■ Enforcement Rules of the Special Act on Underground Safety Management [Attachment Form No. 4] <Amended Jan. 28, 2022>
(Page 1 of 4)
Notification of Results of Underground Safety Survey After Commencement of Construction
(Results of the ○th year investigation during construction/operation in ○○○○ year)
1. Business Overview
a. General Status
┌──────────────────────────────────────┐
│Project Name (Project Type) │
├──────────────────────────────────────┤
│Workplace Location │
├──────────┬───────────────────────────┤
│Project Operator (Construction Contractor) │Name │
│ ├───────────────────────────┤
│ │Telephone Number │
│ ├───────────────────────────┤
│ │Location │
├──────────┴───────────────────────────┤
│Consultative Agency │
├──────────────────────────────────────┤
│Approving Authority │
├────────────────┬─────────────────────┤
│Date of Environmental Impact Assessment Consultation (Year/Month/Day) │Document Number │
├────────────────┼─────────────────────┤
│Date of Reconsultation (or Consultation on Changes) (Year/Month/Day) │Document Number │
├────────────────┼─────────────────────┤
│Date of Approval of Project Plan (Year/Month/Day) │Document Number │
├──────────┬─────┴─────────────────────┤
│Date of Approval of Changes to Project Plan │1st │
│(Year/Month/Day) ├───────────────────────────┤
│ │2nd │
│ ├───────────────────────────┤
│ │3rd │
├──────────┴───────────────────────────┤
│Date of Commencement (Scheduled) (Year/Month/Day) │
├──────────────────────────────────────┤
│Date of Completion (Scheduled) (Year/Month/Day) │
├──────────────────────────────────────┤
│Project Scale │
├──────────────────────────────────────┤
│Project Cost (100 million KRW) │
├──────────────────────────────────────┤
│Progress Rate (%) │
├──────────┬───────────────────────────┤
│Post-Commencement Underground Safety Survey Report│Location │
│Author ├───────────────────────────┤
│ │Telephone Number │
├──────────┼────┬──────────────────────┤
│Post-Commencement Underground Safety Survey │All │ Year month ~ Year Month( Year)│
│Investigation Period ├────┼──────────────────────┤
│ │This time │ Year month ~ Year month │
└──────────┴────┴──────────────────────┘
210㎜×297㎜[White Paper (80g/㎡)]
(Page 2 of 4)
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
B. Project Progress Status
┌─────────┬─────────────────────────────────────┐
│Scale by Facility │ │
└─────────┴─────────────────────────────────────┘
※ Please prepare the site area and facility installation details by complex separately, and attach the project district location map.
※ If the area at the time of underground safety assessment consultation differs from the area at the time of business plan approval, please fill out the form separately.
┌─────────┬─────────────────────────────────────┐
│Progress Rate │ │
└─────────┴─────────────────────────────────────┘
※ Please prepare this by classifying the overall progress rate and detailed progress rates (civil engineering, construction, etc.), and the installation status by major facilities.
2. Project Implementation History
┌─────────┬─────────────────────────────────────┐
│Project History │ │
└─────────┴─────────────────────────────────────┘
※ Write the dates and key details of underground safety assessment consultations (change consultations) or business plan (change) approvals, etc. conducted to date.
3. Details of Underground Safety Assessment and Measures Based on Investigation Results, etc.
A. Details of Underground Safety Assessment
┌────────┬──────────────────┬──────────┬─────┬──┐
│Classification │Underground Safety Assessment Report │Underground Impact │Review Results │Action│
│ ├────────┬─────────┤Survey Results │(Including Cause Analysis) │Matters│
│ │Subsurface Conditions │Prediction of Subsurface Impacts │ │included) │ │
├─────┬──┼──┬──┬──┼────┬────┼──┬───┬───┤ │ │
│Item │Detail│Survey│Investigation│Investigation│Secure │Secure │Investigation│Investigation │Investigation │ │ │
│ │Item│Investigation Location│Date│Result│Method │Plan │Survey Location│Date │Result │ │ │
│ │ │ │ │ │Before establishment │After establishment │ │ │ │ │ │
├─────┼──┼──┼──┼──┼────┼────┼──┼───┼───┼─────┼──┤
│Groundwater Survey│ │ │ │ │ │ │ │ │ │ │ │
├─────┼──┼──┼──┼──┼────┼────┼──┼───┼───┼─────┼──┤
│Underground │ │ │ │ │ │ │ │ │ │ │ │
│Soundness Investigation│ │ │ │ │ │ │ │ │ │ │ │
├─────┼──┼──┼──┼──┼────┼────┼──┼───┼───┼─────┼──┤
│Other │ │ │ │ │ │ │ │ │ │ │ │
│Item │ │ │ │ │ │ │ │ │ │ │ │
└─────┴──┴──┴──┴──┴────┴────┴──┴───┴───┴─────┴──┘
※ Describe investigation results for each item in accordance with the underground safety investigation plan in the underground safety assessment report (if the plan has changed, describe the changes and
reasons) and attach a map showing the survey locations.
(Page 3 of 4)
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
B. Measures and Evaluation Based on Underground Safety Assessment Results
┌─────────┬──────────────────────────────────────────────────┐
│Measures Taken │Occurrence of Ground Subsidence (Sinkholes), Resulting Damage and Risk of Further Damage │
│ ├──────────────────────────────────────────────────┤
│ │Measures Taken to Prevent Damage from Ground Subsidence (Sinkholes) and Their Results │
│ ├──────────────────────────────────────────────────┤
│ │Date of Notification to Approving and Consulting Agencies │
└─────────┴──────────────────────────────────────────────────┘
※ If measures have been taken based on the post-commencement underground safety survey results to prevent ground subsidence damage to the surrounding area, describe the measures
as follows.
┌─────────┬──────────────────────────────────────────────────┐
│Evaluation Results │ │
└─────────┴──────────────────────────────────────────────────┘
※ Compare and analyze the subsurface conditions, such as groundwater levels and subsurface integrity, presented in the underground safety assessment report against the survey findings from the commencement year to the present,
evaluate them and present the findings clearly in comparison tables, analysis charts, graphs, etc.
※ If the predicted values in the underground safety assessment report differ from the investigation results, analyze the cause and list the additional mitigation measures prepared.
4. Status of Management and Implementation of Consultation Contents
┌─────────┬──────────────────────────────────────────────────┐
│Consultation Details │ │
│Management Status │ │
└─────────┴──────────────────────────────────────────────────┘
※ Describe the status of managing consultation requirements, including the duties of the management organization and individual managers and implementation plans for underground safety measures for each assessment item
in this section.
┌─────────┬────────┬─────────┬───────────────────────────────┐
│Minor │Business Plan Change Date │Business Plan Change Details │Details of Underground Safety Measures │
│of Business Plan ├────────┼─────────┼───────────────────────────────┤
│Changes │ │ │ │
│(Complete only if changes │ │ │ │
│have been made) │ │ │ │
└─────────┴────────┴─────────┴───────────────────────────────┘
※ Describe minor changes to the project plan independently made by the project operator without review by the head of the approving authority under Article 7 and the underground safety
measures prepared in response to those changes.
┌─────────┬────────┬────┬───┬────┬───────────────────────────┐
│Consultation Details │Consultation Details │Date of Investigation│Progress Rate│Implementation Details│Unimplemented Matters and │
│Implementation Status │ │ │(%) │ │Follow-up Measures │
│ ├────────┼────┼───┼────┼───────────────────────────┤
│ │ │ │ │ │ │
└─────────┴────────┴────┴───┴────┴───────────────────────────┘
※ Record the results of the self-inspection regarding whether the mitigation measures (including consultation opinions) presented in the underground safety assessment report are being properly implemented, and the implementation status
Complete each item such as groundwater level and underground integrity, and record the progress rate by classifying it into civil engineering, construction, etc.
※ For implementation items, list follow-up measures and attach photos verifying the project progress.
(Page 4 of 4)
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
5. Results of investigation by the approving or consultative body and details of measures (or action plan)
┌────┬─────────┬─────┬──────┬──────────┐
│Date of Investigation│Approval or Consultation Agency│Consultation Details │Unimplemented Matters │Remarks │
│ │ │Non-fulfillment│Details of Measures │ │
│ │ │ │(or plan) │ │
├────┼─────────┼─────┼──────┼──────────┤
│ │ │ │ │ │
└────┴─────────┴─────┴──────┴──────────┘
6. Comprehensive Evaluation of Post-Construction Underground Safety Survey Results
┌──────────────────────────────────────┐
│ │
└──────────────────────────────────────┘
※ Based on the predictions of subsurface conditions in the underground safety assessment report and the results of post-commencement surveys, comprehensively analyze issues concerning the survey plan, prediction and analysis techniques (including modeling) and
the conduct of the post-commencement underground safety survey, and describe measures for improvement.
7. Appendix
A. Current Status of Specialized Underground Safety Assessment Agencies
┌──────────────────────────────────────┐
│Company Status │
├────┬─────────┬─────┬──────┬──────────┤
│Company name │Representative │Registration number │Location │Contact │
│ │ │ │ │(Phone Number, Fax Number)│
├────┼─────────┼─────┼──────┼──────────┤
│ │ │ │ │ │
└────┴─────────┴─────┴──────┴──────────┘
┌──────────────────────────────────────┐
│Investigator Personal Information │
├─────┬─────────┬─────┬──────┬─────────┤
│Classification │Affiliation │Name │Position │Qualifications and Licenses │
├─────┼─────────┼─────┼──────┼─────────┤
│Overall Supervisor │ │ │ │ │
├──┬──┼─────────┼─────┼──────┼─────────┤
│Senior│Civil Engineering│ │ │ │ │
│ ├──┼─────────┼─────┼──────┼─────────┤
│ │: │ │ │ │ │
├──┼──┼─────────┼─────┼──────┼─────────┤
│Intermediate│Civil Engineering│ │ │ │ │
│ ├──┼─────────┼─────┼──────┼─────────┤
│ │: │ │ │ │ │
├──┼──┼─────────┼─────┼──────┼─────────┤
│Junior│Civil Engineering│ │ │ │ │
│ ├──┼─────────┼─────┼──────┼─────────┤
│ │: │ │ │ │ │
└──┴──┴─────────┴─────┴──────┴─────────┘
B. Measurement Results Report for Underground Safety Survey After Commencement of Construction
c. Copies of permits, approvals and other related documents, or other supporting documentation that may be required
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━