)
──────────────────────────────
Verification of Structural Safety According to Structural Safety Plan
────────┬──┬──────────────────
Classification │Photo│Remarks
│ │(Situation description, etc.)
────────┼──┼──────────────────
Jack Support │ │
Batch Status │ │
────────┼──┼──────────────────
residue │ │
Storage Status │ │
(Above slab, etc.)│ │
────────┼──┼──────────────────
Waste │ │
Processing Status │ │
────────┼──┼──────────────────
Removal of Residual Material │ │
opening and │ │
Install Drop Hole │ │
Position │ │
────────┼──┼──────────────────
Major Dismantling Equipment │ │
Status │ │
────────┼──┼──────────────────
Exterior wall conduction │ │
Prevention Device │ │
Installation Status │ │
────────┼──┼──────────────────
Other Matters │ │
────────┴──┴──────────────────
(Page 6 of 6)
────────────────────
Status of Other Safety Measures
───────┬──┬─────────
Classification │Photo│Remarks
│ │(Situation description, etc.)
───────┼──┼─────────
Noise & Vibration │ │
prevention device │ │
Installation Status │ │
───────┼──┼─────────
Dust prevention device│ │
Installation Status │ │
───────┼──┼─────────
Other Matters│ │
───────┴──┴─────────