Form 101 — 항공안전법 시행규칙
287951 · 2026-07-01
■ Enforcement Rules of the Aviation Safety Act [Form No. 101] <Amended Apr. 9, 2026>
Application for Permission to Transit Korean Airspace
(Application of an Overflight Permission)
※ The applicant shall not fill out the dark-colored sections. (Front)
────────────────────────────┬───────────────────┬───────────────────────────────
Receipt Number │Receipt Date & Time │Processing Period 2 days (urgent navigation required
│ │(Durations) case 6 hours)
────────────────────────────┴───────────────────┴───────────────────────────────
───────────┬───────────┬────────────────────────────────────────────────────────
1.Name and │2.Identifier │3.Route and Time of Navigation
Nationality │and format │
──────┬────┼─────┬─────┼─────────┬─────────────┬───┬────┬───┬────┬───┬────┬─────
Station │port │Aircraft │Aircraft │Transit of Korean Airspace │Operating Days │Exit │Thursday │jin │jin │Port │This │This
Red │empty │Identification │Type │Period │(Days of Operation) │From │Red │Enter │Enter │empty │al │al
│Company │호 │(Aircraft │(Period of overfl │ │ST │Z │Z │Time │TO │ST │Time
(National │(Operato│(Aircraft │-Type) │ight) │ │ │ │Point │간 │ │Point │간
ity) │r) │-identifi │ ├───┬─────┼─┬─┬─┬─┬─┬─┬─┤(Depa │(Desti │(In- │(In- │(Air-w│(In- │(In-
│ │cation) │ │From │TO │M │T │W │T │F │S │S │rture │nation │cheon │cheon │ay) │cheon │cheon
│ │ │ │(from)│(to) │O │U │E │H │R │A │U │Aerodr│Air-po │FIR E │FIR E │ │FIR Ex │FIR Exi
│ │ │ │ │ │N │E │D │U │I │T │N │ome) │rt) │ntry P│ntry Ti │ │it Poin │t Tim
│ │ │ │ │ ├─┼─┼─┼─┼─┼─┼─┤ │ │oint) │me) │ │t) │e)
│ │ │ │ │ │1 │2 │3 │4 │5 │6 │7 │ │ │ │ │ │ │
──────┼────┼─────┼─────┼───┼─────┼─┼─┼─┼─┼─┼─┼─┼───┼────┼───┼────┼───┼────┼─────
│ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │
──────┼────┼─────┼─────┼───┼─────┼─┼─┼─┼─┼─┼─┼─┼───┼────┼───┼────┼───┼────┼─────
│ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │
──────┼────┼─────┼─────┼───┼─────┼─┼─┼─┼─┼─┼─┼─┼───┼────┼───┼────┼───┼────┼─────
│ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │
──────┼────┼─────┼─────┼───┼─────┼─┼─┼─┼─┼─┼─┼─┼───┼────┼───┼────┼───┼────┼─────
│ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │
──────┴────┴─────┴─────┴───┴─────┴─┴─┴─┴─┴─┴─┴─┴───┴────┴───┴────┴───┴────┴─────
────────────────────────────────────────┬───────────────────────────────────────
4.Operator Address │
(Operator Address) │
────────────────────────────────────────┼───────────────────────────────────────
5.Aircraft Registration Code │
(Aircraft Registration Number) │
────────────────────────────────────────┼───────────────────────────────────────
6.Purpose of Navigation │
(Purpose of flight) │
────────────────────────────────────────┼───────────────────────────────────────
7.Names of Captain and Crew │
(Name of the Captain) │
────────────────────────────────────────┼───────────────────────────────────────
8.Passenger's Name and Nationality │
(Name & Nationality of Passengers) │
────────────────────────────────────────┼───────────────────────────────────────
9. Freight List │[ ] Yes [ ] No(No)
- Loading of Dangerous Goods or Military Supplies (Dangerous Goods) │
────────────────────────────────────────┴───────────────────────────────────────
Under Article 100 (1) of the Aviation Safety Act and Article 274 (2) of its Enforcement Rules, I hereby apply for permission to transit the airspace of the Republic of Korea
as specified above.
In accordance with Article 100(1) of Aviation Safety Act and Article 274(2) Enforcement Regulation of Avi
ation Safety Act, I hereby submit application for an overflying permission.
Year month Date of application
Applicant (Signature)
To the Director of Air Traffic Control
(Attention : Administrator of Air Traffic Management Office)
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
────────────┬──────────────────────────────────────────────────────┬────────────
Attached Documents │One copy of the detailed cargo manifest in the case of loading dangerous goods or military supplies, etc., under Item 9 (Details of Cargo) │Fee
│In accordance with Article 9, If Dangerous Goods are boarded, Submit a detail Freight List │None
────────────┴──────────────────────────────────────────────────────┴────────────
210㎜×297㎜[White paper (80g/㎡) or medium paper (80g/㎡)]
(Back)
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
Important Notes
───────────────────────────────────────────
The application form must be submitted at least 2 days prior to the scheduled date of operation. However, in any of the following cases, 6 hours before the scheduled time of operation
before the scheduled time of operation.
1. Natural disaster or severe weather
2. In cases where urgent maintenance is required for the safe operation of the aircraft
3. Patient Transfer
4. Other reasons equivalent to Subparagraphs 1 through 3
───────────────────────────────────────────
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
ProcessingProcedure
───────────────────────────────────────────
This application will be processed as follows.
───────────┬───────────────────────────────
Applicant │ProcessingAgency
├───────────────────────────────
│Air Traffic Control
───────────┼───────────────────────────────
│
┌──────┐ ┌─────────────┐
│Fill out application form │Submit ▶ │Receipt │
│ ├──┬─ │ │
│ │ │ │ │
└──────┘ │ └┬────────────┘
│ │
│ │
│
│ ▼
│ ┌─────────────┐
│ │Review │
│ │(Compliance with Regulations and Operational Requirements │
│ │Check) │
┌──────┐ │ │ ┌─────┐
│Receipt of Notification │◀ ResultNotification│ │Notification ▶│Related Organizations │
│ │ ─┬───┤ ├──── │ │
│ │ │ │ │ │ │
└──────┘ │ └─────────────┘ └─────┘
│
───────────┴───────────────────────────────