Form 1 — 지하안전관리에 관한 특별법 시행규칙

264555 · 2024-07-30

■ Enforcement Rules of the Special Act on Underground Safety Management [Attachment Form No. 1] <Newly Inserted Oct. 31, 2023> Safety Management Plan · Safety Management Regulations Verification Checklist Inspection Overview a. Inspection Target: b. Purpose of Inspection: 2. Inspection Result ┌─────────┬───────────────────────────┬─────┬─────┐ │Classification │Inspection Items │Inspection Results │Results of Measures Taken │ ├─────────┼───────────────────────────┼─────┼─────┤ │A. Safety Management Plan │1) Regarding Ground Safety Review │ │ │ │Compliance Status ├───────────────────────────┼─────┼─────┤ │(Construction Business Operator, │ a) Have temporary earth-retaining structures, such as walls, support members, wales and intermediate piles, │ │ │ │Registered Housing Construction Business Operator │been installed in accordance with the design drawings? │ │ │ │Target) ├───────────────────────────┼─────┼─────┤ │ │ 2) Regarding Measurement Plan │ │ │ │ ├───────────────────────────┼─────┼─────┤ │ │ a) Installation quantity, location, frequency, timing, etc. per measuring instrument │ │ │ │ │Is the measurement management standard being complied with? │ │ │ │ ├───────────────────────────┼─────┼─────┤ │ │ b) Have the monitoring results ever exceeded the monitoring management criteria │ │ │ │ │? │ │ │ │ ├───────────────────────────┼─────┼─────┤ │ │ b-1) (If the monitoring criteria were exceeded) Were the countermeasures specified in the safety management plan │ │ │ │ │implemented? │ │ │ │ ├───────────────────────────┼─────┼─────┤ │ │ 3) Reinforcement of areas vulnerable to ground subsidence and water cutoff measures (where │ │ │ │ │water cutoff grouting is used) │ │ │ │ ├───────────────────────────┼─────┼─────┤ │ │ a) Was a test application of water cutoff grouting carried out? │ │ │ │ ├───────────────────────────┼─────┼─────┤ │ │ b) Was the water cutoff method implemented in accordance with the design drawings? │ │ │ │ ├───────────────────────────┼─────┼─────┤ │ │ c) Has the permeability coefficient established by the test application been │ │ │ │ │achieved? │ │ │ │ ├───────────────────────────┼─────┼─────┤ │ │ 4) Regarding Blasted Rock Excavation Methods (When Excavating Blasted Rock) │ │ │ │ ├───────────────────────────┼─────┼─────┤ │ │ a) Was a test blast conducted to assess the effects of blasting on the area surrounding the construction site │ │ │ │ │? │ │ │ │ ├───────────────────────────┼─────┼─────┤ │ │ b) Are permissible vibration and noise limits being observed during rock blasting │ │ │ │ │? │ │ │ │ ├───────────────────────────┼─────┼─────┤ │ │ 5) Regarding internal and external drainage facilities at construction sites │ │ │ │ ├───────────────────────────┼─────┼─────┤ │ │ a) Are drainage facilities inside and outside the construction site regularly │ │ │ │ │inspected? │ │ │ │ ├───────────────────────────┼─────┼─────┤ │ │ b) Is daily sediment runoff monitored? │ │ │ │ ├───────────────────────────┼─────┼─────┤ │ │ c) Is there any groundwater seepage at the construction site, including from walls and floors │ │ │ │ │? │ │ │ │ ├───────────────────────────┼─────┼─────┤ │ │ c-1) (If groundwater seepage occurs) Have measures under the construction site's groundwater and soil runoff │ │ │ │ │management plan been implemented? │ │ │ │ ├───────────────────────────┼─────┼─────┤ │ │ d) Are drainage channels inside and outside the site inspected and maintained, and is drainage provided during │ │ │ │ │rainfall (via manholes, settling basins, pumps, etc.) │ │ │ │ │? │ │ │ │ ├───────────────────────────┼─────┼─────┤ │ │ 6) Verification of Area Surrounding Excavation │ │ │ │ ├───────────────────────────┼─────┼─────┤ │ │ a) Have CCTV inspections and subsurface geophysical surveys of underground utilities in the area affected by the project │ │ │ │ │been conducted in accordance with the safety management plan │ │ │ │ │before construction and upon its completion, etc.? │ │ │ │ ├───────────────────────────┼─────┼─────┤ │ │ b) After CCTV inspections and subsurface geophysical surveys, have measures under the safety management plan │ │ │ │ │been implemented? │ │ │ ├─────────┼───────────────────────────┼─────┼─────┤ │B. Safety Management Regulations │ 1) Have there been changes in the name, location, scale, use or managing entity of the underground facility │ │ │ │Compliance Status │? │ │ │ │(Applicable to Underground Facility Managers) ├───────────────────────────┼─────┼─────┤ │(Applicable) │ 2) Are management personnel responsible for safety inspection and verification of underground facilities │ │ │ │ │organized and deployed in accordance with the organizational chart │ │ │ │ │? │ │ │ │ ├───────────────────────────┼─────┼─────┤ │ │ 3) Compliance with Safety Inspection Items │ │ │ │ ├───────────────────────────┼─────┼─────┤ │ │ a) Do you possess existing inspection data? │ │ │ │ ├───────────────────────────┼─────┼─────┤ │ │ b) Have you identified previously occurring defects? │ │ │ │ ├───────────────────────────┼─────┼─────┤ │ │ c) Was a visual inspection for ground subsidence performed (at least once a year)? │ │ │ │ ├───────────────────────────┼─────┼─────┤ │ │ d) Was a ground-penetrating radar survey for cavities conducted │ │ │ │ │(at least once every five years)? │ │ │ │ ├───────────────────────────┼─────┼─────┤ │ │ e) If cavities were previously identified, were repair or reinforcement measures │ │ │ │ │taken? │ │ │ │ ├───────────────────────────┼─────┼─────┤ │ │ 4) Are underground facilities and surrounding ground being managed in accordance with measures for ensuring safety and │ │ │ │ │maintenance? │ │ │ │ ├───────────────────────────┼─────┼─────┤ │ │ 5) Are operations conducted according to the emergency response and restoration plan for situations such as ground subsidence │ │ │ │ │? │ │ │ └─────────┴───────────────────────────┴─────┴─────┘ Inspection Date and Time: Year month day Inspector: (Department) (Rank) (Name) (Signature or seal)