Form 19 — 공항시설법 시행규칙
283729 · 2026-02-27
■ Enforcement Rules of the Airport Facilities Act [Form No. 19-3] <Amended Sep. 21, 2018> Aviation Obstruction Lights(www.aviationobstructionlights
etc.kr.
[ ] Aviation Obstruction Light Change Notification
[ ] Aviation Obstruction Day Marker
※ Please refer to the processing procedure at the back, and [ ] should be marked with √ where applicable. (front)
────────────┬─────────────────┬──────────────────────────
Receipt Number │Date of Receipt │Processing Period 15 days
────────────┴─────────────────┴──────────────────────────
───────┬─────────────────────────────────────────────────
Reporting Person │ Representative Name
├─────────────────────────────────────────────────
│ Address
│ (Phone Number: )
───────┴─────────────────────────────────────────────────
───────┬──────────────────────┬──────────────────────────
Obstacle │Location │Obstacle Name
├──────────────────────┴──────────────────────────
│Coordinates(WGS-84)
│N: degree(°) minute(′) seconds (″), east longitude: degree(°) minute(′) sec(")
├──────────────────────┬──────────────────────────
│Location Elevation │Obstacle Type
│Combine: m │
├──────────────────────┼──────────────────────────
│Height (including auxiliary structures such as lightning rods) │Obstacle Size
│On ground (or water surface): m, cavernous: m │Horizontal: m, Vertical: m
├──────────────────────┴──────────────────────────
│Distance from airport/airfield: km, Orientation:
───────┴─────────────────────────────────────────────────
─────────────────────────────────────────────────────────
InstallationDate
─────────────────────────────────────────────────────────
ChangeDate
─────────────────────────────────────────────────────────
Change Details
─────────────────────────────────────────────────────────
───────┬────────────┬────────────────────────────────────
Manager │Name │Telephone Number
───────┴────────────┴────────────────────────────────────
I hereby report as above in accordance with Article 36, Paragraph 6 of the Airport Facilities Act and Article 29, Paragraph 3 of the Enforcement Rules of the same Act.
Year month day
Reporting Person (Signature or seal)
Director of Regional Aviation Administration Your
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
──────┬────────────────────────────────────────────┬─────
Attached Documents │ 1. One copy of the installation drawing for changing indicator lights or signs │Fee
│ 2. Photos of the installation of changed indicator lights or signs (can verify the entire structure including the indicator lights or signs │No
│refers to what is present) Part 1 │
│ 3. Other documents prescribed and notified by the Minister of Land, Infrastructure and Transport │
──────┴────────────────────────────────────────────┴─────
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
ProcessingProcedure
─────────────────────────────────────────────────────────
┌───────┐ ┌──────┐ ┌──────┐ ┌───────────┐ ┌────────────┐
│Preparation of Report │?│Receipt │?│Review │? │Finish Re │?│Receipt of Notice │
└───────┘ └──────┘ └──────┘ └───────────┘ └────────────┘
Reporting Person Processing Agency Processing agency ProcessingAgency Reporting Person
(Regional Aviation Administration) (Regional Aviation Administration) (Regional Aviation Administration)
─────────────────────────────────────────────────────────
210㎜×297㎜[White paper (80g/㎡) or medium paper (80g/㎡)]