Form 2 — 지하안전관리에 관한 특별법 시행규칙
264555 · 2024-07-30
■ Enforcement Rules of the Special Act on Underground Safety Management [Attachment Form No. 2]
Notification of Results of Incorporating Consultation Requirements (Action Results or Action Plan)
1. Business Overview
a. Project Name:
b. Location of Project Site:
c. Project Implementer (Phone Number):
d. Scheduled Start Date (Scheduled Completion Date):
e. Approving Authority Name:
2. Project Plan, etc. (Approved) Details
┌───┬────┬──────────┬────┬──┐
│Category Classification│Consultation Details│Project Plan (Approved) Details │Consultation Details│Remarks│
│ │ │ │Reflected Documents│ │
├───┼────┼──────────┼────┼──┤
│ │ │ │ │ │
└───┴────┴──────────┴────┴──┘
3. Notes
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
210㎜×297㎜[White Paper (80g/㎡)]
Remarks (Do not include this column in the form)
1. In the Business Plan (Approval) details section, present the approved contents in detail, such as the implementation method and timing.
2. The section on documents reflecting consultation details contains the names of the documents to be reflected, such as design reports, design drawings, budget statements, etc. (hereinafter referred to as "design reports, etc."), for each consultation item, and the consultation
Enter the page number of each document on which the consultation requirement is reflected. If a requirement could not be reflected in a design report, etc. or does not require incorporation, specify the name of a document
that can substantiate whether the requirement was incorporated, and attach a copy of that document.
3. In the remarks column, if the agreed-upon contents could not be reflected, state the specific reason and attach documents verifying this.