Form 29 — 항공안전법 시행규칙
287951 · 2026-07-01
■ Enforcement Rules of the Aviation Safety Act [Attachment Form No. 29]
Application for Certificate of Manufacturer of Parts, etc.
Application for Parts Manufacturer Approval
※ The applicant shall not fill out the dark-colored sections. (Front)
─────────────────┬───────┬──────────────────────────────────────
Receipt Number │Receipt Date & Time │Processing Period 30days
│ │(Durations)
─────────────────┴───────┴──────────────────────────────────────
────────┬───────────────┬───────────────────────────────────────
Applicant │Name or Title │Date of Birth
(Applicant)│Name │Date of Birth
├───────────────┴───────────────────────────────────────
│Address
│Address Tel:
────────┴───────────────────────────────────────────────────────
────────────────────────────────────────────────────────────────
Applicable aircraft, etc.
Eligible Product Model
────────────────────────────────────────────────────────────────
Applicable parts, etc.
Eligible Parts
────────────────────────────────────────────────────────────────
Application for certification parts, etc.
Parts for PMA
────────────────────────────────────────────────────────────────
QualitySystem
Quality Control System
────────────────────────────────────────────────────────────────
Manufacturer's Name
Name of Manufacturer
────────────────────────────────────────────────────────────────
Manufacturing Plant Location
Location of Manufacturing Facility
────────────────────────────────────────────────────────────────
Designer's Name or Designation
Name of Designer
────────────────────────────────────────────────────────────────
Designer Address
Address of Designer
────────────────────────────────────────────────────────────────
Remarks
Remarks
────────────────────────────────────────────────────────────────
Attaching relevant documents to obtain a Certificate of Manufacturer of Parts, etc. pursuant to Article 28, Paragraph 1 of the Aviation Safety Act and Article 61, Paragraph 1 of the Enforcement Rule of the same Act
and hereby submit the application with the required documents attached.
In accordance with Paragraph 1, Article 28 of Aviation Safety Act and Paragraph 1, Article 61 of Enforcement Regulatio
n of Aviation Safety Act, I hereby apply for Parts Manufacturer Approval and submit herewith the required documents.
Year month day
Applicant (Signature or seal)
Applicant (Signature)
Minister of Land, Infrastructure and Transport To
Attention: Minister of Ministry of Land, Infrastructure and Transport
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
───────┬─────────────────────────────────────────────┬──────────
Attached Documents │ 1. Copy of Part Identification Document │Fee
(Documents) │ 2. Plan of Certification or Confirmation of Conformity to Aircraft Technical Standards (Copy of Certification Plan or Co │「Aviation Safety Act
│mpliance Statements) │Enforcement Rule No. 321
│ 3. Design drawings of parts, etc., list of design drawings and list of parts, etc. (Each copy of Design Drawings and │Fee determined by the section
│Drawings List, Parts List) │
│ 4. Manufacturing Specifications and Product Specifications of Parts, etc. (Each copy of Manufacturing Specifications and Pro │
│duct Specification) │
│ 5. Quality control regulations for parts, etc. (Copy of Quality Control Manual) │
│ 6. Documents explaining the airworthiness maintenance and management system for the relevant parts, etc. (Copy of Description Docume │
│nt for Continued Airworthiness and Traceability System of the Parts) │
│ 7. Other reference documents (Copy of Reference Documents) │
───────┴─────────────────────────────────────────────┴──────────
210mm×297mm[White paper (80g/㎡) or medium paper (80g/㎡)]
(rear)
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
How to write
─────────────────────────────────
① Applicant's Name or Name: Write the applicant's name or corporate name.
② Resident Registration Number: Enter the applicant's Resident Registration Number or Corporate Registration Number.
③ Applicant's Address: Enter the applicant's address.
④ Applicable Aircraft, etc.: Write the name or designation of the type certificate holder and the model name of the aircraft, engine, or propeller on which the part of this application will be installed.
⑤ Applicable Parts: Enter the manufacturer's name, part name, part number, and drawing number for the parts of the Type Certificated aircraft, etc., that are to be replaced or modified by this application.
⑥ Parts for Certification Application: Enter the part name, part number, and drawing number for the parts, etc. for which you wish to obtain a Manufacturer's Certificate through this application.
⑤ Quality Assurance System: An accredited quality system (ISO9001, AS9100, Defense Quality System, etc.) operating at the factory where the parts, etc. approved through this application will be manufactured
and its certification dates, or describe the quality system operated internally under the applicable requirements.
⑧ Manufacturer's Name or Designation: Write the name or designation of the manufacturer who will produce the parts, etc. certified through this application.
⑨ Manufacturing Plant Location: Enter the address of the factory where the parts certified through this application will be manufactured.
⑩ Designer's Name or Title: Write the name or title of the designer holding the design rights to the relevant parts, etc. for which the Certificate of Manufacturer of Parts, etc. is being applied.
⑪ Designer's Address: Enter the address of the designer of the relevant part, etc. for which you are applying for the Certificate of Manufacturer of Parts, etc.
⑫ Remarks: The method of design verification (testing and calculations, identity, license agreement, supplementary type certification) and other matters regarding the relevant parts, etc. for which a Certificate of Manufacturer of Parts, etc. is applied
.
─────────────────────────────────
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
Processing Procedure
─────────────────────────────────
This application will be processed as follows.
────────────────┬────────────────
Applicant │Processing Agency (Department in Charge)
├────────────────
│Ministry of Land, Infrastructure and Transport (Department in charge of aviation technology)
────────────────┼────────────────
│
┌──────┐ │ ┌──┐
│Fill out application │Submit │ ▶│Registration│
│ ├───────┼─ │ │
│ │ │ │ │
└──────┘ │ └─┬┘
│ │
│
│ ▼ Instruction for Processing Plan
│ ┌──┐
│ │Preliminary review│
│ └─┬┘
│ │
│
│ ▼ Test Schedule/Location
│ ┌──┐and Inspector Decision
│ │Review│
│ └─┬┘
│ │
TestInitial │
PlanNotification │ ▼
┌──────┐ │ ┌──┐
│Prepare │◀ │ │Approval│
│ │ ──────┼──┤ │
│ │ │ │ │
└──────┘ │ └─┬┘
│ │
│
│ ▼
│ ┌──┐
│ │Perform test│
│ └─┬┘
│ │
│
Result Notification │ ▼
┌──────┐ │ ┌──┐
│Receipt of Certificate │◀ │ │Approval│
│ │ ──────┼──┤ │
│ │ │ │ │
└──────┘ │ └──┘
│
────────────────┴────────────────