Form 6 — 건축물관리법 시행규칙

271531 · 2025-06-02

■ Enforcement Rules of the Building Management Act [Form No. 6-11] <Newly Inserted Aug. 4, 2022> Building Demolition Site Safety Checklist (Page 1 of 6) ───────────┬────────────────────────────────────────── Demolition Equipment │□ Lifting demolition equipment onto the building Whether Equipment Is Mounted │ │□ Do not lift demolition equipment onto the building ───────────┴────────────────────────────────────────── Safety Management Checklist ──────┬────┬──────────────────────────┬───────┬─────── Buildings and │Structural Type│ │Date and Time of Inspection │ Dismantling site ├────┼──────────────────────────┼───┬───┼─────── Info │floors │ (Ground) (Underground) │Responsible │Affiliation │ ├────┼──────────────────────────┤Inspector│ │ │Scope of Demolition│ │ ├───┼─────── ├────┼──────────────────────────┤ │Position │ │Contractor │ │ ├───┼─────── │ │ │ │Contact│ ├────┼┬───┬─────────────────────┤ ├───┼─────── │On-site manager││Contact│ │ │Name │(Signature) ├────┼┴───┴─────────────────────┤ ├───┼─────── │Construction Period│ Year month day ~ Year month ( (Daily) │ │Remarks │ ├────┼──────────────────────────┤ │ │ │Site Address│ │ │ │ ──────┴────┼──────────────────────────┼───┴───┴─────── Inspection Items │Inspection Details │Inspection Result │ ├───┬───┬─────── │ │Titration │Inadequate│Inspector's Comments ───────────┼──────────────────────────┼───┼───┼─────── 1. Decommissioning Plan and │? Dismantling Permit (Notification) Status [ ] Grant [ ] Report │ │ │ Decommissioning Supervisor ├──────────────────────────┼───┼───┼─────── │? Status of dismantling supervision contract conclusion [ ] Conclusion [ ] Not concluded │ │ │ ├──────────────────────────┼───┼───┼─────── │? On-site presence of demolition supervisors [ ] Sangju [ ] Non-resident │ │ │ ├──────────────────────────┼───┼───┼─────── │? Appropriateness of Supervision Work Log Contents and Lifecycle Information System │ │ │ │whether the supervision log is entered daily in the building life-cycle history information system │ │ │ ├──────────────────────────┼───┼───┼─────── │? Appropriateness of the contents of the safety inspection checklist prepared by the supervisor │ │ │ ───────────┼──────────────────────────┼───┼───┼─────── 2. Preliminary Research │Demolition regarding the current status of the building, extension and renovation history, etc. │ │ │ │Whether the plan author conducted a preliminary site survey │ │ │ ───────────┼──────────────────────────┼───┼───┼─────── 3. Surrounding Environment Survey │Road conditions for the removal of waste prior to the demolition of buildings and │ │ │ │Review of Possibility of Damage in Areas Near Demolition Site │ │ │ │Whether │ │ │ ├──────────────────────────┼───┼───┼─────── │? Installation of power, gas, and water supply facilities, information and communication cables, etc.│ │ │ │Whether the author of the decommissioning plan has confirmed the current status of the value │ │ │ ───────────┼──────────────────────────┼───┼───┼─────── 4. Temporary facilities and │Temporary facilities according to the demolition plan (external scaffolding, construction use │ │ │ Building Exterior Survey │Temporary fences, safety handrails, and worker safety passageways, etc.) Installation │ │ │ │appropriateness of installation locations │ │ │ ├──────────────────────────┼───┼───┼─────── │? [Applicable only to cases where equipment is lifted for dismantling] Building Demolition │ │ │ │Whether external scaffolding is dismantled in a timely manner according to the process │ │ │ ├──────────────────────────┼───┼───┼─────── │Interior materials at risk of separation or falling during building demolition · │ │ │ │Whether exterior materials are removed in advance │ │ │ ───────────┴──────────────────────────┴───┴───┴─────── 210mm×297mm[White Paper (80g/㎡)] (Page 2 of 6) ┌─────────┬───────────────────────────┬──────────────────┐ │Inspection Items │Inspection Details │Inspection Result │ │ │ ├──┬───┬───────────┤ │ │ │Titration│Inadequate│Reviewer's Comments │ ├─────────┼───────────────────────────┼──┼───┼───────────┤ │5. Structural Safety Plan │? Structural Safety Review Report [ ] Yes [ ] None │ │ │ │ │structural safety under the applicable standards ├───────────────────────────┼──┼───┼───────────┤ │Confirm │? [Applicable only when lifting equipment for disassembly] Jack Support(jack │ │ │ │ │ │support) Suitability of installation quantity and installation status │ │ │ │ │ ├───────────────────────────┼──┼───┼───────────┤ │ │? Compliance with the dismantling sequence specified in the dismantling plan │ │ │ │ │ ├───────────────────────────┼──┼───┼───────────┤ │ │? Suitability of Equipment Capacity (ton) │ │ │ │ │ ├───────────────────────────┼──┼───┼───────────┤ │ │? [Equipment Loading Only] Movement of Dismantling Equipment According to Dismantling Plan │ │ │ │ │ │Whether the movement path and the actual movement path coincide │ │ │ │ │ ├───────────────────────────┼──┼───┼───────────┤ │ │? Whether demolition debris is piled up on the slab (40cm or less │ │ │ │ │ │Storage Status) │ │ │ │ │ ├───────────────────────────┼──┼───┼───────────┤ │ │? Installation of openings and drains for debris removal│ │ │ │ │ │appropriateness of the locations of openings and debris chutes │ │ │ │ ├─────────┼───────────────────────────┼──┼───┼───────────┤ │6. Safety Measures and │? Compliance with safety measures for workers and adjacent buildings │ │ │ │ │By-product processing ├───────────────────────────┼──┼───┼───────────┤ │ │? Pedestrian safety facilities installed at demolition sites and surrounding areas, │ │ │ │ │ │Appropriateness of management of fall protection nets and protective facilities, etc. │ │ │ │ │ │Status │ │ │ │ │ ├───────────────────────────┼──┼───┼───────────┤ │ │? Compliance with the "Noise and Vibration Control Act" │ │ │ │ │ ├───────────────────────────┼──┼───┼───────────┤ │ │? Establishment and implementation of preventive measures against fugitive dust │ │ │ │ │ ├───────────────────────────┼──┼───┼───────────┤ │ │? Establishment of waste treatment plan? Implementation status │ │ │ │ │ ├───────────────────────────┼──┼───┼───────────┤ │ │? Appropriateness of Response Measures in Case of Safety Accidents │ │ │ │ ├─────────┼───────┬───────────────────┴──┴───┴───────────┤ │Overall Inspection Results │Emergency Safety Measures │[ ] Required [ ] Unnecessary │ │ ├───────┼──────────────────────────────────────┤ │ │Reinforcement Measures │[ ] Required [ ] Unnecessary │ │ ├───────┼──────────────────────────────────────┤ │ │Safety Diagnosis │[ ] Required [ ] Unnecessary │ ├─────────┼───────┴──────────────────────────────────────┤ │Comments and Special Notes │ │ ├─────────┴──────────────────────────────────────────────┤ │ ※ The inspector must take photos or videos, etc. of the building demolition site. │ │ ※ If matters requiring urgent action are discovered during the on-site inspection, the inspector must immediately implement safety measures. │ │. │ └────────────────────────────────────────────────────────┘ 210mm×297mm[White Paper (80g/㎡)] (Page 3 of 6) ────────────────── Safety Checklist ────────┬───────── In addition to │ Safety Management │ additionally │ requiring verification │ Matters │ ────────┴───────── (Page 4 of 6) ─────────────────────────── Exterior Survey of Temporary Facilities and Buildings ─────────┬──┬────────────── Classification │Photo│Remarks │ │(Situation description, etc.) ─────────┼──┼────────────── Temporary Fence │ │ and │ │ Temporary Sound Barrier │ │ Installation Status │ │ ─────────┼──┼────────────── Pedestrian │ │ Safety Measures │ │ State │ │ ─────────┼──┼────────────── Falling object prevention │ │ Action Status │ │ ─────────┼──┼────────────── Exterior Scaffolding │ │ Status │ │ ─────────┼──┼────────────── Material with risk of falling off │ │ Removal Status │ │ ─────────┼──┼────────────── Other Matters │ │ ─────────┴──┴────────────── (Page 5 of 6) ────────────────────────────── Verification of Structural Safety According to Structural Safety Plan ────────┬──┬────────────────── Classification │Photo│Remarks │ │(Situation description, etc.) ────────┼──┼────────────────── Jack Support │ │ Batch Status │ │ ────────┼──┼────────────────── residue │ │ Storage Status │ │ (Above slab, etc.)│ │ ────────┼──┼────────────────── Waste │ │ Processing Status │ │ ────────┼──┼────────────────── Removal of Residual Material │ │ opening and │ │ Install Drop Hole │ │ Position │ │ ────────┼──┼────────────────── Major Dismantling Equipment │ │ Status │ │ ────────┼──┼────────────────── Exterior wall conduction │ │ Prevention Device │ │ Installation Status │ │ ────────┼──┼────────────────── Other Matters │ │ ────────┴──┴────────────────── (Page 6 of 6) ──────────────────── Status of Other Safety Measures ───────┬──┬───────── Classification │Photo│Remarks │ │(Situation description, etc.) ───────┼──┼───────── Noise & Vibration │ │ prevention device │ │ Installation Status │ │ ───────┼──┼───────── Dust prevention device│ │ Installation Status │ │ ───────┼──┼───────── Other Matters│ │ ───────┴──┴─────────