Form 19 — 공항시설법 시행규칙

283729 · 2026-02-27

■ Enforcement Rules of the Airport Facilities Act [Attachment Form No. 19] <Amended Mar. 30, 2022> Aviation Obstruction Lights(www.aviationobstructionlights.kr) Applications may also be submitted through that website. [ ] Aviation Obstruction Light Installation Report [ ] Aviation Obstruction Day Marker ※ The reporter must not fill out the dark-colored sections, and [ ]. ────────────┬───────────────────────┬───────────────────── Receipt Number │Receipt Date & Time │Processing Period 15 days ────────────┴───────────────────────┴───────────────────── ──────┬─────────────────────────────────────────────────── Reporting Person │ Representative Name ├─────────────────────────────────────────────────── │ Address │ (Phone Number: ) ──────┴─────────────────────────────────────────────────── ──────┬─────────────────────────────┬───────────────────── Obstacle │Location │Obstacle Name ├─────────────────────────────┴───────────────────── │Coordinates(WGS-84) │N: degree(°) minute(′) seconds (″), east longitude: degree(°) minute(′) sec(") ├─────────────────────────────┬───────────────────── │LocationIndicator │Obstacle Type │Combine: m │ ├─────────────────────────────┼───────────────────── │Height (including auxiliary structures such as lightning rods) │Obstacle Size │On ground (or water surface): m, cavernous: m │Horizontal: m, Vertical: m ├─────────────────────────────┴───────────────────── │Relationship with Airports and Airfields │Distance: km, Orientation: ──────┴─────────────────────────────────────────────────── ──────┬────┬────────────────────────┬───────────────────── flight failure │High Brightness │ A type dog, type B open │Simultaneous Flash Status light indicator ├────┼────────────────────────┼───────────────────── │Medium Brightness │ A type dog, type B dog, type C open │Simultaneous Flash Status ├────┼────────────────────────┼───────────────────── │Low Light │ A type dog, type B dog, type C dog, D type open, E open│Simultaneous Flash Status ──────┼────┴────────────────────────┼───────────────────── flight failure │Painting [ ], cover district [ ], flag [ ] │Painting Weekly Cover │ ├───────────────────── │ │Shape and Color │ ├───────────────────── │ │Other Signage ──────┼─────────────────────────────┴───────────────────── InstallationDate│ ──────┴─────────────────────────────────────────────────── ──────┬─────────────┬───────────────────────────────────── Manager│Name │Telephone Number ──────┴─────────────┴───────────────────────────────────── I hereby report as above in accordance with Article 36, Paragraph 5 of the Airport Facilities Act and Article 29, Paragraph 1 of the Enforcement Rule of the same Act. Year month day Reporting Person (Signature or seal) Director of Regional Aviation Administration To ━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━ ─────┬───────────────────────────────────┬──────────────── Attached Documents│ 1. One drawing including the type, quantity, and installation location of indicator lights or signs │Fee │ 2. Installation photos of indicator lights and signs (showing overall location) 1 copy │No │ 3. Other documents prescribed and notified by the Minister of Land, Infrastructure and Transport │ ─────┴───────────────────────────────────┴──────────────── ━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━ ProcessingProcedure ────────────────────────────────────────────────────────── ┌──────┐ ┌──────┐ ┌──────┐ ┌───────┐ ┌────────────────┐ │Preparation of Report │?│Receipt │? │Review │? │Finish Re │?│Receipt of Notice │ └──────┘ └──────┘ └──────┘ └───────┘ └────────────────┘ Reporting Person Processing Agency Processing agency ProcessingAgency Reporting Person (Regional Aviation Administration) (Regional Aviation Administration) (Regional Aviation Administration) ────────────────────────────────────────────────────────── 210㎜×297㎜[White paper (80g/㎡) or medium paper (80g/㎡)]