Form 26 — 항공안전법 시행규칙

287951 · 2026-07-01

■ Enforcement Rules of the Aviation Safety Act [Attachment Form No. 26] Application for Technical Standard Type Approval Application for Technical Standard Order Authorization ※ The applicant shall not fill out the dark-colored sections. (Front) ─────────────────┬───────┬───────────────────────────────────────── Receipt Number │Receipt Date & Time │Processing Period 30days │ │(Durations) ─────────────────┴───────┴───────────────────────────────────────── ────────┬───────────────┬────────────────────────────────────────── Applicant │Name or Title │Date of Birth (Applicant) │Name │Date of Birth ├───────────────┴────────────────────────────────────────── │Address │Address Tel: ────────┴────────────────────────────────────────────────────────── ─────────────────────────────────────────────────────────────────── Technical Standard Product Name Name of TSO ─────────────────────────────────────────────────────────────────── Technical Standard Part Number Part Number of TSO ─────────────────────────────────────────────────────────────────── Applicable Minimum Performance Standard Applicable MPS ─────────────────────────────────────────────────────────────────── Quality System Name Title of QC System ─────────────────────────────────────────────────────────────────── Manufacturer's Name Name of Manufacturer ─────────────────────────────────────────────────────────────────── Manufacturing Plant Location Location of Manufacturing Facility ─────────────────────────────────────────────────────────────────── Designer's Name or Designation Name of Designer ─────────────────────────────────────────────────────────────────── DesignerAddress Address of Designer ─────────────────────────────────────────────────────────────────── Remarks Remarks ─────────────────────────────────────────────────────────────────── Under Article 27 (1) of the Aviation Safety Act and Article 55 (1) of its Enforcement Rules, I hereby apply for type approval of technical standard products I am applying with the attached documents. In accordance with Paragraph 1, Article 27 of Aviation Safety Act and Paragraph 1, Article 55 of Enforcement Regulatio n of Aviation Safety Act, I hereby apply for Technical Standard Order Authorization and submit herewith the required docu ments. Year month day Applicant (Signature or seal) Applicant (Signature) Minister of Land, Infrastructure and Transport To Attention: Minister of Ministry of Land, Infrastructure and Transport ━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━ ───────┬──────────────────────────────────────────────┬──────────── Attached Documents │ 1. Plan or Confirmation of Demonstration of Conformity to Technical Standards and Type Approval Criteria (Copy of Certification │Fee (Documents) │Plan or Compliance Statements) │「Aviation Safety Act │ 2. Design Drawings, List of Design Drawings, and List of Parts of Technical Standard Products (Each copy of Design Drawings an │In Article 321 of the Enforcement Rules │d Drawings List, Parts List) │Fixed fee │ 3. Manufacturing Specifications and Product Specifications of Technical Standard Products (Each copy of Manufacturing Specifications an │ │d Product Specification) │ │ 4. Quality Control Regulations for Technical Standards (Copy of Quality Control Manual) │ │ 5. Documents explaining the airworthiness maintenance and management system of the relevant technical standard product (Copy of Description Document │ │for Continued Airworthiness and Traceability System of the TSO Parts) │ │ 6. Other reference documents (Copy of Reference Documents) │ ───────┴──────────────────────────────────────────────┴──────────── 210mm×297mm[White paper (80g/㎡) or medium paper (80g/㎡)] (rear) ━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━ ━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━ ProcessingProcedure ───────────────────────────────── This application will be processed as follows. ────────────────┬──────────────── Applicant │Processing Agency (Department in Charge) ├──────────────── │Ministry of Land, Infrastructure and Transport (Department in charge of aviation technology) ────────────────┼──────────────── │ ┌──────┐ │ ┌──┐ │Fill out application │Submit │ ▶│Registration│ │ ├───────┼─ │ │ │ │ │ │ │ └──────┘ │ └─┬┘ │ │ │ │ ▼ Instruction for Processing Plan │ ┌──┐ │ │Preliminary review│ │ └─┬┘ │ │ │ │ ▼ Test Schedule/Location │ ┌──┐and Inspector Decision │ │Review│ │ └─┬┘ │ │ ImplementationPlan │ Tong Ji │ ▼ ┌──────┐ │ ┌──┐ │Prepare │◀ │ │Approval│ │ │ ──────┼──┤ │ │ │ │ │ │ └──────┘ │ └─┬┘ │ │ │ │ ▼ │ ┌──┐ │ │Conduct Evaluation│ │ └─┬┘ │ │ │ Result Notification │ ▼ ┌──────┐ │ ┌──┐ │Receipt of Certificate │◀ │ │Approval│ │ │ ──────┼──┤ │ │ │ │ │ │ └──────┘ │ └──┘ │ ────────────────┴────────────────